{"title":"非稳态工况下卧式火炬机组运行风险分析","authors":"Andrey V. Ivanov, P. K. Esipov, A. R. Buranshin, Je. I. Shakirov, R. A. Ishagulov","doi":"10.17122/ntj-oil-2023-2-81-94","DOIUrl":null,"url":null,"abstract":"The article focuses on complications that arise when new water and gas injection wells are brought on regime and operation of horizontal flare units (HFU), which are part of the reservoir pressure maintenance (RPM) system in the simultaneous water and gas injection mode. In the process of bringing on regime there is a procedure to warm up and maintain working pressure in gas pipelines, for this purpose the associated petroleum gas is redirected to the HFU of the well pad. The existing design of the HFU does not allow maintaining technological parameters of gas injection into the well because of the lack of a regulating device in front of the HFU. The present article describes the measures aimed at ensuring stable operating pressure required when starting up new wells of the reservoir pressure maintenance system in the mode of simultaneous water and gas injection. Modernization of the existing HFU design with installation of a choke diaphragm, providing maintenance of operating pressure in the system of gas pipelines, is offered. The selection and calculation of the choke diaphragm were performed. The results of calculations of HFU with the new design of the choke diaphragm show the possibility of maintaining the working pressure in the gas pipeline when redirecting gas to the HFU during the launch, adding new water and gas injection wells in the system of reservoir pressure maintenance. Calculations of temperature distribution over the HFU surface are performed and dosages of hydrate inhibitor to ensure hydrate-free operation are specified.","PeriodicalId":42555,"journal":{"name":"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation","volume":"116 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2023-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALYSIS OF THE OPERATING RISKS OF HORIZONTAL FLARE UNITS UNDER UNSTEADY EQUIPMENT REGIME CONDITIONS\",\"authors\":\"Andrey V. Ivanov, P. K. Esipov, A. R. Buranshin, Je. I. Shakirov, R. A. Ishagulov\",\"doi\":\"10.17122/ntj-oil-2023-2-81-94\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article focuses on complications that arise when new water and gas injection wells are brought on regime and operation of horizontal flare units (HFU), which are part of the reservoir pressure maintenance (RPM) system in the simultaneous water and gas injection mode. In the process of bringing on regime there is a procedure to warm up and maintain working pressure in gas pipelines, for this purpose the associated petroleum gas is redirected to the HFU of the well pad. The existing design of the HFU does not allow maintaining technological parameters of gas injection into the well because of the lack of a regulating device in front of the HFU. The present article describes the measures aimed at ensuring stable operating pressure required when starting up new wells of the reservoir pressure maintenance system in the mode of simultaneous water and gas injection. Modernization of the existing HFU design with installation of a choke diaphragm, providing maintenance of operating pressure in the system of gas pipelines, is offered. The selection and calculation of the choke diaphragm were performed. The results of calculations of HFU with the new design of the choke diaphragm show the possibility of maintaining the working pressure in the gas pipeline when redirecting gas to the HFU during the launch, adding new water and gas injection wells in the system of reservoir pressure maintenance. Calculations of temperature distribution over the HFU surface are performed and dosages of hydrate inhibitor to ensure hydrate-free operation are specified.\",\"PeriodicalId\":42555,\"journal\":{\"name\":\"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation\",\"volume\":\"116 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2023-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17122/ntj-oil-2023-2-81-94\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MECHANICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nauka i Tehnologii Truboprovodnogo Transporta Nefti i Nefteproduktov-Science & Technologies-Oil and Oil Products Pipeline Transportation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17122/ntj-oil-2023-2-81-94","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MECHANICAL","Score":null,"Total":0}
引用次数: 0

摘要

本文重点讨论了水平井火炬装置(HFU)在同时注水和注气模式下,作为储层压力维持(RPM)系统的一部分,引入新注水井和注气井时出现的问题。在引入状态的过程中,有一个程序来加热和保持天然气管道中的工作压力,为此目的,伴生的石油天然气被重定向到井台的HFU。由于HFU前面没有调节装置,现有的HFU设计无法维持注气井的技术参数。本文介绍了油藏压力维持系统在同时注水注气模式下,为保证新井开井时所需的稳定作业压力所采取的措施。现有HFU设计的现代化,安装了节流隔膜,在天然气管道系统中提供操作压力的维护。进行了节流振片的选型和计算。采用新设计的节流阀膜片对HFU的计算结果表明,在发射过程中将气体重新定向到HFU时,可以保持天然气管道中的工作压力,在储层压力维持系统中增加新的注水井和注气井。计算了HFU表面的温度分布,并指定了水合物抑制剂的剂量,以确保无水合物操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ANALYSIS OF THE OPERATING RISKS OF HORIZONTAL FLARE UNITS UNDER UNSTEADY EQUIPMENT REGIME CONDITIONS
The article focuses on complications that arise when new water and gas injection wells are brought on regime and operation of horizontal flare units (HFU), which are part of the reservoir pressure maintenance (RPM) system in the simultaneous water and gas injection mode. In the process of bringing on regime there is a procedure to warm up and maintain working pressure in gas pipelines, for this purpose the associated petroleum gas is redirected to the HFU of the well pad. The existing design of the HFU does not allow maintaining technological parameters of gas injection into the well because of the lack of a regulating device in front of the HFU. The present article describes the measures aimed at ensuring stable operating pressure required when starting up new wells of the reservoir pressure maintenance system in the mode of simultaneous water and gas injection. Modernization of the existing HFU design with installation of a choke diaphragm, providing maintenance of operating pressure in the system of gas pipelines, is offered. The selection and calculation of the choke diaphragm were performed. The results of calculations of HFU with the new design of the choke diaphragm show the possibility of maintaining the working pressure in the gas pipeline when redirecting gas to the HFU during the launch, adding new water and gas injection wells in the system of reservoir pressure maintenance. Calculations of temperature distribution over the HFU surface are performed and dosages of hydrate inhibitor to ensure hydrate-free operation are specified.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.80
自引率
50.00%
发文量
41
期刊最新文献
INFLUENCE OF OPERATIONAL LOADS ON BALLASTING PARAMETERS OF UNDERWATER CROSSINGS OF TRUNK OIL AND GAS PIPELINES CARBON DIOXIDE UTILIZATION BY PRESSURIZED CONCRETE MIXER EFFICIENCY ANALYSIS OF POLYMERS IN THE COMPOSITION OF ENCAPSULATED MATERIAL FOR BIOREMEDIATION OF SOIL CONTAMINATED WITH FUEL OIL DETERMINATION OF PRODUCTIVITY COEFFICIENTS IN OBTAINING OIL-WATER INFLOWS FROM COMPLEX RESERVOIR ROCKS WITH TEXTURAL HETEROGENEITY PIPE PROTECTION FROM CORROSION UNDER THERMAL INSULATION
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1