R. Gaĭnetdinov, F. N. Nigmatullin, R. S. Yakupov, V. G. Shaftelskii
{"title":"Tarasovskoye油气田凝析油设施对象bp14开发系统改造成果","authors":"R. Gaĭnetdinov, F. N. Nigmatullin, R. S. Yakupov, V. G. Shaftelskii","doi":"10.17122/ntj-oil-2023-2-71-80","DOIUrl":null,"url":null,"abstract":"In article, the technological effect of oil production increase by the inverted nine-point development system into a single-row system transformation is quantified. The anticipatory watering of the production wells located on the same row with the injection wells in the direction of regional stress in the inverted nine-point development system implemented at the oil facility BP14 object is shown. The effect of anticipatory watering is explained by the formation and growth of auto-hydraulic fractures on injection wells. With the effect and in order to increase the watering implementation coefficient the program of transferring highly watered and idle production wells to injection was started at the aim to form the single-row development system directed along the lineregional stress. Analysis of the ten-year project implementation actual results showed that the system transformation on BP14 object will increase the cumulative oil production on nearby 20 % on the latest stage of development.","PeriodicalId":42555,"journal":{"name":"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation","volume":"26 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2023-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"TARASOVSKOYE OIL AND GAS CONDENSATE FIELD OIL FACILITY OBJECT BP14 DEVELOPMENT SYSTEM TRANSFORMATION RESULTS\",\"authors\":\"R. Gaĭnetdinov, F. N. Nigmatullin, R. S. Yakupov, V. G. Shaftelskii\",\"doi\":\"10.17122/ntj-oil-2023-2-71-80\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In article, the technological effect of oil production increase by the inverted nine-point development system into a single-row system transformation is quantified. The anticipatory watering of the production wells located on the same row with the injection wells in the direction of regional stress in the inverted nine-point development system implemented at the oil facility BP14 object is shown. The effect of anticipatory watering is explained by the formation and growth of auto-hydraulic fractures on injection wells. With the effect and in order to increase the watering implementation coefficient the program of transferring highly watered and idle production wells to injection was started at the aim to form the single-row development system directed along the lineregional stress. Analysis of the ten-year project implementation actual results showed that the system transformation on BP14 object will increase the cumulative oil production on nearby 20 % on the latest stage of development.\",\"PeriodicalId\":42555,\"journal\":{\"name\":\"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2023-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17122/ntj-oil-2023-2-71-80\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MECHANICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17122/ntj-oil-2023-2-71-80","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MECHANICAL","Score":null,"Total":0}
TARASOVSKOYE OIL AND GAS CONDENSATE FIELD OIL FACILITY OBJECT BP14 DEVELOPMENT SYSTEM TRANSFORMATION RESULTS
In article, the technological effect of oil production increase by the inverted nine-point development system into a single-row system transformation is quantified. The anticipatory watering of the production wells located on the same row with the injection wells in the direction of regional stress in the inverted nine-point development system implemented at the oil facility BP14 object is shown. The effect of anticipatory watering is explained by the formation and growth of auto-hydraulic fractures on injection wells. With the effect and in order to increase the watering implementation coefficient the program of transferring highly watered and idle production wells to injection was started at the aim to form the single-row development system directed along the lineregional stress. Analysis of the ten-year project implementation actual results showed that the system transformation on BP14 object will increase the cumulative oil production on nearby 20 % on the latest stage of development.