筒仓液位实时监测的信息价值分析

IF 1.1 4区 管理学 Q4 MANAGEMENT Informs Journal on Applied Analytics Pub Date : 2023-02-27 DOI:10.1287/inte.2023.1156
Toni Greif, N. Stein, C. Flath
{"title":"筒仓液位实时监测的信息价值分析","authors":"Toni Greif, N. Stein, C. Flath","doi":"10.1287/inte.2023.1156","DOIUrl":null,"url":null,"abstract":"Supply chains in the construction industry are less efficient than in other industries (e.g., retail or automotive). The reason for the less optimized supply chains is often the lack of accurate, up-to-date information. For a leading supplier of building materials and construction systems, we perform a value of information analysis to guide future investments in costly sensors for silo fill-level monitoring. Silo inventory is vendor-managed as construction sites withdraw material from silos as they need it. Ensuring continuous availability of material requires proactive replenishment across products and customers. We establish the optimal purchase level of (partial) information for different hardware costs and service levels. Based on the current ensured service level regime, the minimum total costs are achieved with approximately 50% sensor-equipped silos for medium and high annual sensor costs. The findings on the appropriate use of information technology to improve decision making with partial information are generally relevant for suppliers looking to stand out with service guarantees and short delivery times. History: This paper was refereed.","PeriodicalId":53206,"journal":{"name":"Informs Journal on Applied Analytics","volume":"13 1","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2023-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Information Value Analysis for Real-Time Silo Fill-Level Monitoring\",\"authors\":\"Toni Greif, N. Stein, C. Flath\",\"doi\":\"10.1287/inte.2023.1156\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Supply chains in the construction industry are less efficient than in other industries (e.g., retail or automotive). The reason for the less optimized supply chains is often the lack of accurate, up-to-date information. For a leading supplier of building materials and construction systems, we perform a value of information analysis to guide future investments in costly sensors for silo fill-level monitoring. Silo inventory is vendor-managed as construction sites withdraw material from silos as they need it. Ensuring continuous availability of material requires proactive replenishment across products and customers. We establish the optimal purchase level of (partial) information for different hardware costs and service levels. Based on the current ensured service level regime, the minimum total costs are achieved with approximately 50% sensor-equipped silos for medium and high annual sensor costs. The findings on the appropriate use of information technology to improve decision making with partial information are generally relevant for suppliers looking to stand out with service guarantees and short delivery times. History: This paper was refereed.\",\"PeriodicalId\":53206,\"journal\":{\"name\":\"Informs Journal on Applied Analytics\",\"volume\":\"13 1\",\"pages\":\"\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2023-02-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Informs Journal on Applied Analytics\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1287/inte.2023.1156\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Informs Journal on Applied Analytics","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1287/inte.2023.1156","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

摘要

建筑行业的供应链效率低于其他行业(如零售业或汽车业)。供应链优化程度较低的原因往往是缺乏准确的、最新的信息。对于建筑材料和建筑系统的领先供应商,我们执行价值信息分析,以指导未来投资昂贵的传感器,用于筒仓填充水平监测。筒仓库存是由供应商管理的,建筑工地根据需要从筒仓中提取材料。确保材料的持续可用性需要对产品和客户进行主动补充。我们针对不同的硬件成本和服务水平建立了(部分)信息的最佳购买水平。根据目前确保的服务水平制度,大约50%的传感器配备筒仓可以实现最低的总成本,从而实现中等和较高的年度传感器成本。关于适当使用信息技术以改进部分信息的决策的调查结果通常与希望以服务保证和短交货时间脱颖而出的供应商有关。历史:本文被审稿。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Information Value Analysis for Real-Time Silo Fill-Level Monitoring
Supply chains in the construction industry are less efficient than in other industries (e.g., retail or automotive). The reason for the less optimized supply chains is often the lack of accurate, up-to-date information. For a leading supplier of building materials and construction systems, we perform a value of information analysis to guide future investments in costly sensors for silo fill-level monitoring. Silo inventory is vendor-managed as construction sites withdraw material from silos as they need it. Ensuring continuous availability of material requires proactive replenishment across products and customers. We establish the optimal purchase level of (partial) information for different hardware costs and service levels. Based on the current ensured service level regime, the minimum total costs are achieved with approximately 50% sensor-equipped silos for medium and high annual sensor costs. The findings on the appropriate use of information technology to improve decision making with partial information are generally relevant for suppliers looking to stand out with service guarantees and short delivery times. History: This paper was refereed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
21.40%
发文量
51
期刊最新文献
Alleviating Court Congestion: The Case of the Jerusalem District Court Data-Driven Order Fulfillment Consolidation for Online Grocery Retailing In Memoriam: Srinagesh Gavirneni, 1967–2023 Applying Analytics to Design Lung Transplant Allocation Policy Introduction: 2022 Daniel H. Wagner Prize for Excellence in the Practice of Advanced Analytics and Operations Research
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1