{"title":"首次下入设计:用于单趟完井的压力激活滑套","authors":"A. Dikshit, Amrendra Kumar, G. Woiceshyn","doi":"10.2118/203057-PA","DOIUrl":null,"url":null,"abstract":"Interest is high in a method to reliably run single-trip completions without involving complex/expensive technologies (Robertson et al. 2019). The reward for such a design would be reduced rig time, safety risks, and completion costs. As described herein, a unique pressure-activated sliding side door (PSSD) valve was developed and field tested to open without intervention after completion is circulated to total depth (TD) and a liner hanger and openhole isolation packers are set. A field-proven sliding-sleeve door (SSD) valve that required shifting via a shifting tool run on coiled tubing, slickline (SL), or wireline was upgraded to open automatically after relieving tubing pressure once packers (and/or a liner hanger) are set. This PSSD technology, which is integrable to almost any type of sand control screen, is equipped with a backup contingency should the primary mechanism fail to open. Once opened, the installed PSSDs can be shifted mechanically with unlimited frequency. The two- or three-position valve can be integrated with inflow control devices (ICDs) (includes autonomous ICDs/autonomous inflow control valves) and allows mechanical shifting at any time after installation to close, stimulate or adjust ICD settings. After a computer-aided design stage to achieve all the operational/mechanical requirements, prototypes were built and tested, followed by field installations. The design stage provided some challenges even though the pressure-activation feature was being added to a mature/proven SSD technology. Prototype testing in a full-scale vertical test well proved valuable because it revealed failure modes that could not have appeared in the smaller-scale laboratory test facilities. Lessons learned from the first field trial helped improve onsite handling procedures. The production logging tool run on first installation confirmed the PSSDs with ICDs opened as designed. The second field installation involved a different size and configuration, in which PSSDs with ICDs performed as designed. The unique two- or three-position PSSD accommodates any type of sand control or debris screen and any type of ICD for production/injection. The PSSD allows the flexibility to change ICD size easily at the wellsite. Therefore, this technology can be used in carbonate as well as sandstone wells. Wells that normally could not justify the expense of existing single-trip completion technologies can now benefit from the cost savings of single-trip completions, including ones that require ICD and stimulation options.","PeriodicalId":51165,"journal":{"name":"SPE Drilling & Completion","volume":"1 1","pages":"1-14"},"PeriodicalIF":1.3000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Design to First Deployment: Pressure-Activated Sliding Sleeve for Single-Trip Completion\",\"authors\":\"A. Dikshit, Amrendra Kumar, G. Woiceshyn\",\"doi\":\"10.2118/203057-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Interest is high in a method to reliably run single-trip completions without involving complex/expensive technologies (Robertson et al. 2019). The reward for such a design would be reduced rig time, safety risks, and completion costs. As described herein, a unique pressure-activated sliding side door (PSSD) valve was developed and field tested to open without intervention after completion is circulated to total depth (TD) and a liner hanger and openhole isolation packers are set. A field-proven sliding-sleeve door (SSD) valve that required shifting via a shifting tool run on coiled tubing, slickline (SL), or wireline was upgraded to open automatically after relieving tubing pressure once packers (and/or a liner hanger) are set. This PSSD technology, which is integrable to almost any type of sand control screen, is equipped with a backup contingency should the primary mechanism fail to open. Once opened, the installed PSSDs can be shifted mechanically with unlimited frequency. The two- or three-position valve can be integrated with inflow control devices (ICDs) (includes autonomous ICDs/autonomous inflow control valves) and allows mechanical shifting at any time after installation to close, stimulate or adjust ICD settings. After a computer-aided design stage to achieve all the operational/mechanical requirements, prototypes were built and tested, followed by field installations. The design stage provided some challenges even though the pressure-activation feature was being added to a mature/proven SSD technology. Prototype testing in a full-scale vertical test well proved valuable because it revealed failure modes that could not have appeared in the smaller-scale laboratory test facilities. Lessons learned from the first field trial helped improve onsite handling procedures. The production logging tool run on first installation confirmed the PSSDs with ICDs opened as designed. The second field installation involved a different size and configuration, in which PSSDs with ICDs performed as designed. The unique two- or three-position PSSD accommodates any type of sand control or debris screen and any type of ICD for production/injection. The PSSD allows the flexibility to change ICD size easily at the wellsite. Therefore, this technology can be used in carbonate as well as sandstone wells. Wells that normally could not justify the expense of existing single-trip completion technologies can now benefit from the cost savings of single-trip completions, including ones that require ICD and stimulation options.\",\"PeriodicalId\":51165,\"journal\":{\"name\":\"SPE Drilling & Completion\",\"volume\":\"1 1\",\"pages\":\"1-14\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SPE Drilling & Completion\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.2118/203057-PA\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, PETROLEUM\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SPE Drilling & Completion","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.2118/203057-PA","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 1

摘要

人们对一种不涉及复杂/昂贵技术的可靠单趟完井方法非常感兴趣(Robertson et al. 2019)。这种设计将减少钻井时间、安全风险和完井成本。如上所述,开发了一种独特的压力激活滑动侧门(PSSD)阀,并进行了现场测试,该阀在完井循环至总深度(TD)后无需干预即可打开,并安装了尾管悬挂器和裸眼隔离封隔器。一种经过现场验证的滑套门(SSD)阀,需要在连续油管、钢丝绳(SL)或电缆上通过移动工具进行移动,一旦封隔器(和/或尾管悬挂器)坐封,即可在释放油管压力后自动打开。该PSSD技术可与几乎任何类型的防砂筛管集成,并且在主防砂筛管无法打开时配备了备用应急装置。一旦打开,安装的pssd可以无限频率地机械移动。双位或三位阀可与流入控制装置(ICD)集成(包括自主ICD /自主流入控制阀),并允许在安装后的任何时间进行机械切换,以关闭、刺激或调整ICD设置。在经过计算机辅助设计阶段以满足所有操作/机械要求之后,建造并测试了原型,随后进行了现场安装。尽管压力激活功能已被添加到成熟/经过验证的SSD技术中,但设计阶段仍存在一些挑战。在全尺寸垂直测试井中进行的原型测试证明是有价值的,因为它揭示了在小型实验室测试设施中无法出现的失效模式。从第一次现场试验中吸取的经验教训有助于改进现场处理程序。首次安装时运行的生产测井工具确认带有icd的pssd按设计打开。第二次现场安装涉及不同的尺寸和配置,其中带有icd的pssd按照设计执行。独特的两个或三个位置PSSD适用于任何类型的防砂或碎屑筛管以及任何类型的生产/注入ICD。PSSD可以灵活地在井场轻松更改ICD尺寸。因此,该技术既可用于碳酸盐岩井,也可用于砂岩井。那些通常无法承受现有单趟完井技术成本的井,现在可以从单趟完井技术中节省成本,包括那些需要ICD和增产措施的井。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design to First Deployment: Pressure-Activated Sliding Sleeve for Single-Trip Completion
Interest is high in a method to reliably run single-trip completions without involving complex/expensive technologies (Robertson et al. 2019). The reward for such a design would be reduced rig time, safety risks, and completion costs. As described herein, a unique pressure-activated sliding side door (PSSD) valve was developed and field tested to open without intervention after completion is circulated to total depth (TD) and a liner hanger and openhole isolation packers are set. A field-proven sliding-sleeve door (SSD) valve that required shifting via a shifting tool run on coiled tubing, slickline (SL), or wireline was upgraded to open automatically after relieving tubing pressure once packers (and/or a liner hanger) are set. This PSSD technology, which is integrable to almost any type of sand control screen, is equipped with a backup contingency should the primary mechanism fail to open. Once opened, the installed PSSDs can be shifted mechanically with unlimited frequency. The two- or three-position valve can be integrated with inflow control devices (ICDs) (includes autonomous ICDs/autonomous inflow control valves) and allows mechanical shifting at any time after installation to close, stimulate or adjust ICD settings. After a computer-aided design stage to achieve all the operational/mechanical requirements, prototypes were built and tested, followed by field installations. The design stage provided some challenges even though the pressure-activation feature was being added to a mature/proven SSD technology. Prototype testing in a full-scale vertical test well proved valuable because it revealed failure modes that could not have appeared in the smaller-scale laboratory test facilities. Lessons learned from the first field trial helped improve onsite handling procedures. The production logging tool run on first installation confirmed the PSSDs with ICDs opened as designed. The second field installation involved a different size and configuration, in which PSSDs with ICDs performed as designed. The unique two- or three-position PSSD accommodates any type of sand control or debris screen and any type of ICD for production/injection. The PSSD allows the flexibility to change ICD size easily at the wellsite. Therefore, this technology can be used in carbonate as well as sandstone wells. Wells that normally could not justify the expense of existing single-trip completion technologies can now benefit from the cost savings of single-trip completions, including ones that require ICD and stimulation options.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
SPE Drilling & Completion
SPE Drilling & Completion 工程技术-工程:石油
CiteScore
4.20
自引率
7.10%
发文量
29
审稿时长
6-12 weeks
期刊介绍: Covers horizontal and directional drilling, drilling fluids, bit technology, sand control, perforating, cementing, well control, completions and drilling operations.
期刊最新文献
Combining Magnetic and Gyroscopic Surveys Provides the Best Possible Accuracy Applications of Machine Learning Methods to Predict Hole Cleaning in Horizontal and Highly Deviated Wells Experimental Investigation of Geopolymers for Application in High-Temperature and Geothermal Well Cementing Analysis of Riser Gas Pressure from Full-Scale Gas-in-Riser Experiments with Instrumentation Correlating Surface and Downhole Perforation Entry Hole Measurements Leads to Development of Improved Perforating Systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1