电池列车部分电气化最佳尺寸的统计方法

Q3 Engineering AUS Pub Date : 2023-03-29 DOI:10.1109/ESARS-ITEC57127.2023.10114834
Maxime Juston, B. Vulturescu, Andre-Philippe Chamaret
{"title":"电池列车部分电气化最佳尺寸的统计方法","authors":"Maxime Juston, B. Vulturescu, Andre-Philippe Chamaret","doi":"10.1109/ESARS-ITEC57127.2023.10114834","DOIUrl":null,"url":null,"abstract":"For limited energy train such as battery train, the sizing of the infrastructure becomes a new challenge especially for a partial electrification today. The sizing of those partial electrification is made based on a worst-case scenario energetically wise. In this paper this sizing is challenged by using a statistical tool to analyze 2 years of circulation data to build a statistical scenario that covers 95% of the energy expenses. Implication on the sizing of an electrification on a real line, and the cost associated is showed. This real case gives insight on how an optimized electrification can imply large changes in terms of costs, work and for a controlled trade-off.","PeriodicalId":38493,"journal":{"name":"AUS","volume":"26 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A statistical approach for the optimal sizing of partial electrification for battery trains\",\"authors\":\"Maxime Juston, B. Vulturescu, Andre-Philippe Chamaret\",\"doi\":\"10.1109/ESARS-ITEC57127.2023.10114834\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For limited energy train such as battery train, the sizing of the infrastructure becomes a new challenge especially for a partial electrification today. The sizing of those partial electrification is made based on a worst-case scenario energetically wise. In this paper this sizing is challenged by using a statistical tool to analyze 2 years of circulation data to build a statistical scenario that covers 95% of the energy expenses. Implication on the sizing of an electrification on a real line, and the cost associated is showed. This real case gives insight on how an optimized electrification can imply large changes in terms of costs, work and for a controlled trade-off.\",\"PeriodicalId\":38493,\"journal\":{\"name\":\"AUS\",\"volume\":\"26 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AUS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESARS-ITEC57127.2023.10114834\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AUS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESARS-ITEC57127.2023.10114834","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

对于有限能源的列车,如电池列车,基础设施的规模成为一个新的挑战,特别是在部分电气化的今天。这些部分电气化的大小是基于最坏的情况下,大力明智。在本文中,通过使用统计工具分析2年的循环数据,建立一个涵盖95%能源费用的统计情景,对这种规模进行了挑战。电气化对实际线路尺寸的影响,以及相关的成本显示。这个真实的案例让我们了解了优化的电气化如何在成本、工作和可控的权衡方面带来巨大的变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A statistical approach for the optimal sizing of partial electrification for battery trains
For limited energy train such as battery train, the sizing of the infrastructure becomes a new challenge especially for a partial electrification today. The sizing of those partial electrification is made based on a worst-case scenario energetically wise. In this paper this sizing is challenged by using a statistical tool to analyze 2 years of circulation data to build a statistical scenario that covers 95% of the energy expenses. Implication on the sizing of an electrification on a real line, and the cost associated is showed. This real case gives insight on how an optimized electrification can imply large changes in terms of costs, work and for a controlled trade-off.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
AUS
AUS Engineering-Architecture
CiteScore
0.40
自引率
0.00%
发文量
14
期刊介绍: Revista AUS es una publicación académica de corriente principal perteneciente a la comunidad de investigadores de la arquitectura y el urbanismo sostenibles, en el ámbito de las culturas locales y globales. La revista es semestral, cuenta con comité editorial y sus artículos son revisados por pares en el sistema de doble ciego. Periodicidad semestral.
期刊最新文献
Envejecer en la playa. La emergente migración de personas mayores hacia el Litoral Central de Chile (1987 – 2017) Análisis comparativo en la rehabilitación de envolvente térmica de cerramientos educacionales con criterio ambiental Decisiones de diseño y construcción que influyen en la durabilidad del bambú en edificaciones Hábitat anfibio de la selva amazónica. El caso de la zona rural con tipologías de asentamiento y la vivienda en el barrio Victoria Regia Aeropuerto y arquitectura moderna, una tensión entre global y local: el caso de Punta Arenas
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1