{"title":"结合BIM和精益方法,在项目早期阶段进行调度,验证和沟通拆除过程","authors":"Dominik Steuer, Svenja Lauble, Shervin Haghsheno","doi":"10.35490/ec3.2023.162","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":7326,"journal":{"name":"Advances in Informatics and Computing in Civil and Construction Engineering","volume":"51 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Combining BIM and lean methods for scheduling for verifying and communicating demolition processes in an early project stage\",\"authors\":\"Dominik Steuer, Svenja Lauble, Shervin Haghsheno\",\"doi\":\"10.35490/ec3.2023.162\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":7326,\"journal\":{\"name\":\"Advances in Informatics and Computing in Civil and Construction Engineering\",\"volume\":\"51 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Informatics and Computing in Civil and Construction Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35490/ec3.2023.162\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Informatics and Computing in Civil and Construction Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35490/ec3.2023.162","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}