公共秩近似——一种提高配电网规划中概率计算速度的新方法

M. Lindner, R. Witzmann
{"title":"公共秩近似——一种提高配电网规划中概率计算速度的新方法","authors":"M. Lindner, R. Witzmann","doi":"10.1109/TDC.2016.7520057","DOIUrl":null,"url":null,"abstract":"Probabilistic considerations of uncertainties in distribution grid planning is one of the keystones to avoid oversizing of grids and equipment due to unreal worst-case assumptions. However, the computational costs to integrate uncertainties in calculation processes reach from worth mentioning to unfeasible. In this paper, a new method is introduced, which consists of a simplification and a rank comparison process and yields high accuracy as well as low computational costs. Various DER control strategies and nonlinear network equipment can be integrated and time savings of up to a factor of 9000 can be reached.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"50 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Common Rank Approximation - A new method to speed up probabilistic calculations in distribution grid planning\",\"authors\":\"M. Lindner, R. Witzmann\",\"doi\":\"10.1109/TDC.2016.7520057\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Probabilistic considerations of uncertainties in distribution grid planning is one of the keystones to avoid oversizing of grids and equipment due to unreal worst-case assumptions. However, the computational costs to integrate uncertainties in calculation processes reach from worth mentioning to unfeasible. In this paper, a new method is introduced, which consists of a simplification and a rank comparison process and yields high accuracy as well as low computational costs. Various DER control strategies and nonlinear network equipment can be integrated and time savings of up to a factor of 9000 can be reached.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"50 1\",\"pages\":\"1-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7520057\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7520057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

配电网规划中不确定性的概率考虑是避免因不真实的最坏情况假设而导致电网和设备规模过大的关键之一。然而,在计算过程中整合不确定性的计算成本从值得注意到不可行的。本文提出了一种新的方法,该方法由简化和等级比较过程组成,具有较高的精度和较低的计算成本。各种DER控制策略和非线性网络设备可以集成,可以节省高达9000倍的时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Common Rank Approximation - A new method to speed up probabilistic calculations in distribution grid planning
Probabilistic considerations of uncertainties in distribution grid planning is one of the keystones to avoid oversizing of grids and equipment due to unreal worst-case assumptions. However, the computational costs to integrate uncertainties in calculation processes reach from worth mentioning to unfeasible. In this paper, a new method is introduced, which consists of a simplification and a rank comparison process and yields high accuracy as well as low computational costs. Various DER control strategies and nonlinear network equipment can be integrated and time savings of up to a factor of 9000 can be reached.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast evaluation of probabilistic total transfer capability considering multiple wind farms An automated model based fault locating method for distribution systems Fault location identification of a hybrid HVDC-VSC system containing cable and overhead line segments using transient data Conductor corrosion inspection of aluminum conductor steel reinforced transmission lines Microgrid load management and control strategies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1