{"title":"结合油井干预方案优化生产、降低风险的案例","authors":"Eyvind Morten Meling, H. Mourani, B. Schwanitz","doi":"10.2118/205889-ms","DOIUrl":null,"url":null,"abstract":"\n While optimizing hydrocarbon production, combining well intervention solutions can enable significant benefits due to reductions in risk exposure: fewer rig-ups and downs, less in-the-hole operating time and the carbon production and costs associated with rig time, especially when working from sub-sea intervention vessels. Operators in general, prefer to achieve multiple intervention objectives in a single descent in the well, if the operations complexity does not increase the risk exposure to an unacceptable level. Often, the risk of a mis-run, causing a second run, meets the cost vs value criteria for acceptable risk, when the large operating time savings of a successful combined run is considered.\n In collaboration with a mechanical e-line provider, North Sea operators developed three reliable combination solutions which increased their operational efficiency. Combining these most run services under more standard, common scope of work procedures, saved the operator time in planning, execution, risk exposure and money, while enabling them to produce hydrocarbons in the saved time. This paper will present the technology involved with these combined services, use a typical example of each and the cost savings achieved.","PeriodicalId":10965,"journal":{"name":"Day 3 Thu, September 23, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Case for Combining Well Intervention Solutions to Optimize Production and Reduce Risk Exposure\",\"authors\":\"Eyvind Morten Meling, H. Mourani, B. Schwanitz\",\"doi\":\"10.2118/205889-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n While optimizing hydrocarbon production, combining well intervention solutions can enable significant benefits due to reductions in risk exposure: fewer rig-ups and downs, less in-the-hole operating time and the carbon production and costs associated with rig time, especially when working from sub-sea intervention vessels. Operators in general, prefer to achieve multiple intervention objectives in a single descent in the well, if the operations complexity does not increase the risk exposure to an unacceptable level. Often, the risk of a mis-run, causing a second run, meets the cost vs value criteria for acceptable risk, when the large operating time savings of a successful combined run is considered.\\n In collaboration with a mechanical e-line provider, North Sea operators developed three reliable combination solutions which increased their operational efficiency. Combining these most run services under more standard, common scope of work procedures, saved the operator time in planning, execution, risk exposure and money, while enabling them to produce hydrocarbons in the saved time. This paper will present the technology involved with these combined services, use a typical example of each and the cost savings achieved.\",\"PeriodicalId\":10965,\"journal\":{\"name\":\"Day 3 Thu, September 23, 2021\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, September 23, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205889-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, September 23, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205889-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在优化油气产量的同时,结合修井解决方案可以降低风险,从而带来显著的效益:更少的起起落落、更少的井下作业时间、更少的碳产量和与钻机时间相关的成本,尤其是在海底修井船上作业时。通常情况下,如果作业的复杂性不会使风险增加到不可接受的程度,作业者更倾向于在一次下井中实现多个修井目标。通常,当考虑到一次成功的联合作业所节省的大量作业时间时,误入导致第二次作业的风险符合可接受风险的成本与价值标准。北海作业者与机械电缆供应商合作,开发了三种可靠的组合解决方案,提高了作业效率。将这些服务结合在更标准、更通用的工作程序范围内,节省了作业者在规划、执行、风险暴露和资金方面的时间,同时使他们能够在节省的时间内生产碳氢化合物。本文将介绍与这些组合服务相关的技术,并使用每个服务的典型示例以及所实现的成本节约。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Case for Combining Well Intervention Solutions to Optimize Production and Reduce Risk Exposure
While optimizing hydrocarbon production, combining well intervention solutions can enable significant benefits due to reductions in risk exposure: fewer rig-ups and downs, less in-the-hole operating time and the carbon production and costs associated with rig time, especially when working from sub-sea intervention vessels. Operators in general, prefer to achieve multiple intervention objectives in a single descent in the well, if the operations complexity does not increase the risk exposure to an unacceptable level. Often, the risk of a mis-run, causing a second run, meets the cost vs value criteria for acceptable risk, when the large operating time savings of a successful combined run is considered. In collaboration with a mechanical e-line provider, North Sea operators developed three reliable combination solutions which increased their operational efficiency. Combining these most run services under more standard, common scope of work procedures, saved the operator time in planning, execution, risk exposure and money, while enabling them to produce hydrocarbons in the saved time. This paper will present the technology involved with these combined services, use a typical example of each and the cost savings achieved.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Incorporation of Neutrally Buoyant Proppants in Horizontal Unconventional Wells to Increase Propped Fracture Area Results for Substantially Improved Well Productivity and Economics Simplified Solution for Managed Pressure Drilling - System that Drillers Can Operate The Case for Combining Well Intervention Solutions to Optimize Production and Reduce Risk Exposure Application of Digital Well Construction Planning Tool During Well Conceptualization Phase Downhole Heating Technology – New Solution for Paraffinic Wells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1