{"title":"Tarasovskoye油气田凝析油设施对象bp14开发系统改造成果","authors":"R. Gaĭnetdinov, F. N. Nigmatullin, R. S. Yakupov, V. G. Shaftelskii","doi":"10.17122/ntj-oil-2023-2-71-80","DOIUrl":null,"url":null,"abstract":"In article, the technological effect of oil production increase by the inverted nine-point development system into a single-row system transformation is quantified. The anticipatory watering of the production wells located on the same row with the injection wells in the direction of regional stress in the inverted nine-point development system implemented at the oil facility BP14 object is shown. The effect of anticipatory watering is explained by the formation and growth of auto-hydraulic fractures on injection wells. With the effect and in order to increase the watering implementation coefficient the program of transferring highly watered and idle production wells to injection was started at the aim to form the single-row development system directed along the lineregional stress. Analysis of the ten-year project implementation actual results showed that the system transformation on BP14 object will increase the cumulative oil production on nearby 20 % on the latest stage of development.","PeriodicalId":42555,"journal":{"name":"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation","volume":"26 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2023-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"TARASOVSKOYE OIL AND GAS CONDENSATE FIELD OIL FACILITY OBJECT BP14 DEVELOPMENT SYSTEM TRANSFORMATION RESULTS\",\"authors\":\"R. Gaĭnetdinov, F. N. Nigmatullin, R. S. Yakupov, V. G. Shaftelskii\",\"doi\":\"10.17122/ntj-oil-2023-2-71-80\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In article, the technological effect of oil production increase by the inverted nine-point development system into a single-row system transformation is quantified. The anticipatory watering of the production wells located on the same row with the injection wells in the direction of regional stress in the inverted nine-point development system implemented at the oil facility BP14 object is shown. The effect of anticipatory watering is explained by the formation and growth of auto-hydraulic fractures on injection wells. With the effect and in order to increase the watering implementation coefficient the program of transferring highly watered and idle production wells to injection was started at the aim to form the single-row development system directed along the lineregional stress. Analysis of the ten-year project implementation actual results showed that the system transformation on BP14 object will increase the cumulative oil production on nearby 20 % on the latest stage of development.\",\"PeriodicalId\":42555,\"journal\":{\"name\":\"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2023-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17122/ntj-oil-2023-2-71-80\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MECHANICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17122/ntj-oil-2023-2-71-80","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MECHANICAL","Score":null,"Total":0}
引用次数: 0

摘要

本文量化了由倒九点开发系统改造为单排系统增产的技术效果。如图所示为在BP14油田实施的倒九点开发系统中,生产井与注水井沿区域应力方向同排的预期注水情况。自水力裂缝对注水井的形成和发育可以解释预注水的作用。在此基础上,为提高注水实施系数,启动了高含水闲置生产井转注方案,旨在形成沿区域应力线定向的单排开发体系。对BP14项目实施10年的实际效果分析表明,BP14项目的系统改造将使最新开发阶段的累计产油量提高近20%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
TARASOVSKOYE OIL AND GAS CONDENSATE FIELD OIL FACILITY OBJECT BP14 DEVELOPMENT SYSTEM TRANSFORMATION RESULTS
In article, the technological effect of oil production increase by the inverted nine-point development system into a single-row system transformation is quantified. The anticipatory watering of the production wells located on the same row with the injection wells in the direction of regional stress in the inverted nine-point development system implemented at the oil facility BP14 object is shown. The effect of anticipatory watering is explained by the formation and growth of auto-hydraulic fractures on injection wells. With the effect and in order to increase the watering implementation coefficient the program of transferring highly watered and idle production wells to injection was started at the aim to form the single-row development system directed along the lineregional stress. Analysis of the ten-year project implementation actual results showed that the system transformation on BP14 object will increase the cumulative oil production on nearby 20 % on the latest stage of development.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.80
自引率
50.00%
发文量
41
期刊最新文献
INFLUENCE OF OPERATIONAL LOADS ON BALLASTING PARAMETERS OF UNDERWATER CROSSINGS OF TRUNK OIL AND GAS PIPELINES CARBON DIOXIDE UTILIZATION BY PRESSURIZED CONCRETE MIXER EFFICIENCY ANALYSIS OF POLYMERS IN THE COMPOSITION OF ENCAPSULATED MATERIAL FOR BIOREMEDIATION OF SOIL CONTAMINATED WITH FUEL OIL DETERMINATION OF PRODUCTIVITY COEFFICIENTS IN OBTAINING OIL-WATER INFLOWS FROM COMPLEX RESERVOIR ROCKS WITH TEXTURAL HETEROGENEITY PIPE PROTECTION FROM CORROSION UNDER THERMAL INSULATION
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1