发展计划物流运输可可农业可可佛得角皮迪查亚省亚齐

Yusriana Yusriana, Rachman Jaya
{"title":"发展计划物流运输可可农业可可佛得角皮迪查亚省亚齐","authors":"Yusriana Yusriana, Rachman Jaya","doi":"10.17969/JTIPI.V5I1.999","DOIUrl":null,"url":null,"abstract":"Factual problems of the cocoa bean agroindustry at Pidie Jaya District, Aceh Province were large distances between farmers and processor, thus determining the shortest part route, backhaul location and quality risk becomes critically to the assess. The objective this research are to determine shortest route based on the location of suppliers, back location, and risk quality recommendations. Requirement of shortest part route solved by Algorithm Djisktra, Backhaul location with MPE and Risk management quality by Multi Expert Multi Criteria Decision Making, aggregation criteria with OWA. The result of the study shows that the shortest distance suppliers Aceh Timur District was 282km, Aceh Utara District 116km, Bireuen District 57km, Pidie District 24km and Aceh Tenggara District 391km. Backhaul location sat Aceh Tengah District with a value of MPE(6533). Alternative of quality risk management were direct fermentation, improvement of transport facilities and container with a high rating criteria, thus the agroindustry has to focus on this dimension.","PeriodicalId":31317,"journal":{"name":"Jurnal Teknologi dan Industri Pertanian Indonesia","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2013-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Rancang Bangun Transportasi Logistik Kakao Agroindustri Coklat Kabupaten Pidie Jaya Provinsi Aceh\",\"authors\":\"Yusriana Yusriana, Rachman Jaya\",\"doi\":\"10.17969/JTIPI.V5I1.999\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Factual problems of the cocoa bean agroindustry at Pidie Jaya District, Aceh Province were large distances between farmers and processor, thus determining the shortest part route, backhaul location and quality risk becomes critically to the assess. The objective this research are to determine shortest route based on the location of suppliers, back location, and risk quality recommendations. Requirement of shortest part route solved by Algorithm Djisktra, Backhaul location with MPE and Risk management quality by Multi Expert Multi Criteria Decision Making, aggregation criteria with OWA. The result of the study shows that the shortest distance suppliers Aceh Timur District was 282km, Aceh Utara District 116km, Bireuen District 57km, Pidie District 24km and Aceh Tenggara District 391km. Backhaul location sat Aceh Tengah District with a value of MPE(6533). Alternative of quality risk management were direct fermentation, improvement of transport facilities and container with a high rating criteria, thus the agroindustry has to focus on this dimension.\",\"PeriodicalId\":31317,\"journal\":{\"name\":\"Jurnal Teknologi dan Industri Pertanian Indonesia\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Teknologi dan Industri Pertanian Indonesia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17969/JTIPI.V5I1.999\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknologi dan Industri Pertanian Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17969/JTIPI.V5I1.999","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

亚齐省Pidie Jaya地区可可豆农业的实际问题是农民和加工商之间距离很远,因此确定最短的部分路线、回程地点和质量风险对评估至关重要。本研究的目的是根据供应商的位置,后台位置和风险质量建议确定最短路线。用Djisktra算法求解最短距离路由需求,用MPE算法求解回程定位,用多专家多准则决策求解风险管理质量,用OWA算法求解聚合准则。研究结果表明,亚齐铁木尔区距离最短,为282km,亚齐乌塔拉区为116km,比鲁恩区为57km,皮迪区为24km,亚齐登加拉区为391km。回程位置位于亚齐登加区,值为MPE(6533)。质量风险管理的替代方法是直接发酵、改善运输设施和具有高评级标准的容器,因此农业工业必须重点关注这一维度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Rancang Bangun Transportasi Logistik Kakao Agroindustri Coklat Kabupaten Pidie Jaya Provinsi Aceh
Factual problems of the cocoa bean agroindustry at Pidie Jaya District, Aceh Province were large distances between farmers and processor, thus determining the shortest part route, backhaul location and quality risk becomes critically to the assess. The objective this research are to determine shortest route based on the location of suppliers, back location, and risk quality recommendations. Requirement of shortest part route solved by Algorithm Djisktra, Backhaul location with MPE and Risk management quality by Multi Expert Multi Criteria Decision Making, aggregation criteria with OWA. The result of the study shows that the shortest distance suppliers Aceh Timur District was 282km, Aceh Utara District 116km, Bireuen District 57km, Pidie District 24km and Aceh Tenggara District 391km. Backhaul location sat Aceh Tengah District with a value of MPE(6533). Alternative of quality risk management were direct fermentation, improvement of transport facilities and container with a high rating criteria, thus the agroindustry has to focus on this dimension.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
7
审稿时长
12 weeks
期刊最新文献
Pemanfaatan Tepung Biji Labu Kuning Dalam Pembuatan Pie Susu Sebagai Alternatif Camilan Sumber Zink Identifikasi Senyawa Metabolit Sekunder Pada Rumput Laut Coklat (Sargassum plagyophyllum) Dengan Metode Fraksinasi Pengembangan Produk Inovasi Pengharum Mobil Berbasis Nilam Berdasarkan Respon Pelanggan dan Analisis SWOT Apilikasi Matematika Linear Dalam Penyusunan Formulasi Optimum Pencampuran Kopi Arabika Gayo (Coffeea Arabica. L) Kajian Hazard Analysis Critical Control Point (HACCP) Pada Tahap Pasteurisasi II Susu ISAM Di PT Industri Susu Alam Murni
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1