行业先进完井最佳实践综述

M. Al-Rabeh, K. R. Al-Noaimi, J. Brown
{"title":"行业先进完井最佳实践综述","authors":"M. Al-Rabeh, K. R. Al-Noaimi, J. Brown","doi":"10.2118/193112-MS","DOIUrl":null,"url":null,"abstract":"\n The objective of this paper is to communicate operational and engineering process enhancement and cost saving initiatives in advanced well completions. The initiatives were identified following a detailed review of industrywide advanced completion best practices standardized over the past decade. Several operational and engineering best practices involving inflow control valves (ICVs), inflow control devices (ICDs), zonal isolation (mechanical and swell packers), multistage fracturing (MSF) and sand control technologies were examined. In addition, downhole pressure relief requirements were also considered to introduce new ways of enhancing well integrity by preventing casing corrosion.\n A standard research and development methodology was utilized for this review. The methodology was based on collecting and documenting industrywide actual operational and engineering challenges in advanced well completion deployments for both oil and gas fields. These challenges resulted in either lost time at the rig site, necessitated workovers, or rigless operations. Examples of such challenges include extreme frictional forces during ICD deployments, repetitive solids removal practices prior to running ICVs, coiled tubing milling requirements for MSF, wash pipe deployments for downhole sand screen circulation, and calcium carbonate scale deposition in sand screens. The research also encompass a literature review for identifying further advanced completion challenges across the industry.\n The review resulted in identifying several areas of potential improvement. As a result, multiple engineering and operational process enhancement initiatives were recommended. This includes the utilization of centralizers to reduce frictional forces in ICD deployments. Also, the application of isolation valves to eliminate wash pipe requirements in screens or ICDs. Moreover, running downhole annular relief check valves to preserve tubular integrity by eliminating casing-to-casing annular (CCA) pressure communication and utilization of mono-bore ball seat technology to eliminate milling in MSF. Finally, the utilization of sacrificial completion accessories to improve ICV cleanup practices and save rig time in addition to several other relevant initiatives across the industry.\n In summary, the paper provides a deep dive into several technical advanced completion challenges across the industry. Also, several new initiatives are proposed with the objective of achieving significant cost savings. It is intended for these initiatives to be adopted as new advanced completion best practices. Not only to yield significant cost savings, but also to supplement the existing best practices body of literature in the areas of ICVs, ICDs, zonal isolation, MSF, well integrity and sand control technology.","PeriodicalId":11079,"journal":{"name":"Day 4 Thu, November 15, 2018","volume":"97 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Review of Industry-Wide Advanced Completion Best Practices\",\"authors\":\"M. Al-Rabeh, K. R. Al-Noaimi, J. Brown\",\"doi\":\"10.2118/193112-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The objective of this paper is to communicate operational and engineering process enhancement and cost saving initiatives in advanced well completions. The initiatives were identified following a detailed review of industrywide advanced completion best practices standardized over the past decade. Several operational and engineering best practices involving inflow control valves (ICVs), inflow control devices (ICDs), zonal isolation (mechanical and swell packers), multistage fracturing (MSF) and sand control technologies were examined. In addition, downhole pressure relief requirements were also considered to introduce new ways of enhancing well integrity by preventing casing corrosion.\\n A standard research and development methodology was utilized for this review. The methodology was based on collecting and documenting industrywide actual operational and engineering challenges in advanced well completion deployments for both oil and gas fields. These challenges resulted in either lost time at the rig site, necessitated workovers, or rigless operations. Examples of such challenges include extreme frictional forces during ICD deployments, repetitive solids removal practices prior to running ICVs, coiled tubing milling requirements for MSF, wash pipe deployments for downhole sand screen circulation, and calcium carbonate scale deposition in sand screens. The research also encompass a literature review for identifying further advanced completion challenges across the industry.\\n The review resulted in identifying several areas of potential improvement. As a result, multiple engineering and operational process enhancement initiatives were recommended. This includes the utilization of centralizers to reduce frictional forces in ICD deployments. Also, the application of isolation valves to eliminate wash pipe requirements in screens or ICDs. Moreover, running downhole annular relief check valves to preserve tubular integrity by eliminating casing-to-casing annular (CCA) pressure communication and utilization of mono-bore ball seat technology to eliminate milling in MSF. Finally, the utilization of sacrificial completion accessories to improve ICV cleanup practices and save rig time in addition to several other relevant initiatives across the industry.\\n In summary, the paper provides a deep dive into several technical advanced completion challenges across the industry. Also, several new initiatives are proposed with the objective of achieving significant cost savings. It is intended for these initiatives to be adopted as new advanced completion best practices. Not only to yield significant cost savings, but also to supplement the existing best practices body of literature in the areas of ICVs, ICDs, zonal isolation, MSF, well integrity and sand control technology.\",\"PeriodicalId\":11079,\"journal\":{\"name\":\"Day 4 Thu, November 15, 2018\",\"volume\":\"97 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 15, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193112-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 15, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193112-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的目的是在先进完井中沟通操作和工程流程的改进以及成本节约措施。这些举措是在对过去十年标准化的全行业先进完井最佳实践进行详细审查后确定的。研究了包括流入控制阀(icv)、流入控制装置(icd)、层间隔离(机械封隔器和膨胀封隔器)、多级压裂(MSF)和防砂技术在内的几种操作和工程最佳实践。此外,还考虑了井下泄压要求,引入了通过防止套管腐蚀来提高井完整性的新方法。本综述采用了标准的研究和开发方法。该方法是基于收集和记录整个行业在油气田先进完井部署中的实际操作和工程挑战。这些挑战要么导致钻井现场的时间浪费,要么导致需要修井,要么导致无钻机作业。这些挑战包括ICD部署过程中的极端摩擦力、icv运行前的重复固相清除操作、MSF的连续油管磨铣要求、井下砂筛循环的洗管部署以及砂筛中的碳酸钙结垢沉积。该研究还包括文献综述,以确定整个行业中进一步先进的完井挑战。审查结果确定了几个可能改进的领域。因此,推荐了多个工程和操作过程增强计划。这包括利用扶正器来减少ICD部署中的摩擦力。此外,隔离阀的应用消除了筛管或icd对冲洗管的要求。此外,通过消除套管到套管环空(CCA)压力通信,下入井下环空溢流止回阀以保持管柱完整性,并利用单孔球座技术消除MSF中的磨铣。最后,除了整个行业的其他相关举措外,还利用牺牲完井附件来改进ICV清理操作,节省钻机时间。综上所述,本文深入探讨了整个行业的几个先进完井技术挑战。此外,还提出了一些新的倡议,目的是实现显著的成本节约。它旨在将这些主动性作为新的高级完井最佳实践加以采用。这不仅可以显著节省成本,还可以补充icv、icd、层间隔离、MSF、井完整性和防砂技术领域现有的最佳实践文献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Review of Industry-Wide Advanced Completion Best Practices
The objective of this paper is to communicate operational and engineering process enhancement and cost saving initiatives in advanced well completions. The initiatives were identified following a detailed review of industrywide advanced completion best practices standardized over the past decade. Several operational and engineering best practices involving inflow control valves (ICVs), inflow control devices (ICDs), zonal isolation (mechanical and swell packers), multistage fracturing (MSF) and sand control technologies were examined. In addition, downhole pressure relief requirements were also considered to introduce new ways of enhancing well integrity by preventing casing corrosion. A standard research and development methodology was utilized for this review. The methodology was based on collecting and documenting industrywide actual operational and engineering challenges in advanced well completion deployments for both oil and gas fields. These challenges resulted in either lost time at the rig site, necessitated workovers, or rigless operations. Examples of such challenges include extreme frictional forces during ICD deployments, repetitive solids removal practices prior to running ICVs, coiled tubing milling requirements for MSF, wash pipe deployments for downhole sand screen circulation, and calcium carbonate scale deposition in sand screens. The research also encompass a literature review for identifying further advanced completion challenges across the industry. The review resulted in identifying several areas of potential improvement. As a result, multiple engineering and operational process enhancement initiatives were recommended. This includes the utilization of centralizers to reduce frictional forces in ICD deployments. Also, the application of isolation valves to eliminate wash pipe requirements in screens or ICDs. Moreover, running downhole annular relief check valves to preserve tubular integrity by eliminating casing-to-casing annular (CCA) pressure communication and utilization of mono-bore ball seat technology to eliminate milling in MSF. Finally, the utilization of sacrificial completion accessories to improve ICV cleanup practices and save rig time in addition to several other relevant initiatives across the industry. In summary, the paper provides a deep dive into several technical advanced completion challenges across the industry. Also, several new initiatives are proposed with the objective of achieving significant cost savings. It is intended for these initiatives to be adopted as new advanced completion best practices. Not only to yield significant cost savings, but also to supplement the existing best practices body of literature in the areas of ICVs, ICDs, zonal isolation, MSF, well integrity and sand control technology.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Drilling Optimization in Action - Delivering 125 Field Records in 6 Quarters Tight Reservoir: Characterization, Modeling, and Development Feasibility Production Enhancement in Tight Carbonate Reservoir with Propellant Stimulation Technique: Case Study in the State of Kuwait Field Trial Results for New Sand Control Technology for Water Injectors Impact of Natural Fractures in Reservoir Modelling and Characterization. Case Study in UAE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1