基于潮流的最优发电脱落动态补救行动方案

A. Shrestha, V. Cecchi, R. Cox
{"title":"基于潮流的最优发电脱落动态补救行动方案","authors":"A. Shrestha, V. Cecchi, R. Cox","doi":"10.1109/TDC.2016.7519892","DOIUrl":null,"url":null,"abstract":"An optimal power flow (OPF)-based generation shedding for dynamic remedial action scheme (RAS) is proposed in this paper. A straightforward generation-shedding cost function is developed using pre-RAS and post-RAS OPF costs. The proposed method updates RAS control actions online based on the system operating conditions and cost functions. The proposed method is tested on a modified IEEE 39-Bus system. Test results demonstrate effectiveness of the proposed generation-shedding method.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"1 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal power flow-based generation shedding for dynamic remedial action scheme\",\"authors\":\"A. Shrestha, V. Cecchi, R. Cox\",\"doi\":\"10.1109/TDC.2016.7519892\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An optimal power flow (OPF)-based generation shedding for dynamic remedial action scheme (RAS) is proposed in this paper. A straightforward generation-shedding cost function is developed using pre-RAS and post-RAS OPF costs. The proposed method updates RAS control actions online based on the system operating conditions and cost functions. The proposed method is tested on a modified IEEE 39-Bus system. Test results demonstrate effectiveness of the proposed generation-shedding method.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"1 1\",\"pages\":\"1-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7519892\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519892","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

提出了一种基于最优潮流(OPF)的发电脱落动态补救方案。利用ras前和ras后的OPF成本,建立了一个简单的减电成本函数。该方法基于系统运行条件和成本函数在线更新RAS控制动作。在改进的IEEE 39总线系统上对该方法进行了测试。试验结果证明了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal power flow-based generation shedding for dynamic remedial action scheme
An optimal power flow (OPF)-based generation shedding for dynamic remedial action scheme (RAS) is proposed in this paper. A straightforward generation-shedding cost function is developed using pre-RAS and post-RAS OPF costs. The proposed method updates RAS control actions online based on the system operating conditions and cost functions. The proposed method is tested on a modified IEEE 39-Bus system. Test results demonstrate effectiveness of the proposed generation-shedding method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast evaluation of probabilistic total transfer capability considering multiple wind farms An automated model based fault locating method for distribution systems Fault location identification of a hybrid HVDC-VSC system containing cable and overhead line segments using transient data Conductor corrosion inspection of aluminum conductor steel reinforced transmission lines Microgrid load management and control strategies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1