{"title":"火法冶金回收PCB生产污泥中有价金属的研究","authors":"C. Han, S. Son, Man-Seung Lee, Yong Hwan Kim","doi":"10.7844/kirr.2019.28.6.87","DOIUrl":null,"url":null,"abstract":"This study investigated the effect of process variables for smelting of recovery of valuable metal in the sludge generated from PCB. The moisture and organics in the sludge was removed by preteatment process. The phase equilibria and slag system was selected by thermodynamic phase calculation program and the process variable of pyro-metallurgical process such as reductant. Smelting temperature and holding time for a recovery of valuable metal was studied.","PeriodicalId":17385,"journal":{"name":"Journal of the Korean Institute of Resources Recycling","volume":"21 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Study on the Pyro-metallurgical Process for Recovery of Valuable Metal in the Sludge Originated from PCB Manufacturing Process\",\"authors\":\"C. Han, S. Son, Man-Seung Lee, Yong Hwan Kim\",\"doi\":\"10.7844/kirr.2019.28.6.87\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study investigated the effect of process variables for smelting of recovery of valuable metal in the sludge generated from PCB. The moisture and organics in the sludge was removed by preteatment process. The phase equilibria and slag system was selected by thermodynamic phase calculation program and the process variable of pyro-metallurgical process such as reductant. Smelting temperature and holding time for a recovery of valuable metal was studied.\",\"PeriodicalId\":17385,\"journal\":{\"name\":\"Journal of the Korean Institute of Resources Recycling\",\"volume\":\"21 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Korean Institute of Resources Recycling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7844/kirr.2019.28.6.87\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Korean Institute of Resources Recycling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7844/kirr.2019.28.6.87","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study on the Pyro-metallurgical Process for Recovery of Valuable Metal in the Sludge Originated from PCB Manufacturing Process
This study investigated the effect of process variables for smelting of recovery of valuable metal in the sludge generated from PCB. The moisture and organics in the sludge was removed by preteatment process. The phase equilibria and slag system was selected by thermodynamic phase calculation program and the process variable of pyro-metallurgical process such as reductant. Smelting temperature and holding time for a recovery of valuable metal was studied.