从固体废物中回收资源的经济学

David C. Wilson, David C. Wilson
{"title":"从固体废物中回收资源的经济学","authors":"David C. Wilson,&nbsp;David C. Wilson","doi":"10.1016/0377-841X(78)90053-0","DOIUrl":null,"url":null,"abstract":"<div><p>The decision to implement a resource recovery system as a method of solid waste disposal must be based on a sound economic evaluation of alternatives. Such evaluation is currently hindered by a lack of comparability between independent cost estimates. This is due both to the use of diverse estimation procedures and to the different assumptions made about the resource recovery systems. From a critical assessment of current practices and potential pitfalls in cost and revenue estimation, conventions are proposed to serve as a guide for future work.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 1","pages":"Pages 35-59"},"PeriodicalIF":0.0000,"publicationDate":"1978-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90053-0","citationCount":"7","resultStr":"{\"title\":\"The economics of resource recovery from solid waste\",\"authors\":\"David C. Wilson,&nbsp;David C. Wilson\",\"doi\":\"10.1016/0377-841X(78)90053-0\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The decision to implement a resource recovery system as a method of solid waste disposal must be based on a sound economic evaluation of alternatives. Such evaluation is currently hindered by a lack of comparability between independent cost estimates. This is due both to the use of diverse estimation procedures and to the different assumptions made about the resource recovery systems. From a critical assessment of current practices and potential pitfalls in cost and revenue estimation, conventions are proposed to serve as a guide for future work.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":\"3 1\",\"pages\":\"Pages 35-59\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1978-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(78)90053-0\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X78900530\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X78900530","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

将资源回收系统作为固体废物处理方法的决定必须基于对各种备选办法的合理经济评价。这种评价目前因独立费用概算之间缺乏可比性而受到阻碍。这是由于使用了不同的估计程序和对资源回收系统所作的不同假设。通过对成本和收入估算中当前实践和潜在陷阱的批判性评估,提出了一些惯例,作为未来工作的指南。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The economics of resource recovery from solid waste

The decision to implement a resource recovery system as a method of solid waste disposal must be based on a sound economic evaluation of alternatives. Such evaluation is currently hindered by a lack of comparability between independent cost estimates. This is due both to the use of diverse estimation procedures and to the different assumptions made about the resource recovery systems. From a critical assessment of current practices and potential pitfalls in cost and revenue estimation, conventions are proposed to serve as a guide for future work.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Models for present-worth analysis of selected industrial cash flow patterns Measurement of technology progress and capital cost for nuclear, coal-fired, and gas-fired power plants using the learning curve Modelling capital expenditure Editorial note
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1