伊朗建筑业的争端解决机制

IF 0.8 Q4 CONSTRUCTION & BUILDING TECHNOLOGY Journal of Construction in Developing Countries Pub Date : 2021-07-30 DOI:10.21315/jcdc2021.26.1.10
A. Saeb, Miandoab Iran Fanavaran Jeghato Co., M. Danuri, O. Mohamed, N. Zakaria
{"title":"伊朗建筑业的争端解决机制","authors":"A. Saeb, Miandoab Iran Fanavaran Jeghato Co., M. Danuri, O. Mohamed, N. Zakaria","doi":"10.21315/jcdc2021.26.1.10","DOIUrl":null,"url":null,"abstract":"If disputes are not resolved promptly, they tend to become prolonged and escalated, creating a more complicated and less manageable scenario. Therefore, in this study, we formulated a mechanism for dispute resolution in the Iranian construction industry based on alternative dispute resolution methods. The formulated mechanism could aid disputing parties in the construction industry to settle their disputes more effectively and enhance dispute resolution methods in construction standard forms. To achieve this goal, we collected qualitative data using semi-structured interviews with 30 experts who were selected via purposive sampling method. We used MAXQDA software to manage and organise complete interview transcripts and facilitate the qualitative data analysis process. The proposed mechanism and guidance were finally validated using the survey questionnaire. Negotiation has equal potential for dispute resolution with different sources, and it is recommended as the first step in dispute resolution with any source. According to the results, we recommend a three-step resolution mechanism as follows: negotiation, a method based on sources of disputes and a hybrid method of adjudication and arbitration (Adj-Arb), as the appropriate mechanism for dispute resolution in the Iranian construction industry. Replacing arbitration with Adj-Arb in construction standard forms will have satisfactory results in resolving construction disputes and reply to growing criticism that arbitration is becoming more like litigation.","PeriodicalId":51876,"journal":{"name":"Journal of Construction in Developing Countries","volume":"75 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2021-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A Mechanism for Dispute Resolution in the Iranian Construction Industry\",\"authors\":\"A. Saeb, Miandoab Iran Fanavaran Jeghato Co., M. Danuri, O. Mohamed, N. Zakaria\",\"doi\":\"10.21315/jcdc2021.26.1.10\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"If disputes are not resolved promptly, they tend to become prolonged and escalated, creating a more complicated and less manageable scenario. Therefore, in this study, we formulated a mechanism for dispute resolution in the Iranian construction industry based on alternative dispute resolution methods. The formulated mechanism could aid disputing parties in the construction industry to settle their disputes more effectively and enhance dispute resolution methods in construction standard forms. To achieve this goal, we collected qualitative data using semi-structured interviews with 30 experts who were selected via purposive sampling method. We used MAXQDA software to manage and organise complete interview transcripts and facilitate the qualitative data analysis process. The proposed mechanism and guidance were finally validated using the survey questionnaire. Negotiation has equal potential for dispute resolution with different sources, and it is recommended as the first step in dispute resolution with any source. According to the results, we recommend a three-step resolution mechanism as follows: negotiation, a method based on sources of disputes and a hybrid method of adjudication and arbitration (Adj-Arb), as the appropriate mechanism for dispute resolution in the Iranian construction industry. Replacing arbitration with Adj-Arb in construction standard forms will have satisfactory results in resolving construction disputes and reply to growing criticism that arbitration is becoming more like litigation.\",\"PeriodicalId\":51876,\"journal\":{\"name\":\"Journal of Construction in Developing Countries\",\"volume\":\"75 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2021-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Construction in Developing Countries\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21315/jcdc2021.26.1.10\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction in Developing Countries","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21315/jcdc2021.26.1.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

摘要

如果争端得不到及时解决,它们往往会延长和升级,造成更复杂和更难以管理的局面。因此,在本研究中,我们在替代性争议解决方法的基础上,制定了伊朗建筑行业的争议解决机制。制定的机制可以帮助建筑行业纠纷各方更有效地解决纠纷,并在建筑标准形式中增加纠纷解决方式。为了实现这一目标,我们采用半结构化访谈的方式收集了30位专家的定性数据,这些专家是通过有目的的抽样方法选择的。我们使用MAXQDA软件来管理和整理完整的访谈记录,并促进定性数据分析过程。最后通过问卷调查对提出的机制和指导进行了验证。谈判对于解决不同来源的争议具有同等的潜力,建议将其作为解决任何来源的争议的第一步。根据研究结果,我们建议将谈判、基于争议来源的方法和裁决与仲裁的混合方法(Adj-Arb)作为解决伊朗建筑行业争议的适当机制。在建筑标准形式中以仲裁取代仲裁将在解决建筑纠纷方面取得令人满意的结果,并回应越来越多的批评,即仲裁正在变得更像诉讼。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Mechanism for Dispute Resolution in the Iranian Construction Industry
If disputes are not resolved promptly, they tend to become prolonged and escalated, creating a more complicated and less manageable scenario. Therefore, in this study, we formulated a mechanism for dispute resolution in the Iranian construction industry based on alternative dispute resolution methods. The formulated mechanism could aid disputing parties in the construction industry to settle their disputes more effectively and enhance dispute resolution methods in construction standard forms. To achieve this goal, we collected qualitative data using semi-structured interviews with 30 experts who were selected via purposive sampling method. We used MAXQDA software to manage and organise complete interview transcripts and facilitate the qualitative data analysis process. The proposed mechanism and guidance were finally validated using the survey questionnaire. Negotiation has equal potential for dispute resolution with different sources, and it is recommended as the first step in dispute resolution with any source. According to the results, we recommend a three-step resolution mechanism as follows: negotiation, a method based on sources of disputes and a hybrid method of adjudication and arbitration (Adj-Arb), as the appropriate mechanism for dispute resolution in the Iranian construction industry. Replacing arbitration with Adj-Arb in construction standard forms will have satisfactory results in resolving construction disputes and reply to growing criticism that arbitration is becoming more like litigation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Construction in Developing Countries
Journal of Construction in Developing Countries CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
1.50
自引率
0.00%
发文量
25
审稿时长
20 weeks
期刊介绍: The Journal of Construction in Developing Countries seeks to provide a central vehicle for the exchange and dissemination of knowledge on issues relevant to the built environment of developing countries. The journal provides a wide range of original research an application papers on current developments and advances in the built environment as well as the economic, social, cultural and technological contexts of developing countries. It also publishes detailed case studies, as well as short communications and discussions. Topics covered include, but are not restricted to planning, urban economics, rural and regional development, housing, management and resource issues, sustiainability, knowledge and technology transfer, construction procurement, facilities management, information an communication technologies, strategies and policy issues, design issues, conservation and environmental issues.
期刊最新文献
The Impact of COVID-19 on the Construction Sector in Zimbabwe Barriers to Incident Reporting in the Pakistani Construction Industry: An Exploratory Factor Analysis Approach Assessing the Level of Resilience in Construction Safety Management Systems in the Construction Industry Exploring the Temporary Appropriation of Marginal Open Spaces in Urban Residential Neighbourhoods Information Technology as Catalyst for Value Re-Engineering Implementation in the Nigerian Construction Industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1