{"title":"准备,设置,发射","authors":"M. Furrer, G. Hasbrouck, Jack Yuzna","doi":"10.1061/CIEGAG.0001289","DOIUrl":null,"url":null,"abstract":"The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.","PeriodicalId":50692,"journal":{"name":"Civil Engineering","volume":"105 1","pages":"70-75"},"PeriodicalIF":1.4000,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ready, Set, Launch\",\"authors\":\"M. Furrer, G. Hasbrouck, Jack Yuzna\",\"doi\":\"10.1061/CIEGAG.0001289\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.\",\"PeriodicalId\":50692,\"journal\":{\"name\":\"Civil Engineering\",\"volume\":\"105 1\",\"pages\":\"70-75\"},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2018-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1061/CIEGAG.0001289\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1061/CIEGAG.0001289","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.
期刊介绍:
Reaching an audience of more than 140,000 civil engineers worldwide, the magazine has the largest circulation within the engineering profession, providing a compelling editorial mix of: -Projects- Trends- Engineering Science- Engineering Technology- Engineering History- In-Depth Analysis of Current Issues- Public Policy- Law- Ethics.