{"title":"多基地企业理念在航空工业中的延伸","authors":"Thierry Pardessus (Head)","doi":"10.1016/S1290-0958(01)90054-1","DOIUrl":null,"url":null,"abstract":"<div><p>This article introduces the industrial deployment of multi-site extended enterprise concept within EADS AIRBUS SA for the development of the new AIRBUS. Between 1997 and 2000, EADS AURBUS SA, for the development of the A340 500 and 600 programmes co-located up to 600 persons on a common multidisciplinary platform (engineering, manufacturing, support, airlines involvement). The objectives were to reduce, in comparison with A340, the lifecycle of the development of 25%, to reduce the development costs of 30% and to reach, at the entry in service of the first aircraft, a maturity never seen (dispatch reliability of 99%). For that purpose, digital mock-ups were used and permitted to support all the actors involved all along the development and also during the assembly of the first aircraft. This approach continues actually with the involvement of all the parties of the new integrated AIRBUS company for the development of the A380 (very large aircraft) and the A400M (military transport aircraft).</p></div>","PeriodicalId":100069,"journal":{"name":"Air & Space Europe","volume":"3 3","pages":"Pages 46-48"},"PeriodicalIF":0.0000,"publicationDate":"2001-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1290-0958(01)90054-1","citationCount":"22","resultStr":"{\"title\":\"The multi-site extended enterprise concept in the aeronautical industry\",\"authors\":\"Thierry Pardessus (Head)\",\"doi\":\"10.1016/S1290-0958(01)90054-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This article introduces the industrial deployment of multi-site extended enterprise concept within EADS AIRBUS SA for the development of the new AIRBUS. Between 1997 and 2000, EADS AURBUS SA, for the development of the A340 500 and 600 programmes co-located up to 600 persons on a common multidisciplinary platform (engineering, manufacturing, support, airlines involvement). The objectives were to reduce, in comparison with A340, the lifecycle of the development of 25%, to reduce the development costs of 30% and to reach, at the entry in service of the first aircraft, a maturity never seen (dispatch reliability of 99%). For that purpose, digital mock-ups were used and permitted to support all the actors involved all along the development and also during the assembly of the first aircraft. This approach continues actually with the involvement of all the parties of the new integrated AIRBUS company for the development of the A380 (very large aircraft) and the A400M (military transport aircraft).</p></div>\",\"PeriodicalId\":100069,\"journal\":{\"name\":\"Air & Space Europe\",\"volume\":\"3 3\",\"pages\":\"Pages 46-48\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1290-0958(01)90054-1\",\"citationCount\":\"22\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Air & Space Europe\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1290095801900541\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Air & Space Europe","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1290095801900541","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22

摘要

本文介绍了多站点扩展企业概念在EADS AIRBUS SA内的工业部署,以开发新型空客。1997年至2000年间,EADS AURBUS SA为开发A340 500和600项目,在一个共同的多学科平台(工程、制造、支持、航空公司参与)上共同安排了多达600人。与A340相比,其目标是将开发周期缩短25%,将开发成本降低30%,并在首架飞机投入使用时达到前所未有的成熟度(调度可靠性达到99%)。为此,使用了数字模型,并允许在整个开发过程中以及在第一架飞机的组装过程中支持所有参与者。这种方法实际上是在新整合的空客公司的所有各方参与下继续进行的,以开发A380(超大型飞机)和A400M(军用运输机)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The multi-site extended enterprise concept in the aeronautical industry

This article introduces the industrial deployment of multi-site extended enterprise concept within EADS AIRBUS SA for the development of the new AIRBUS. Between 1997 and 2000, EADS AURBUS SA, for the development of the A340 500 and 600 programmes co-located up to 600 persons on a common multidisciplinary platform (engineering, manufacturing, support, airlines involvement). The objectives were to reduce, in comparison with A340, the lifecycle of the development of 25%, to reduce the development costs of 30% and to reach, at the entry in service of the first aircraft, a maturity never seen (dispatch reliability of 99%). For that purpose, digital mock-ups were used and permitted to support all the actors involved all along the development and also during the assembly of the first aircraft. This approach continues actually with the involvement of all the parties of the new integrated AIRBUS company for the development of the A380 (very large aircraft) and the A400M (military transport aircraft).

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Foreword The End…or…the End of a Benginning? Firms & Institutions CEAS Public Policy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1