{"title":"线性连续- k - of - n: f系统的预防性维护策略","authors":"A. Endharta, W. Yun, Hisashi Yamamoto","doi":"10.15807/JORSJ.59.334","DOIUrl":null,"url":null,"abstract":"Linear consecutive- k -out-of- n : F systems are considered. It is assumed that the components are independent and the component failure times follow an exponential distribution with identical failure rate. It is also assumed that there are only two component states (working and failed) and we can know the component state at any time. If there is at least one minimal cut set consisting of one working component, the system will be preventively maintained after a certain time interval. If the system fails before reaching the preventive maintenance (PM) time, the failed components are replaced by the new ones. The optimal PM interval time which minimizes the expected cost rate is obtained. The performance of the proposed policy is evaluated by comparing the expected cost rate of the proposed policy with those of corrective maintenance (CM) and age PM policy.","PeriodicalId":51107,"journal":{"name":"Journal of the Operations Research Society of Japan","volume":"59 1","pages":"334-346"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.15807/JORSJ.59.334","citationCount":"13","resultStr":"{\"title\":\"PREVENTIVE MAINTENANCE POLICY FOR LINEAR CONSECUTIVE-K-OUT-OF-N: F SYSTEM\",\"authors\":\"A. Endharta, W. Yun, Hisashi Yamamoto\",\"doi\":\"10.15807/JORSJ.59.334\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Linear consecutive- k -out-of- n : F systems are considered. It is assumed that the components are independent and the component failure times follow an exponential distribution with identical failure rate. It is also assumed that there are only two component states (working and failed) and we can know the component state at any time. If there is at least one minimal cut set consisting of one working component, the system will be preventively maintained after a certain time interval. If the system fails before reaching the preventive maintenance (PM) time, the failed components are replaced by the new ones. The optimal PM interval time which minimizes the expected cost rate is obtained. The performance of the proposed policy is evaluated by comparing the expected cost rate of the proposed policy with those of corrective maintenance (CM) and age PM policy.\",\"PeriodicalId\":51107,\"journal\":{\"name\":\"Journal of the Operations Research Society of Japan\",\"volume\":\"59 1\",\"pages\":\"334-346\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.15807/JORSJ.59.334\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Operations Research Society of Japan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15807/JORSJ.59.334\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Decision Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Operations Research Society of Japan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15807/JORSJ.59.334","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 13
摘要
考虑线性连续- k -out- n: F系统。假设各部件是独立的,各部件的失效次数服从相同故障率的指数分布。同时假设组件只有两种状态(工作状态和故障状态),我们可以随时知道组件的状态。如果至少有一个由一个工作部件组成的最小切割集,则系统将在一定的时间间隔后进行预防性维护。如果在巡检时间前系统出现故障,则更换故障部件。得到了使期望成本率最小的最优维修间隔时间。通过将建议策略的预期成本率与纠正维护(CM)和老化PM策略的预期成本率进行比较,可以评估建议策略的性能。
PREVENTIVE MAINTENANCE POLICY FOR LINEAR CONSECUTIVE-K-OUT-OF-N: F SYSTEM
Linear consecutive- k -out-of- n : F systems are considered. It is assumed that the components are independent and the component failure times follow an exponential distribution with identical failure rate. It is also assumed that there are only two component states (working and failed) and we can know the component state at any time. If there is at least one minimal cut set consisting of one working component, the system will be preventively maintained after a certain time interval. If the system fails before reaching the preventive maintenance (PM) time, the failed components are replaced by the new ones. The optimal PM interval time which minimizes the expected cost rate is obtained. The performance of the proposed policy is evaluated by comparing the expected cost rate of the proposed policy with those of corrective maintenance (CM) and age PM policy.
期刊介绍:
The journal publishes original work and quality reviews in the field of operations research and management science to OR practitioners and researchers in two substantive categories: operations research methods; applications and practices of operations research in industry, public sector, and all areas of science and engineering.