ESP-DST在里海稠油松散砂岩中的首次成功试井

Issatay Dosmukhambetov, Bakhytzhan Taubayev, Ualikhan Yesbolov, A. Sadykov, Muratbek Shmalin, B. Akbayev, Y. Kaipov, Samat Ramatullayev, Daniyar Kuvatov, Olzhas Amanbayev, Bulat Khaziev
{"title":"ESP-DST在里海稠油松散砂岩中的首次成功试井","authors":"Issatay Dosmukhambetov, Bakhytzhan Taubayev, Ualikhan Yesbolov, A. Sadykov, Muratbek Shmalin, B. Akbayev, Y. Kaipov, Samat Ramatullayev, Daniyar Kuvatov, Olzhas Amanbayev, Bulat Khaziev","doi":"10.2118/200121-ms","DOIUrl":null,"url":null,"abstract":"\n The Caspian offshore is a prolific area for hydrocarbon accumulation. Since it is an offshore, it is a challenging area in terms of strict environmental regulations and safety. At the early stage of the project it was clear, that formation properties of the exploration well require artificial lift assistance to produce during well testing. Therefore, designing proper DST string with ESP was crucial to the success of well testing.\n This paper describes unique combination of technologies and techniques that enabled a DST with ESP in combination with the Y tool, that provides capabilities to run thePLT below the pump. Also, one of the main challenges of well testing operation was to handle heavy oil fluid at surface. Being in environmentally sensitive area, designing a surface well testing equipment in a limited footprint, that enables efficient separation and disposal of heavy oil was very critical. Another challenge was unconsolidated formation with the high risk of sand production under drawdown, therefore downhole testing string and ESP pump supposed to withstand large quantity of solids during the production.\n The key technology that enabled testing was a new generation of abrasion resistant ESP pumps, that are designed to handle extensive solids production. The heavy oil also posed a number of risks. The surface equipment was specifically designed to heat oil in the tanks and if required to mix with diesel before flaring operations.\n Local regulation does not permit production during the night time and allows limited number of days for well testing. Therefore, well testing design must enable to acquire all necessary information within short period of test duration. The real-time data transmission and interpretation was a key to achieve main goal of the testing in exploration well - to accurately characterize the reservoir.\n This was the first successful ESP-DST in Caspian Sea. Despite of many challenges, the technologies that were selected for well testing operation was proven to be reliable. This allowed Operator to untap previously not accessible hydrocarbon reserves.","PeriodicalId":10912,"journal":{"name":"Day 3 Wed, March 23, 2022","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"First Successful ESP-DST Well Test in Heavy Oil Unconsolidated Sandstone in Caspian Sea\",\"authors\":\"Issatay Dosmukhambetov, Bakhytzhan Taubayev, Ualikhan Yesbolov, A. Sadykov, Muratbek Shmalin, B. Akbayev, Y. Kaipov, Samat Ramatullayev, Daniyar Kuvatov, Olzhas Amanbayev, Bulat Khaziev\",\"doi\":\"10.2118/200121-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Caspian offshore is a prolific area for hydrocarbon accumulation. Since it is an offshore, it is a challenging area in terms of strict environmental regulations and safety. At the early stage of the project it was clear, that formation properties of the exploration well require artificial lift assistance to produce during well testing. Therefore, designing proper DST string with ESP was crucial to the success of well testing.\\n This paper describes unique combination of technologies and techniques that enabled a DST with ESP in combination with the Y tool, that provides capabilities to run thePLT below the pump. Also, one of the main challenges of well testing operation was to handle heavy oil fluid at surface. Being in environmentally sensitive area, designing a surface well testing equipment in a limited footprint, that enables efficient separation and disposal of heavy oil was very critical. Another challenge was unconsolidated formation with the high risk of sand production under drawdown, therefore downhole testing string and ESP pump supposed to withstand large quantity of solids during the production.\\n The key technology that enabled testing was a new generation of abrasion resistant ESP pumps, that are designed to handle extensive solids production. The heavy oil also posed a number of risks. The surface equipment was specifically designed to heat oil in the tanks and if required to mix with diesel before flaring operations.\\n Local regulation does not permit production during the night time and allows limited number of days for well testing. Therefore, well testing design must enable to acquire all necessary information within short period of test duration. The real-time data transmission and interpretation was a key to achieve main goal of the testing in exploration well - to accurately characterize the reservoir.\\n This was the first successful ESP-DST in Caspian Sea. Despite of many challenges, the technologies that were selected for well testing operation was proven to be reliable. This allowed Operator to untap previously not accessible hydrocarbon reserves.\",\"PeriodicalId\":10912,\"journal\":{\"name\":\"Day 3 Wed, March 23, 2022\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, March 23, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/200121-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, March 23, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/200121-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

里海近海是油气富集区。由于它是海上油田,因此在严格的环境法规和安全方面是一个具有挑战性的领域。在项目的早期阶段,很明显,在试井期间,探井的地层性质需要人工举升辅助生产。因此,设计合适的带有ESP的DST管柱对于试井的成功至关重要。本文介绍了将DST与ESP与Y工具结合使用的独特技术组合,该技术提供了在泵下下入plt的能力。此外,试井作业的主要挑战之一是在地面处理稠油流体。在环境敏感地区,设计一套占地面积有限的地面试井设备,能够有效地分离和处理重油,这一点至关重要。另一个挑战是未固结地层,在下入过程中出砂的风险很高,因此井下测试管柱和ESP泵需要在生产过程中承受大量的固体。实现测试的关键技术是新一代耐磨性ESP泵,该泵设计用于处理大量固体生产。重油也带来了一些风险。地面设备是专门设计用于加热储罐中的油,如果需要在燃除操作之前与柴油混合。当地法规不允许在夜间进行生产,并且只允许有限的试井天数。因此,试井设计必须能够在短时间内获得所有必要的信息。数据的实时传输和解释是实现探井测试的主要目标——准确描述储层特征的关键。这是里海首次成功使用ESP-DST。尽管面临许多挑战,但测试作业所选择的技术被证明是可靠的。这使得作业者能够开发以前无法开采的油气储量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
First Successful ESP-DST Well Test in Heavy Oil Unconsolidated Sandstone in Caspian Sea
The Caspian offshore is a prolific area for hydrocarbon accumulation. Since it is an offshore, it is a challenging area in terms of strict environmental regulations and safety. At the early stage of the project it was clear, that formation properties of the exploration well require artificial lift assistance to produce during well testing. Therefore, designing proper DST string with ESP was crucial to the success of well testing. This paper describes unique combination of technologies and techniques that enabled a DST with ESP in combination with the Y tool, that provides capabilities to run thePLT below the pump. Also, one of the main challenges of well testing operation was to handle heavy oil fluid at surface. Being in environmentally sensitive area, designing a surface well testing equipment in a limited footprint, that enables efficient separation and disposal of heavy oil was very critical. Another challenge was unconsolidated formation with the high risk of sand production under drawdown, therefore downhole testing string and ESP pump supposed to withstand large quantity of solids during the production. The key technology that enabled testing was a new generation of abrasion resistant ESP pumps, that are designed to handle extensive solids production. The heavy oil also posed a number of risks. The surface equipment was specifically designed to heat oil in the tanks and if required to mix with diesel before flaring operations. Local regulation does not permit production during the night time and allows limited number of days for well testing. Therefore, well testing design must enable to acquire all necessary information within short period of test duration. The real-time data transmission and interpretation was a key to achieve main goal of the testing in exploration well - to accurately characterize the reservoir. This was the first successful ESP-DST in Caspian Sea. Despite of many challenges, the technologies that were selected for well testing operation was proven to be reliable. This allowed Operator to untap previously not accessible hydrocarbon reserves.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sea-Fastening Analysis and Design of a Horizontally Transported Large Jacket Brownfield Waterflood Management - Strategic Implementation of Field Trial Learning, South Oman Interpretation of the Alkaline-Surfactant-Polymer Pilot in West Salym Using Tracers What is the Optimum Wettability for Oil Recovery Through Waterflooding? In-Situ Wettability Determination Using Magnetic Resonance Restricted Diffusion
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1