{"title":"比较弓法、SNI和承包商计算之间的成本估计值","authors":"Bambang Piluto","doi":"10.30736/JT.V13I2.477","DOIUrl":null,"url":null,"abstract":"In determining the price of a job, it need the basic tool of unit price analysis, namely the construction costs analysis. In calculating the construction costs analysis there are several methods have been generally used such as analysis of BOW, SNI and also companies that make their own calculation analysis. A comparative study is needed from the three methods so that it can be seen which is more effective and efficient as a basis for all parties in determining the strategy in terms of cost budget estimates. The study was conducted by preparing a project cost budget plan based on the volume of works on the bill of quantity (BoQ). The unit price analysis is calculated based on BOW analysis, SNI analysis and Contractor version analysis. From the estimation results, a price based on BOW analysis is IDR 2,682,315,013,-, based on SNI analysis is IDR 1,958,002,381, - and based on analysis of contractor calculations is IDR 1,781,956,483. Differences in price between BOW and SNI is IDR 724,312,632. Differences in price between BOW and contractors calculation is IDR 900,358,529. Differences price between SNI and contractors calculation  is IDR 176,045,897.","PeriodicalId":17707,"journal":{"name":"Jurnal Qua Teknika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE BOW, SNI DAN PERHITUNGAN KONTRAKTOR\",\"authors\":\"Bambang Piluto\",\"doi\":\"10.30736/JT.V13I2.477\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In determining the price of a job, it need the basic tool of unit price analysis, namely the construction costs analysis. In calculating the construction costs analysis there are several methods have been generally used such as analysis of BOW, SNI and also companies that make their own calculation analysis. A comparative study is needed from the three methods so that it can be seen which is more effective and efficient as a basis for all parties in determining the strategy in terms of cost budget estimates. The study was conducted by preparing a project cost budget plan based on the volume of works on the bill of quantity (BoQ). The unit price analysis is calculated based on BOW analysis, SNI analysis and Contractor version analysis. From the estimation results, a price based on BOW analysis is IDR 2,682,315,013,-, based on SNI analysis is IDR 1,958,002,381, - and based on analysis of contractor calculations is IDR 1,781,956,483. Differences in price between BOW and SNI is IDR 724,312,632. Differences in price between BOW and contractors calculation is IDR 900,358,529. Differences price between SNI and contractors calculation  is IDR 176,045,897.\",\"PeriodicalId\":17707,\"journal\":{\"name\":\"Jurnal Qua Teknika\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Qua Teknika\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30736/JT.V13I2.477\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Qua Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/JT.V13I2.477","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在确定工程造价时,需要运用单价分析的基本工具,即工程造价分析。在计算工程造价分析时,一般采用的方法有BOW法、SNI法等,也有公司自己进行计算分析。需要对这三种方法进行比较研究,以便可以看出哪一种方法更有效,更有效率,作为各方在费用概算方面确定战略的基础。该研究是根据工程量清单(BoQ)上的工程量编制项目成本预算计划进行的。单价分析是基于BOW分析、SNI分析和承包商版本分析来计算的。从估算结果来看,基于BOW分析的价格为2,682,315,013印尼盾,-基于SNI分析的价格为1,958,002,381印尼盾,-基于承包商计算分析的价格为1,781,956,483印尼盾。BOW和SNI之间的价格差异为724,312,632印尼盾。BOW和承包商之间的价格差异计算为900,358,529印尼盾。SNI和承包商之间的价格差异计算为176,045,897印尼盾。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE BOW, SNI DAN PERHITUNGAN KONTRAKTOR
In determining the price of a job, it need the basic tool of unit price analysis, namely the construction costs analysis. In calculating the construction costs analysis there are several methods have been generally used such as analysis of BOW, SNI and also companies that make their own calculation analysis. A comparative study is needed from the three methods so that it can be seen which is more effective and efficient as a basis for all parties in determining the strategy in terms of cost budget estimates. The study was conducted by preparing a project cost budget plan based on the volume of works on the bill of quantity (BoQ). The unit price analysis is calculated based on BOW analysis, SNI analysis and Contractor version analysis. From the estimation results, a price based on BOW analysis is IDR 2,682,315,013,-, based on SNI analysis is IDR 1,958,002,381, - and based on analysis of contractor calculations is IDR 1,781,956,483. Differences in price between BOW and SNI is IDR 724,312,632. Differences in price between BOW and contractors calculation is IDR 900,358,529. Differences price between SNI and contractors calculation  is IDR 176,045,897.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMILIHAN SUPPLIER MINYAK JELANTAH BAHAN BAKU BIOSOLAR DENGAN METODE ELECTRE SISTEM PENDUKUNG KEPUTUSAN PENERIMA PKH MENGGUNAKAN METODE SAW KAJIAN ENERGI SPESIFIK PADA BENDUNG BERTANGGA DENGAN VARIASI KEMIRINGAN HULU PADA SALURAN PERSEGI ALAT PROYEK MIKRO KONTROL PENGHAPUS PAPAN TULIS OTOMATIS MENGGUNAKAN REMOTE BERBASIS ARDUINO Prefix SISTEM PENGISIAN AIR PADA TANKI PEMBUATAN ROTI DENGAN METODE FUZZY LOGIC MENGGUNAKAN ARDUINO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1