M. Shimizu, M. Ohkubo, M. Yamamoto, H. Takatsu, T. Ando, H. Nakamura, N. Akino, K. Kawasaki, H. Urakawa, K. Ohtsu, M. Ohta, K. Owada, H. Sato, S. Kajiura
{"title":"JT-60的设计,制造和性能测试-结构和热方面","authors":"M. Shimizu, M. Ohkubo, M. Yamamoto, H. Takatsu, T. Ando, H. Nakamura, N. Akino, K. Kawasaki, H. Urakawa, K. Ohtsu, M. Ohta, K. Owada, H. Sato, S. Kajiura","doi":"10.1016/S0167-899X(86)80016-7","DOIUrl":null,"url":null,"abstract":"<div><p>JT-60 is one of the four large tokamaks aiming at the break-even plasma condition. Construction was started in April 1978 and finished in March 1985. The structure is not only large and complex but is also subjected to huge electromagnetic forces, heat load, etc. These conditions were compensated by the supporting method, the selection of material, the accuracy of fabrication, etc. In the fabrication, inspections of many kinds were carried out to guarantee the quality. After installation at the site performance tests at full power etc. confirmed the soundness of the JT-60 machine.</p></div>","PeriodicalId":82205,"journal":{"name":"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy","volume":"3 3","pages":"Pages 249-264"},"PeriodicalIF":0.0000,"publicationDate":"1986-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S0167-899X(86)80016-7","citationCount":"4","resultStr":"{\"title\":\"Design, fabrication and performance test of JT-60 — Structural and thermal aspects\",\"authors\":\"M. Shimizu, M. Ohkubo, M. Yamamoto, H. Takatsu, T. Ando, H. Nakamura, N. Akino, K. Kawasaki, H. Urakawa, K. Ohtsu, M. Ohta, K. Owada, H. Sato, S. Kajiura\",\"doi\":\"10.1016/S0167-899X(86)80016-7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>JT-60 is one of the four large tokamaks aiming at the break-even plasma condition. Construction was started in April 1978 and finished in March 1985. The structure is not only large and complex but is also subjected to huge electromagnetic forces, heat load, etc. These conditions were compensated by the supporting method, the selection of material, the accuracy of fabrication, etc. In the fabrication, inspections of many kinds were carried out to guarantee the quality. After installation at the site performance tests at full power etc. confirmed the soundness of the JT-60 machine.</p></div>\",\"PeriodicalId\":82205,\"journal\":{\"name\":\"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy\",\"volume\":\"3 3\",\"pages\":\"Pages 249-264\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1986-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S0167-899X(86)80016-7\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0167899X86800167\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear engineering and design/fusion : an international journal devoted to the thermal, mechanical, materials, structural, and design problems of fusion energy","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0167899X86800167","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Design, fabrication and performance test of JT-60 — Structural and thermal aspects
JT-60 is one of the four large tokamaks aiming at the break-even plasma condition. Construction was started in April 1978 and finished in March 1985. The structure is not only large and complex but is also subjected to huge electromagnetic forces, heat load, etc. These conditions were compensated by the supporting method, the selection of material, the accuracy of fabrication, etc. In the fabrication, inspections of many kinds were carried out to guarantee the quality. After installation at the site performance tests at full power etc. confirmed the soundness of the JT-60 machine.