具有可测量退化的异构系统的检查维护策略

Z. Ye, M. M. Zhang, X. Xiao
{"title":"具有可测量退化的异构系统的检查维护策略","authors":"Z. Ye, M. M. Zhang, X. Xiao","doi":"10.1109/IEEM.2013.6962647","DOIUrl":null,"url":null,"abstract":"Products are often designed to be very reliable such that even a defective unit can function for a long time. Instead of degradation-based burn-in for these kinds of products, this study advocates an inspection-maintenance strategy to make use of these weak units. Under this policy, an inspection is conducted in the midway of the system operation with the purpose of identifying and replacing a defective unit, while an age-based preventive replacement is carried out at a later stage to prevent a wear-out failure. By capitalizing on the gamma process, the mean cost rate function of this policy is derived. Optimal inspection and preventive maintenance times are discussed. We compare the average cost of this policy with the joint burn-in and maintenance policy to demonstrate its advantages.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"65 1","pages":"1432-1436"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An inspection-maintenance strategy for heterogeneous systems with measurable degradation\",\"authors\":\"Z. Ye, M. M. Zhang, X. Xiao\",\"doi\":\"10.1109/IEEM.2013.6962647\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Products are often designed to be very reliable such that even a defective unit can function for a long time. Instead of degradation-based burn-in for these kinds of products, this study advocates an inspection-maintenance strategy to make use of these weak units. Under this policy, an inspection is conducted in the midway of the system operation with the purpose of identifying and replacing a defective unit, while an age-based preventive replacement is carried out at a later stage to prevent a wear-out failure. By capitalizing on the gamma process, the mean cost rate function of this policy is derived. Optimal inspection and preventive maintenance times are discussed. We compare the average cost of this policy with the joint burn-in and maintenance policy to demonstrate its advantages.\",\"PeriodicalId\":6454,\"journal\":{\"name\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"65 1\",\"pages\":\"1432-1436\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2013.6962647\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962647","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

产品通常设计得非常可靠,即使是有缺陷的部件也能长时间工作。本研究提倡一种检查维护策略来利用这些薄弱的单元,而不是基于退化的这类产品的老化。根据这项政策,我们会在系统运作的中途进行检查,以识别和更换有缺陷的部件,而在稍后阶段则会根据使用年限进行预防性更换,以防止磨损故障。通过利用伽马过程,推导出该策略的平均成本率函数。讨论了最佳检查和预防性维修时间。我们将该政策的平均成本与联合老化和维护政策进行比较,以证明其优势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An inspection-maintenance strategy for heterogeneous systems with measurable degradation
Products are often designed to be very reliable such that even a defective unit can function for a long time. Instead of degradation-based burn-in for these kinds of products, this study advocates an inspection-maintenance strategy to make use of these weak units. Under this policy, an inspection is conducted in the midway of the system operation with the purpose of identifying and replacing a defective unit, while an age-based preventive replacement is carried out at a later stage to prevent a wear-out failure. By capitalizing on the gamma process, the mean cost rate function of this policy is derived. Optimal inspection and preventive maintenance times are discussed. We compare the average cost of this policy with the joint burn-in and maintenance policy to demonstrate its advantages.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Extension of the PROMETHEE Method to the Multicriteria Dual Clustering Problem On the Necessity for Improving Effectiveness of Qualification Process for Spare Parts Additive Manufacturing in a Circular Economy Supply Chain Selecting Temporary Flood Shelter Locations by P-Center Model A Feasible Schema Design Strategy for Amazon DynamoDB: A Nested Normal Form Approach Flood Shelters Location Using P-median Model
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1