{"title":"Grobplanung roboterbasiterfly / montagessystem /汽车车身车间生产计划-模型与优化-机器人装配线系统的粗略规划","authors":"G. Wrobel, Ralf-Erik Ebert, R. Scheffler","doi":"10.37544/1436-4980-2023-04-40","DOIUrl":null,"url":null,"abstract":"Zwischen Produktentwicklung und Produktionsplanung besteht seit vielen Jahren eine Digitalisierungslücke. Geeignete Softwarewerkzeuge zur Kosten- und Raumabschätzung in der Phase der Grobplanung roboterbasierter Fließmontagesysteme existieren nicht. Abhilfe schaffen Verfahren zum modellbasierten Engineering, die eine durchgängige und flexible Anlagenplanung ermöglichen. Ein dafür erforderliches Optimierungsverfahren und das ihm zu Grunde liegende Modell werden in diesem Beitrag vorgestellt. A digitization gap has existed between product development and production planning for many years. There is a lack of suitable software tools to estimate the costs and space of robotic assembly line systems. This is remedied by methods of model-based engineering, which allow for consistent and flexible plant planning. The solution involves an optimization procedure developed for this purpose and its underlying model, which enable fast and reliable rough planning.","PeriodicalId":37621,"journal":{"name":"WT Werkstattstechnik","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Grobplanung roboterbasierter Fließmontagesysteme/Production planning for automotive body shop – model and optimization – Rough Planning of Robotic Assembly Line Systems\",\"authors\":\"G. Wrobel, Ralf-Erik Ebert, R. Scheffler\",\"doi\":\"10.37544/1436-4980-2023-04-40\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Zwischen Produktentwicklung und Produktionsplanung besteht seit vielen Jahren eine Digitalisierungslücke. Geeignete Softwarewerkzeuge zur Kosten- und Raumabschätzung in der Phase der Grobplanung roboterbasierter Fließmontagesysteme existieren nicht. Abhilfe schaffen Verfahren zum modellbasierten Engineering, die eine durchgängige und flexible Anlagenplanung ermöglichen. Ein dafür erforderliches Optimierungsverfahren und das ihm zu Grunde liegende Modell werden in diesem Beitrag vorgestellt. A digitization gap has existed between product development and production planning for many years. There is a lack of suitable software tools to estimate the costs and space of robotic assembly line systems. This is remedied by methods of model-based engineering, which allow for consistent and flexible plant planning. The solution involves an optimization procedure developed for this purpose and its underlying model, which enable fast and reliable rough planning.\",\"PeriodicalId\":37621,\"journal\":{\"name\":\"WT Werkstattstechnik\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"WT Werkstattstechnik\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37544/1436-4980-2023-04-40\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"WT Werkstattstechnik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37544/1436-4980-2023-04-40","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
Grobplanung roboterbasierter Fließmontagesysteme/Production planning for automotive body shop – model and optimization – Rough Planning of Robotic Assembly Line Systems
Zwischen Produktentwicklung und Produktionsplanung besteht seit vielen Jahren eine Digitalisierungslücke. Geeignete Softwarewerkzeuge zur Kosten- und Raumabschätzung in der Phase der Grobplanung roboterbasierter Fließmontagesysteme existieren nicht. Abhilfe schaffen Verfahren zum modellbasierten Engineering, die eine durchgängige und flexible Anlagenplanung ermöglichen. Ein dafür erforderliches Optimierungsverfahren und das ihm zu Grunde liegende Modell werden in diesem Beitrag vorgestellt. A digitization gap has existed between product development and production planning for many years. There is a lack of suitable software tools to estimate the costs and space of robotic assembly line systems. This is remedied by methods of model-based engineering, which allow for consistent and flexible plant planning. The solution involves an optimization procedure developed for this purpose and its underlying model, which enable fast and reliable rough planning.