采用先进技术,原油储罐翻新周期缩短40%

S. M. Al Yammahi, Mohamed Obaid Al Kaabi, Rashid Al Zaabi, Sachin A. Shendge, Manly Vista Dizon, Ananda Sarkar
{"title":"采用先进技术,原油储罐翻新周期缩短40%","authors":"S. M. Al Yammahi, Mohamed Obaid Al Kaabi, Rashid Al Zaabi, Sachin A. Shendge, Manly Vista Dizon, Ananda Sarkar","doi":"10.2118/207976-ms","DOIUrl":null,"url":null,"abstract":"\n Crude storage tanks are an important asset in every oil company. Having adequate storage capacities is important economically and ensure steady supply of oil in the market. Hence, taking a huge tank out of service for refurbishment is technically and safety critical, and as much as putting it back into service on time.\n This paper presents an advanced methodology and assessment of tank refurbishment process of large capacity Crude Storage Tanks, in compliance with the International Codes and Standards resulting in optimization of the project schedule by approximately 40% as compared to conventional methodology of refurbishment. By deploying the advance techniques, detailed assessment, and dynamic planning we have been able to accelerate the completion of the project, improve tank availability time without compromising with the Integrity and HSE.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"32 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Crude Oil Storage Tank Refurbishment Duration Optimized by 40% Through Advanced Techniques\",\"authors\":\"S. M. Al Yammahi, Mohamed Obaid Al Kaabi, Rashid Al Zaabi, Sachin A. Shendge, Manly Vista Dizon, Ananda Sarkar\",\"doi\":\"10.2118/207976-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Crude storage tanks are an important asset in every oil company. Having adequate storage capacities is important economically and ensure steady supply of oil in the market. Hence, taking a huge tank out of service for refurbishment is technically and safety critical, and as much as putting it back into service on time.\\n This paper presents an advanced methodology and assessment of tank refurbishment process of large capacity Crude Storage Tanks, in compliance with the International Codes and Standards resulting in optimization of the project schedule by approximately 40% as compared to conventional methodology of refurbishment. By deploying the advance techniques, detailed assessment, and dynamic planning we have been able to accelerate the completion of the project, improve tank availability time without compromising with the Integrity and HSE.\",\"PeriodicalId\":10959,\"journal\":{\"name\":\"Day 3 Wed, November 17, 2021\",\"volume\":\"32 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 17, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207976-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207976-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

原油储罐是每个石油公司的重要资产。拥有足够的储存能力在经济上具有重要意义,并能确保市场上石油的稳定供应。因此,从技术上和安全上来说,让一个巨大的储罐退役进行翻新是至关重要的,同样重要的是让它按时重新投入使用。本文提出了一种先进的方法和评估大容量原油储罐的储罐翻新过程,符合国际规范和标准,与传统的翻新方法相比,项目进度优化了约40%。通过采用先进的技术、详细的评估和动态规划,我们能够在不影响完整性和HSE的情况下加速项目的完成,提高储罐的可用时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Crude Oil Storage Tank Refurbishment Duration Optimized by 40% Through Advanced Techniques
Crude storage tanks are an important asset in every oil company. Having adequate storage capacities is important economically and ensure steady supply of oil in the market. Hence, taking a huge tank out of service for refurbishment is technically and safety critical, and as much as putting it back into service on time. This paper presents an advanced methodology and assessment of tank refurbishment process of large capacity Crude Storage Tanks, in compliance with the International Codes and Standards resulting in optimization of the project schedule by approximately 40% as compared to conventional methodology of refurbishment. By deploying the advance techniques, detailed assessment, and dynamic planning we have been able to accelerate the completion of the project, improve tank availability time without compromising with the Integrity and HSE.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of Unconventional Resources Opportunities in the Middle East Tethyan Petroleum System in a Transfer Learning Context Block 61 Drilling Fluids Optimization Journey High Resolution Reservoir Simulator Driven Custom Scripts as the Enabler for Solving Reservoir to Surface Network Coupling Challenges Pre-Engineered Standardized Turbomachinery Solutions: A Strategic Approach to Lean Project Management Using Active and Passive Near-Field Hydrophones to Image the Near-Surface in Ultra-Shallow Waters Offshore Abu Dhabi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1