{"title":"用风险屋法缓解生产原材料供应供应链风险管理","authors":"Yulinda Tarigan, Septa Saniatul Mutmainah","doi":"10.30871/jaemb.v11i1.5133","DOIUrl":null,"url":null,"abstract":"Several risks along the supply chain process will cause various kinds of problems, the flow of the raw material procurement process is determined by the roles of several stakeholders such as purchasing, supply chain, production, customer service, and logistics. This research is focused on determining the risks during the procurement of production raw materials and determining the best way to handle the existing risks. House of Risk (HOR) is a method used in this study, which consists of 2 stages with the first stage determining the risk events and risk agents and determining the priority of the risk agent, the second stage determining the priority of risk mitigation. The results of the first stage of HOR found 23 risk events and 24 risk agents with the highest ARP values were (A2) sudden request changes. In the second stage of HOR with the highest ETDK value (PA1) conducts inventory control.","PeriodicalId":14770,"journal":{"name":"JEMBATAN (Jurnal Ekonomi, Manajemen, Bisnis, Auditing, dan Akuntansi)","volume":"321 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Mitigation of Supply Chain Risk Management in Supply of Production Raw Materials Using the House of Risk (HOR) Method\",\"authors\":\"Yulinda Tarigan, Septa Saniatul Mutmainah\",\"doi\":\"10.30871/jaemb.v11i1.5133\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Several risks along the supply chain process will cause various kinds of problems, the flow of the raw material procurement process is determined by the roles of several stakeholders such as purchasing, supply chain, production, customer service, and logistics. This research is focused on determining the risks during the procurement of production raw materials and determining the best way to handle the existing risks. House of Risk (HOR) is a method used in this study, which consists of 2 stages with the first stage determining the risk events and risk agents and determining the priority of the risk agent, the second stage determining the priority of risk mitigation. The results of the first stage of HOR found 23 risk events and 24 risk agents with the highest ARP values were (A2) sudden request changes. In the second stage of HOR with the highest ETDK value (PA1) conducts inventory control.\",\"PeriodicalId\":14770,\"journal\":{\"name\":\"JEMBATAN (Jurnal Ekonomi, Manajemen, Bisnis, Auditing, dan Akuntansi)\",\"volume\":\"321 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JEMBATAN (Jurnal Ekonomi, Manajemen, Bisnis, Auditing, dan Akuntansi)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30871/jaemb.v11i1.5133\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JEMBATAN (Jurnal Ekonomi, Manajemen, Bisnis, Auditing, dan Akuntansi)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30871/jaemb.v11i1.5133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
供应链过程中的几种风险会引起各种各样的问题,原材料采购过程的流动是由采购、供应链、生产、客户服务和物流等几个利益相关者的角色决定的。本研究的重点是确定生产原材料采购过程中的风险,并确定应对现有风险的最佳方法。风险屋法(House of Risk, HOR)是本研究中使用的一种方法,分为两个阶段,第一阶段确定风险事件和风险动因,确定风险动因的优先级,第二阶段确定风险缓解的优先级。第一阶段的HOR结果发现,ARP值最高的23个风险事件和24个风险因子为(A2)突发请求变化。在ETDK值(PA1)最高的HOR的第二阶段进行库存控制。
Mitigation of Supply Chain Risk Management in Supply of Production Raw Materials Using the House of Risk (HOR) Method
Several risks along the supply chain process will cause various kinds of problems, the flow of the raw material procurement process is determined by the roles of several stakeholders such as purchasing, supply chain, production, customer service, and logistics. This research is focused on determining the risks during the procurement of production raw materials and determining the best way to handle the existing risks. House of Risk (HOR) is a method used in this study, which consists of 2 stages with the first stage determining the risk events and risk agents and determining the priority of the risk agent, the second stage determining the priority of risk mitigation. The results of the first stage of HOR found 23 risk events and 24 risk agents with the highest ARP values were (A2) sudden request changes. In the second stage of HOR with the highest ETDK value (PA1) conducts inventory control.