根据尼日利亚的选择标准对建筑采购方法的绩效进行基准测试

S. Ojo
{"title":"根据尼日利亚的选择标准对建筑采购方法的绩效进行基准测试","authors":"S. Ojo","doi":"10.9744/CED.11.2.PP.","DOIUrl":null,"url":null,"abstract":"The study developed performance indices by the widely used procurement options in Nigeria on selection criteria. The traditional mean and standardized ratio were used to form the utility coefficients. Results revealed that performance by the procurement options depended on the respondents’ categorization and cost categorization of projects. Public clients ranked the lump sum contracts more able to achieve speed for projects up to N100 million (Naira) while the private clients believe it is the design-build. As regards quality, public clients rated the Build-Own-Operate-Transfer (BOOT) system as most able to achieve the quality criterion whereas private clients rated design-build for projects up to N100 million (Naira). The study then concluded that, in the Nigerian construction industry participants do not agree on the performance of the procurement options on selection criteria.","PeriodicalId":30107,"journal":{"name":"Civil Engineering Dimension","volume":"11 1","pages":"106-112"},"PeriodicalIF":0.0000,"publicationDate":"2009-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"23","resultStr":"{\"title\":\"Benchmarking the Performance of Construction Procurement Methods against Selection Criteria in Nigeria\",\"authors\":\"S. Ojo\",\"doi\":\"10.9744/CED.11.2.PP.\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study developed performance indices by the widely used procurement options in Nigeria on selection criteria. The traditional mean and standardized ratio were used to form the utility coefficients. Results revealed that performance by the procurement options depended on the respondents’ categorization and cost categorization of projects. Public clients ranked the lump sum contracts more able to achieve speed for projects up to N100 million (Naira) while the private clients believe it is the design-build. As regards quality, public clients rated the Build-Own-Operate-Transfer (BOOT) system as most able to achieve the quality criterion whereas private clients rated design-build for projects up to N100 million (Naira). The study then concluded that, in the Nigerian construction industry participants do not agree on the performance of the procurement options on selection criteria.\",\"PeriodicalId\":30107,\"journal\":{\"name\":\"Civil Engineering Dimension\",\"volume\":\"11 1\",\"pages\":\"106-112\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-06-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"23\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering Dimension\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.9744/CED.11.2.PP.\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Dimension","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/CED.11.2.PP.","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 23

摘要

该研究根据尼日利亚广泛使用的采购方案制定了关于选择标准的绩效指数。利用传统的均值和标准化比率构成效用系数。结果表明,采购方案的表现取决于受访者对项目的分类和成本分类。公共客户认为一次性合同更能够实现高达1亿奈拉(奈拉)的项目速度,而私人客户则认为这是设计-建造。在质量方面,公共客户认为建造-拥有-经营-转让(BOOT)系统最能达到质量标准,而私人客户认为项目的设计-建造最高可达1亿奈拉(奈拉)。该研究的结论是,尼日利亚建筑业的参与者不同意采购选择标准的执行情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Benchmarking the Performance of Construction Procurement Methods against Selection Criteria in Nigeria
The study developed performance indices by the widely used procurement options in Nigeria on selection criteria. The traditional mean and standardized ratio were used to form the utility coefficients. Results revealed that performance by the procurement options depended on the respondents’ categorization and cost categorization of projects. Public clients ranked the lump sum contracts more able to achieve speed for projects up to N100 million (Naira) while the private clients believe it is the design-build. As regards quality, public clients rated the Build-Own-Operate-Transfer (BOOT) system as most able to achieve the quality criterion whereas private clients rated design-build for projects up to N100 million (Naira). The study then concluded that, in the Nigerian construction industry participants do not agree on the performance of the procurement options on selection criteria.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
15
审稿时长
24 weeks
期刊最新文献
Laboratory Study on Vallejo and Scovazzo’s Methods in Estimating the Rheology Parameters of Bentonite and Kaolinite Muds Influence of Prefabrication on Job Satisfaction in The Construction Industry Stress Analysis of Pin Connections in Steel Box Girder with the Unibridge System using Finite Element Model Monitoring and Analysis of Coastline Changes in the Coastal Area of Bali Island, Indonesia Free-Vibration and Buckling Analyses of Beams using Kriging-Based Timoshenko Beam Elements with the Discrete Shear Gap Technique
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1