Meimei Zheng, Hao Zhou, Peng Jiang, E. Pan, S. Zhao, Kan Wu
{"title":"需求和生命周期不确定的多项目供应商选择问题","authors":"Meimei Zheng, Hao Zhou, Peng Jiang, E. Pan, S. Zhao, Kan Wu","doi":"10.1016/J.COR.2021.105312","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":10582,"journal":{"name":"Comput. Oper. Res.","volume":"62 1","pages":"105312"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Supplier selection problem for multiple projects with uncertain demand and project life cycles\",\"authors\":\"Meimei Zheng, Hao Zhou, Peng Jiang, E. Pan, S. Zhao, Kan Wu\",\"doi\":\"10.1016/J.COR.2021.105312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":10582,\"journal\":{\"name\":\"Comput. Oper. Res.\",\"volume\":\"62 1\",\"pages\":\"105312\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Comput. Oper. Res.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/J.COR.2021.105312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Comput. Oper. Res.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/J.COR.2021.105312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}