格兰比港废物管理站向安大略湖的地下水输送镭-226和铀

A.G. Bobba, S.R. Joshi
{"title":"格兰比港废物管理站向安大略湖的地下水输送镭-226和铀","authors":"A.G. Bobba,&nbsp;S.R. Joshi","doi":"10.1016/0191-815X(88)90027-7","DOIUrl":null,"url":null,"abstract":"<div><p>A finite element model is developed for delineating radioactive contaminant plumes via groundwater. The model is then used to predict the migration of <sup>226</sup>Ra and U from the near-shore Port Granby waste management site to Lake Ontario. The model runs are made simulating either one or two stratigraphic layers and simulating varying degrees of anisotropy in each layer. The model-predicted <sup>226</sup>Ra and U concentrations are found to be in good agreement with those actually observed. Recovery phase analysis predicts that the continuous migration, via groundwater, of both contaminants toward Lake Ontario is likely to persist even after the waste is removed from the site.</p></div>","PeriodicalId":100966,"journal":{"name":"Nuclear and Chemical Waste Management","volume":"8 3","pages":"Pages 199-209"},"PeriodicalIF":0.0000,"publicationDate":"1988-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0191-815X(88)90027-7","citationCount":"13","resultStr":"{\"title\":\"Groundwater transport of radium-226 and uranium from port granby waste management site to Lake Ontario\",\"authors\":\"A.G. Bobba,&nbsp;S.R. Joshi\",\"doi\":\"10.1016/0191-815X(88)90027-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A finite element model is developed for delineating radioactive contaminant plumes via groundwater. The model is then used to predict the migration of <sup>226</sup>Ra and U from the near-shore Port Granby waste management site to Lake Ontario. The model runs are made simulating either one or two stratigraphic layers and simulating varying degrees of anisotropy in each layer. The model-predicted <sup>226</sup>Ra and U concentrations are found to be in good agreement with those actually observed. Recovery phase analysis predicts that the continuous migration, via groundwater, of both contaminants toward Lake Ontario is likely to persist even after the waste is removed from the site.</p></div>\",\"PeriodicalId\":100966,\"journal\":{\"name\":\"Nuclear and Chemical Waste Management\",\"volume\":\"8 3\",\"pages\":\"Pages 199-209\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1988-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0191-815X(88)90027-7\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear and Chemical Waste Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0191815X88900277\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear and Chemical Waste Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0191815X88900277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

建立了地下水中放射性污染物羽流圈定的有限元模型。然后,该模型用于预测226Ra和U从近岸格兰比港废物管理站向安大略湖的迁移。模型运行模拟了一个或两个地层,并模拟了每一层不同程度的各向异性。模型预测的226Ra和U浓度与实际观测值吻合较好。恢复阶段分析预测,这两种污染物通过地下水向安大略湖的持续迁移,即使在废物从现场移走之后,也可能持续存在。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Groundwater transport of radium-226 and uranium from port granby waste management site to Lake Ontario

A finite element model is developed for delineating radioactive contaminant plumes via groundwater. The model is then used to predict the migration of 226Ra and U from the near-shore Port Granby waste management site to Lake Ontario. The model runs are made simulating either one or two stratigraphic layers and simulating varying degrees of anisotropy in each layer. The model-predicted 226Ra and U concentrations are found to be in good agreement with those actually observed. Recovery phase analysis predicts that the continuous migration, via groundwater, of both contaminants toward Lake Ontario is likely to persist even after the waste is removed from the site.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Books received Editorial Editorial Board Letter to the editor A method for predicting cracking in waste glass canisters
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1