PLS 2-GeV电子直线加速器中的速调管调制器系统性能

S. Nam, S. Park, S.W. Park, Y. Han
{"title":"PLS 2-GeV电子直线加速器中的速调管调制器系统性能","authors":"S. Nam, S. Park, S.W. Park, Y. Han","doi":"10.1109/PPC.1999.823677","DOIUrl":null,"url":null,"abstract":"A total of 12 units of high power klystron-modulator systems are under continuous operation in the Pohang Light Source (PLS) linac. The peak powers of the modulator and the klystron are 200 MW and 80 MW, respectively. The klystron output frequency is 2856 MHz. Each klystron output is compressed with an SLED and supplied to four of three-meter long accelerating columns. Final electron energy of PLS linac is 2 GeV. The linac has been operated as a full energy injector for the PLS since December 1994. Annual operation hour of the system is about 5000 hours. Since the commissioning of the PLS linac, the total high voltage run time of an oldest unit among the 12 systems has been accumulated over 42,000-hours as of May 1999, and summation of all the units' high voltage run time is approximately 458,000 hours. The overall system availability is well over 90%. To enhance the klystron lifetime, a \"cathode backheating\" operation mode was adopted from May 1999. In this paper, the authors review overall system performance of the klystron-modulator system. The operational status of the klystrons and thyratrons, and the overall system availability statistics for the period of 1994 to May 1999 are also discussed.","PeriodicalId":11209,"journal":{"name":"Digest of Technical Papers. 12th IEEE International Pulsed Power Conference. (Cat. No.99CH36358)","volume":"39 1","pages":"963-966 vol.2"},"PeriodicalIF":0.0000,"publicationDate":"1999-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Klystron-modulator system performance in PLS 2-GeV electron linac\",\"authors\":\"S. Nam, S. Park, S.W. Park, Y. Han\",\"doi\":\"10.1109/PPC.1999.823677\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A total of 12 units of high power klystron-modulator systems are under continuous operation in the Pohang Light Source (PLS) linac. The peak powers of the modulator and the klystron are 200 MW and 80 MW, respectively. The klystron output frequency is 2856 MHz. Each klystron output is compressed with an SLED and supplied to four of three-meter long accelerating columns. Final electron energy of PLS linac is 2 GeV. The linac has been operated as a full energy injector for the PLS since December 1994. Annual operation hour of the system is about 5000 hours. Since the commissioning of the PLS linac, the total high voltage run time of an oldest unit among the 12 systems has been accumulated over 42,000-hours as of May 1999, and summation of all the units' high voltage run time is approximately 458,000 hours. The overall system availability is well over 90%. To enhance the klystron lifetime, a \\\"cathode backheating\\\" operation mode was adopted from May 1999. In this paper, the authors review overall system performance of the klystron-modulator system. The operational status of the klystrons and thyratrons, and the overall system availability statistics for the period of 1994 to May 1999 are also discussed.\",\"PeriodicalId\":11209,\"journal\":{\"name\":\"Digest of Technical Papers. 12th IEEE International Pulsed Power Conference. (Cat. No.99CH36358)\",\"volume\":\"39 1\",\"pages\":\"963-966 vol.2\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-06-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Digest of Technical Papers. 12th IEEE International Pulsed Power Conference. (Cat. No.99CH36358)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PPC.1999.823677\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Digest of Technical Papers. 12th IEEE International Pulsed Power Conference. (Cat. No.99CH36358)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.1999.823677","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在浦项光源(PLS)直线加速器中,共有12台高功率速调管调制器系统在连续运行。调制器和速调管的峰值功率分别为200mw和80mw。速调管输出频率为2856mhz。每个速调管输出都用SLED压缩,并提供给四根三米长的加速柱。PLS直线加速器的最终电子能量为2gev。自1994年12月以来,直线加速器一直作为PLS的全能量注入器运行。系统年运行小时约为5000小时。自PLS直线发电机投入使用以来,截至1999年5月,12个系统中最老机组的总高压运行时间已累计超过42,000小时,所有机组的高压运行时间总和约为458,000小时。整个系统的可用性远远超过90%。为了提高速调管的使用寿命,从1999年5月开始采用“阴极反加热”的工作方式。本文综述了速调管调制器系统的总体性能。本文还讨论了速调管和闸流管的运行状况,以及1994年至1999年5月期间整个系统的可用性统计数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Klystron-modulator system performance in PLS 2-GeV electron linac
A total of 12 units of high power klystron-modulator systems are under continuous operation in the Pohang Light Source (PLS) linac. The peak powers of the modulator and the klystron are 200 MW and 80 MW, respectively. The klystron output frequency is 2856 MHz. Each klystron output is compressed with an SLED and supplied to four of three-meter long accelerating columns. Final electron energy of PLS linac is 2 GeV. The linac has been operated as a full energy injector for the PLS since December 1994. Annual operation hour of the system is about 5000 hours. Since the commissioning of the PLS linac, the total high voltage run time of an oldest unit among the 12 systems has been accumulated over 42,000-hours as of May 1999, and summation of all the units' high voltage run time is approximately 458,000 hours. The overall system availability is well over 90%. To enhance the klystron lifetime, a "cathode backheating" operation mode was adopted from May 1999. In this paper, the authors review overall system performance of the klystron-modulator system. The operational status of the klystrons and thyratrons, and the overall system availability statistics for the period of 1994 to May 1999 are also discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Gas-puff z-pinch plasmas driven by inductive voltage adder-inductive energy storage pulsed power generator ASO-X The evolution of pulsed discharges over PTFE in the presence of various cover gases Numerical research of radiation parameters in cavities irradiated from imploding double-cascade Z-pinch 100 kV, 10 pps repetitive impulse current generator Z, ZX, and X-1: a realistic path to high fusion yield
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1