中国某斜拉拱桥的施工验证

IF 1.2 4区 工程技术 Q3 CONSTRUCTION & BUILDING TECHNOLOGY Proceedings of the Institution of Civil Engineers-Structures and Buildings Pub Date : 2022-11-17 DOI:10.1680/jstbu.22.00029
Zhang Kexin, Liu Dachao, He Liu, Xue Xingwei, Fei Teng
{"title":"中国某斜拉拱桥的施工验证","authors":"Zhang Kexin, Liu Dachao, He Liu, Xue Xingwei, Fei Teng","doi":"10.1680/jstbu.22.00029","DOIUrl":null,"url":null,"abstract":"The mechanical properties of cooperative system bridges are complex. This paper describes the construction monitoring and load tests of a cable-stayed and arch cooperative bridge. The cable force, girder stress, and arch alignment were monitored during construction to ensure the safety of the bridge structure and attain the intended internal force state in the completed bridge. Meanwhile, static and dynamic load tests were performed after completing the bridge to test its bearing capacity. The construction monitoring observations indicated that the cable force and suspender force change of the bridge during construction were generally consistent with theoretical calculations. The measured cable force of cable C01 was between 2155 and 3085 kN, and the measured value of suspender LS15 was between 980 and 1250 kN; these values conform to the laws of mechanics. The load test results demonstrated that the maximum deflection of the mid-span section of the girder was 5.8 mm, which was less than the theoretical value (6.3 mm). The measured impact coefficients of the bridge under four sets of working conditions based on dynamic load testing were similar to the computed results. These results confirm that the girder has sufficient structural stiffness.","PeriodicalId":54570,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Structures and Buildings","volume":null,"pages":null},"PeriodicalIF":1.2000,"publicationDate":"2022-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Construction Verification of a Cable-Stayed Arch Cooperative Bridge in China\",\"authors\":\"Zhang Kexin, Liu Dachao, He Liu, Xue Xingwei, Fei Teng\",\"doi\":\"10.1680/jstbu.22.00029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The mechanical properties of cooperative system bridges are complex. This paper describes the construction monitoring and load tests of a cable-stayed and arch cooperative bridge. The cable force, girder stress, and arch alignment were monitored during construction to ensure the safety of the bridge structure and attain the intended internal force state in the completed bridge. Meanwhile, static and dynamic load tests were performed after completing the bridge to test its bearing capacity. The construction monitoring observations indicated that the cable force and suspender force change of the bridge during construction were generally consistent with theoretical calculations. The measured cable force of cable C01 was between 2155 and 3085 kN, and the measured value of suspender LS15 was between 980 and 1250 kN; these values conform to the laws of mechanics. The load test results demonstrated that the maximum deflection of the mid-span section of the girder was 5.8 mm, which was less than the theoretical value (6.3 mm). The measured impact coefficients of the bridge under four sets of working conditions based on dynamic load testing were similar to the computed results. These results confirm that the girder has sufficient structural stiffness.\",\"PeriodicalId\":54570,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Structures and Buildings\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2022-11-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Structures and Buildings\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jstbu.22.00029\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Structures and Buildings","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jstbu.22.00029","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

协同体系桥梁的力学性能复杂。介绍了某斜拉拱桥的施工监测及荷载试验情况。在施工过程中对索力、主梁应力、拱向进行监测,以保证桥梁结构的安全,达到竣工后的预期内力状态。同时,在桥梁建成后进行静、动荷载试验,测试其承载能力。施工监测结果表明,桥梁在施工过程中索力和吊索力的变化与理论计算基本一致。电缆C01的测索力在2155 ~ 3085 kN之间,吊杆LS15的测索力在980 ~ 1250 kN之间;这些数值符合力学定律。荷载试验结果表明,梁跨中截面最大挠度为5.8 mm,小于理论值6.3 mm。基于动载试验的四组工况下的实测冲击系数与计算结果基本一致。这些结果证实了梁具有足够的结构刚度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Construction Verification of a Cable-Stayed Arch Cooperative Bridge in China
The mechanical properties of cooperative system bridges are complex. This paper describes the construction monitoring and load tests of a cable-stayed and arch cooperative bridge. The cable force, girder stress, and arch alignment were monitored during construction to ensure the safety of the bridge structure and attain the intended internal force state in the completed bridge. Meanwhile, static and dynamic load tests were performed after completing the bridge to test its bearing capacity. The construction monitoring observations indicated that the cable force and suspender force change of the bridge during construction were generally consistent with theoretical calculations. The measured cable force of cable C01 was between 2155 and 3085 kN, and the measured value of suspender LS15 was between 980 and 1250 kN; these values conform to the laws of mechanics. The load test results demonstrated that the maximum deflection of the mid-span section of the girder was 5.8 mm, which was less than the theoretical value (6.3 mm). The measured impact coefficients of the bridge under four sets of working conditions based on dynamic load testing were similar to the computed results. These results confirm that the girder has sufficient structural stiffness.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.40
自引率
6.20%
发文量
61
审稿时长
12 months
期刊介绍: Structures and Buildings publishes peer-reviewed papers on the design and construction of civil engineering structures and the applied research associated with such activities. Topics include the design, strength, durability and behaviour of structural components and systems. Topics covered: energy conservation, people movement within and around buildings, strength and durability of steel and concrete structural components, and the behaviour of building and bridge components and systems
期刊最新文献
The engineering legacy of the FIFA World Cup Qatar 2022: Al Janoub stadium A simplified approach for local buckling in metal-faced profiled sandwich panels Mechanical behavior of sheathing-to-framing connections in laminated bamboo lumber shear walls Lateral torsional capacity of steel beams in different loading conditions by neural network Strengthening of slender webs of steel plate girders using FRP composites
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1