面对融资僵局:通过潮汐能开发的国际分阶段投资进行风险管理

Shelley L. MacDougall
{"title":"面对融资僵局:通过潮汐能开发的国际分阶段投资进行风险管理","authors":"Shelley L. MacDougall","doi":"10.1016/j.ijome.2017.03.002","DOIUrl":null,"url":null,"abstract":"<div><p>Progress toward commercial deployment of in-stream tidal energy devices and commercial arrays has frequently met with delays, particularly in the UK and Canada. While some delays are due to the manifestation of the uncertainties inherent in new technology development, this study seeks to better understand the strategic timing decisions of tidal energy conversion companies in developing a globally-distributed renewable resource. The study consists of semi-structured interviews with executives and senior managers of organizations in the international tidal energy industry. Themes emerging from the interviews find companies manage risk by timing their investments across an international portfolio of seabed leases, consistent with the exercise of real options.</p></div>","PeriodicalId":100705,"journal":{"name":"International Journal of Marine Energy","volume":"18 ","pages":"Pages 78-87"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.ijome.2017.03.002","citationCount":"8","resultStr":"{\"title\":\"Confronting the financing impasse: Risk management through internationally staged investments in tidal energy development\",\"authors\":\"Shelley L. MacDougall\",\"doi\":\"10.1016/j.ijome.2017.03.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Progress toward commercial deployment of in-stream tidal energy devices and commercial arrays has frequently met with delays, particularly in the UK and Canada. While some delays are due to the manifestation of the uncertainties inherent in new technology development, this study seeks to better understand the strategic timing decisions of tidal energy conversion companies in developing a globally-distributed renewable resource. The study consists of semi-structured interviews with executives and senior managers of organizations in the international tidal energy industry. Themes emerging from the interviews find companies manage risk by timing their investments across an international portfolio of seabed leases, consistent with the exercise of real options.</p></div>\",\"PeriodicalId\":100705,\"journal\":{\"name\":\"International Journal of Marine Energy\",\"volume\":\"18 \",\"pages\":\"Pages 78-87\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/j.ijome.2017.03.002\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Marine Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2214166917300267\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Marine Energy","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2214166917300267","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

流内潮汐能装置和商业阵列的商业部署进展经常遇到延迟,特别是在英国和加拿大。虽然有些延迟是由于新技术开发中固有的不确定性的表现,但本研究旨在更好地理解潮汐能转换公司在开发全球分布的可再生资源时的战略时机决策。该研究包括对国际潮汐能行业组织的高管和高级管理人员的半结构化访谈。采访中浮现出的主题是,企业通过在海底租赁的国际投资组合中选择投资时机来管理风险,这与实物期权的行使相一致。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Confronting the financing impasse: Risk management through internationally staged investments in tidal energy development

Progress toward commercial deployment of in-stream tidal energy devices and commercial arrays has frequently met with delays, particularly in the UK and Canada. While some delays are due to the manifestation of the uncertainties inherent in new technology development, this study seeks to better understand the strategic timing decisions of tidal energy conversion companies in developing a globally-distributed renewable resource. The study consists of semi-structured interviews with executives and senior managers of organizations in the international tidal energy industry. Themes emerging from the interviews find companies manage risk by timing their investments across an international portfolio of seabed leases, consistent with the exercise of real options.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board Physical scale model testing of a flexible membrane wave energy converter: Videogrammetric analysis of membrane operation A comparison of control strategies for wave energy converters Predicted power performance of a submerged membrane pressure-differential wave energy converter Ocean power technology design optimization
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1