{"title":"通过比较人工抬气升力和电动泵的升力,改善EC-6井的生产","authors":"Jonathan Jonathan, Sisworini Sisworini, Samsol Samsol, Hari Karyadi Oetomo","doi":"10.25105/PETRO.V8I1.4289","DOIUrl":null,"url":null,"abstract":"In the world of oil is very common in the production system. This production system produces oil from wells after drilling and well compressions. Over time, the production of a well may decrease due to several parameters of pressure drop and the presence of clay which makes the pipe diameter narrower. There are several methods used to increase the decrease in production including adding artificial lifts such as sucker rod pump, electric submersible pump and gas lift, reservoir stimulation and pipe cleaning if the pipe diameter is reduced due to clay. The well has been installed an artificial lift is a gas lift and this well need an optimization to increase its production. The EC-6 well optimization is planned by comparing the lift-up scenario of the gas lift by adjusting the rate of gas injection and deepening the orifice injection and also an installation of electrical submersible pump. Best percentage of optimization production from EC-6 Well, last scenario is chosen which is new installation artificial lift ESP from gas lift (existing) and gaining 18.52% form existing production","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"259 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"OPTIMASI PRODUKSI SUMUR EC-6 DENGAN MEMBANDINGKAN PENGANGKATAN BUATAN GAS LIFT DAN ELECTRIC SUBMERSIBLE PUMP\",\"authors\":\"Jonathan Jonathan, Sisworini Sisworini, Samsol Samsol, Hari Karyadi Oetomo\",\"doi\":\"10.25105/PETRO.V8I1.4289\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the world of oil is very common in the production system. This production system produces oil from wells after drilling and well compressions. Over time, the production of a well may decrease due to several parameters of pressure drop and the presence of clay which makes the pipe diameter narrower. There are several methods used to increase the decrease in production including adding artificial lifts such as sucker rod pump, electric submersible pump and gas lift, reservoir stimulation and pipe cleaning if the pipe diameter is reduced due to clay. The well has been installed an artificial lift is a gas lift and this well need an optimization to increase its production. The EC-6 well optimization is planned by comparing the lift-up scenario of the gas lift by adjusting the rate of gas injection and deepening the orifice injection and also an installation of electrical submersible pump. Best percentage of optimization production from EC-6 Well, last scenario is chosen which is new installation artificial lift ESP from gas lift (existing) and gaining 18.52% form existing production\",\"PeriodicalId\":20017,\"journal\":{\"name\":\"PETRO\",\"volume\":\"259 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PETRO\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25105/PETRO.V8I1.4289\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PETRO","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/PETRO.V8I1.4289","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在世界石油生产系统中是非常普遍的。该生产系统在钻井和井压后从井中采油。随着时间的推移,由于压力下降和粘土的存在使管径变窄,井的产量可能会下降。有几种方法可以增加产量的下降,包括增加人工举升,如有杆泵、电潜泵和气举,如果由于粘土导致管径减小,则进行油藏增产和管柱清洗。该井安装了人工举升气举,需要对其进行优化以提高产量。EC-6井的优化计划是通过调整注气速率和加深注气孔来比较气举的举升方案,并安装电潜泵。EC-6井的最佳优化产量百分比,选择最后一种方案,即从现有的气举中安装新的人工举升ESP,从现有的产量中获得18.52%的优化产量
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
OPTIMASI PRODUKSI SUMUR EC-6 DENGAN MEMBANDINGKAN PENGANGKATAN BUATAN GAS LIFT DAN ELECTRIC SUBMERSIBLE PUMP
In the world of oil is very common in the production system. This production system produces oil from wells after drilling and well compressions. Over time, the production of a well may decrease due to several parameters of pressure drop and the presence of clay which makes the pipe diameter narrower. There are several methods used to increase the decrease in production including adding artificial lifts such as sucker rod pump, electric submersible pump and gas lift, reservoir stimulation and pipe cleaning if the pipe diameter is reduced due to clay. The well has been installed an artificial lift is a gas lift and this well need an optimization to increase its production. The EC-6 well optimization is planned by comparing the lift-up scenario of the gas lift by adjusting the rate of gas injection and deepening the orifice injection and also an installation of electrical submersible pump. Best percentage of optimization production from EC-6 Well, last scenario is chosen which is new installation artificial lift ESP from gas lift (existing) and gaining 18.52% form existing production
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
EVALUASI PENYEBAB HILANG SIRKULASI LUMPUR DAN PENANGGULANGANNYA PADA PEMBORAN SUMUR-SUMUR LAPANGAN MINYAK “X” OPTIMASI PRODUKSI SUMUR EC-6 DENGAN MEMBANDINGKAN PENGANGKATAN BUATAN GAS LIFT DAN ELECTRIC SUBMERSIBLE PUMP PERHITUNGAN POTENSI CADANGAN PANASBUMI LAPANGAN “X” MENGGUNAKAN DATA EKSPLORASI EVALUASI NILAI CUTTING CARRYING INDEX PADA LUMPUR DIESEL OIL PENGARUH TEMPERATUR TERHADAP SIFAT FISIK SISTEM LOW SOLID MUD DENGAN PENAMBAHAN ADITIF BIOPOLIMER DAN BENTONITE EXTENDER
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1