{"title":"天秤座的FPSO -概念设计挑战","authors":"F. Queiroz, Fernando B. C de Araujo, Mylene Marques Fernandes, Juliana Casaccia Vaz","doi":"10.4043/29536-MS","DOIUrl":null,"url":null,"abstract":"\n This paper presents the strategy behind the conceptual design for Libra FPSOs and the technologies being studied to be applied in the future. Considering new reservoir conditions when compared to other Pre-Salt areas in Brazil, such as high GOR, high CO2 content and high productivity wells, surface facilities team have faced new challenges to define the optimum process plant configuration. Concerns related to topside weight and footprint had to be addressed since the early project phase to make sure that the FPSO would be able to operate safely with high production efficiency in a very restricted area.\n Right after Libra block contract signature, Libra Project Team elaborated the documentation to lease the first FPSO (EWT FPSO Pioneiro de Libra) and started conceptual studies for the design of the FPSOs that will develop the production of the field.\n Besides the economic benefits related to the increase of the oil capacity, the conceptual studies at an early stage of the field development provided the project team more confidence regarding lead time and technical aspects of the FPSO. It is expected that new technologies development will add more value to the projects in the near future.","PeriodicalId":11149,"journal":{"name":"Day 1 Mon, May 06, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Libra's FPSO - Conceptual Design Challenges\",\"authors\":\"F. Queiroz, Fernando B. C de Araujo, Mylene Marques Fernandes, Juliana Casaccia Vaz\",\"doi\":\"10.4043/29536-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper presents the strategy behind the conceptual design for Libra FPSOs and the technologies being studied to be applied in the future. Considering new reservoir conditions when compared to other Pre-Salt areas in Brazil, such as high GOR, high CO2 content and high productivity wells, surface facilities team have faced new challenges to define the optimum process plant configuration. Concerns related to topside weight and footprint had to be addressed since the early project phase to make sure that the FPSO would be able to operate safely with high production efficiency in a very restricted area.\\n Right after Libra block contract signature, Libra Project Team elaborated the documentation to lease the first FPSO (EWT FPSO Pioneiro de Libra) and started conceptual studies for the design of the FPSOs that will develop the production of the field.\\n Besides the economic benefits related to the increase of the oil capacity, the conceptual studies at an early stage of the field development provided the project team more confidence regarding lead time and technical aspects of the FPSO. It is expected that new technologies development will add more value to the projects in the near future.\",\"PeriodicalId\":11149,\"journal\":{\"name\":\"Day 1 Mon, May 06, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, May 06, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29536-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, May 06, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29536-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了Libra fpso概念设计背后的策略以及未来正在研究的应用技术。与巴西其他盐下地区相比,考虑到新的储层条件,如高GOR、高CO2含量和高产能井,地面设施团队面临着确定最佳工艺装置配置的新挑战。从项目早期开始,就必须解决与上层重量和占地面积有关的问题,以确保FPSO能够在非常有限的区域内以高生产效率安全运行。在Libra区块合同签署后,Libra项目团队制定了租赁第一艘FPSO (EWT FPSO pioneer de Libra)的文件,并开始了FPSO设计的概念研究,这些FPSO将用于开发该油田的生产。除了与产油量增加相关的经济效益外,油田开发早期阶段的概念研究使项目团队对FPSO的交货时间和技术方面更有信心。预计在不久的将来,新技术的发展将为项目增加更多的价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Libra's FPSO - Conceptual Design Challenges
This paper presents the strategy behind the conceptual design for Libra FPSOs and the technologies being studied to be applied in the future. Considering new reservoir conditions when compared to other Pre-Salt areas in Brazil, such as high GOR, high CO2 content and high productivity wells, surface facilities team have faced new challenges to define the optimum process plant configuration. Concerns related to topside weight and footprint had to be addressed since the early project phase to make sure that the FPSO would be able to operate safely with high production efficiency in a very restricted area. Right after Libra block contract signature, Libra Project Team elaborated the documentation to lease the first FPSO (EWT FPSO Pioneiro de Libra) and started conceptual studies for the design of the FPSOs that will develop the production of the field. Besides the economic benefits related to the increase of the oil capacity, the conceptual studies at an early stage of the field development provided the project team more confidence regarding lead time and technical aspects of the FPSO. It is expected that new technologies development will add more value to the projects in the near future.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Detailed Look into the 2017 SNAME OC-8 Comparative Wind Load Study A Family of Practical Foundation Models for Dynamic Analyses of Offshore Wind Turbines Turret-Moored FPSO Yaw Motions in a Squall-Prone Region Ultra-Long Subsea Gas Condensate Tie Back – Pseudo Dry Gas – Liquid Handling System Deepwater Opportunities Extra Long Oil Tiebacks Developments
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1