结构生命周期的三维建模

IF 0.3 Q4 ENGINEERING, MULTIDISCIPLINARY Science & Technique Pub Date : 2021-02-03 DOI:10.21122/2227-1031-2021-20-1-5-9
S. Leonovich, J. Riachi
{"title":"结构生命周期的三维建模","authors":"S. Leonovich, J. Riachi","doi":"10.21122/2227-1031-2021-20-1-5-9","DOIUrl":null,"url":null,"abstract":"Owners and construction management are in permanent search to increase competitiveness, reduce cost and time and maintain a high quality of products and services. In this objective project management tend to organize work execution by implementing comprehensive, linked and sequential processes, making full use of every work effort and limiting work duplication and rework. Since the ’90s, the 3D-modeling is used to coordinate, plan, build and manage future structures. The BIM approach proposes to stakeholders to participate in an intelligent centrally shared 3D-model making use of every contribution to this model, facilitating the coordination, solving the interfaces, reducing duplication efforts and carrying the developed data information throughout the life cycle of the structure and beyond the construction phase. Completing a complex structure requires an important level of design management and coordination of the interface between architect, designer, mechanic, electrician, and other designers. Basic input is required from equipment suppliers. Now, for a good reason, everyone in charge of the process is focused on achieving their process with less cost and less time. Thus, he inadvertently reduces the effort associated with surrounding or subsequent actions, and focuses on his main result. For example, structural engineering developing a 3D-model will focus on clean structural design focusing on structural continuity, geometry identification, and calculation model for finite elements of software. Likewise, a mechanical engineer will model plumbing and mechanical networks for fabrication and installation purposes. It is the same with other design disciplines.","PeriodicalId":42375,"journal":{"name":"Science & Technique","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2021-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"3D-Modeling for Life Cycle of the Structure\",\"authors\":\"S. Leonovich, J. Riachi\",\"doi\":\"10.21122/2227-1031-2021-20-1-5-9\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Owners and construction management are in permanent search to increase competitiveness, reduce cost and time and maintain a high quality of products and services. In this objective project management tend to organize work execution by implementing comprehensive, linked and sequential processes, making full use of every work effort and limiting work duplication and rework. Since the ’90s, the 3D-modeling is used to coordinate, plan, build and manage future structures. The BIM approach proposes to stakeholders to participate in an intelligent centrally shared 3D-model making use of every contribution to this model, facilitating the coordination, solving the interfaces, reducing duplication efforts and carrying the developed data information throughout the life cycle of the structure and beyond the construction phase. Completing a complex structure requires an important level of design management and coordination of the interface between architect, designer, mechanic, electrician, and other designers. Basic input is required from equipment suppliers. Now, for a good reason, everyone in charge of the process is focused on achieving their process with less cost and less time. Thus, he inadvertently reduces the effort associated with surrounding or subsequent actions, and focuses on his main result. For example, structural engineering developing a 3D-model will focus on clean structural design focusing on structural continuity, geometry identification, and calculation model for finite elements of software. Likewise, a mechanical engineer will model plumbing and mechanical networks for fabrication and installation purposes. It is the same with other design disciplines.\",\"PeriodicalId\":42375,\"journal\":{\"name\":\"Science & Technique\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2021-02-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Science & Technique\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21122/2227-1031-2021-20-1-5-9\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Science & Technique","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21122/2227-1031-2021-20-1-5-9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 3

摘要

业主和施工管理人员一直在寻求提高竞争力,降低成本和时间,并保持高质量的产品和服务。在这一目标下,项目管理倾向于通过实施全面的、联系的和顺序的过程来组织工作执行,充分利用每一项工作努力,限制工作重复和返工。自90年代以来,3d建模被用于协调、规划、建造和管理未来的结构。BIM方法建议利益相关者参与一个智能的集中共享的3d模型,利用对该模型的每一个贡献,促进协调,解决接口,减少重复工作,并在整个结构生命周期和施工阶段之后携带开发的数据信息。完成一个复杂的结构需要一个重要的设计管理水平,以及建筑师、设计师、机械师、电工和其他设计师之间的界面协调。设备供应商需要提供基本的投入。现在,由于一个很好的理由,负责流程的每个人都专注于以更少的成本和更少的时间实现他们的流程。因此,他无意中减少了与周围或后续行动相关的努力,并专注于他的主要结果。例如,开发3d模型的结构工程将侧重于清洁结构设计,重点是结构连续性,几何识别和软件有限元计算模型。同样,机械工程师将为制造和安装目的建模管道和机械网络。其他设计学科也是如此。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
3D-Modeling for Life Cycle of the Structure
Owners and construction management are in permanent search to increase competitiveness, reduce cost and time and maintain a high quality of products and services. In this objective project management tend to organize work execution by implementing comprehensive, linked and sequential processes, making full use of every work effort and limiting work duplication and rework. Since the ’90s, the 3D-modeling is used to coordinate, plan, build and manage future structures. The BIM approach proposes to stakeholders to participate in an intelligent centrally shared 3D-model making use of every contribution to this model, facilitating the coordination, solving the interfaces, reducing duplication efforts and carrying the developed data information throughout the life cycle of the structure and beyond the construction phase. Completing a complex structure requires an important level of design management and coordination of the interface between architect, designer, mechanic, electrician, and other designers. Basic input is required from equipment suppliers. Now, for a good reason, everyone in charge of the process is focused on achieving their process with less cost and less time. Thus, he inadvertently reduces the effort associated with surrounding or subsequent actions, and focuses on his main result. For example, structural engineering developing a 3D-model will focus on clean structural design focusing on structural continuity, geometry identification, and calculation model for finite elements of software. Likewise, a mechanical engineer will model plumbing and mechanical networks for fabrication and installation purposes. It is the same with other design disciplines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Science & Technique
Science & Technique ENGINEERING, MULTIDISCIPLINARY-
自引率
50.00%
发文量
47
审稿时长
8 weeks
期刊最新文献
Particularities of Exergy Analysis in Air Conditioning Systems Structure and Organization of Regional Renewable Energy Cluster in Vietnam About Braking of Wheeled Vehicle Equipped with Automated Brake Control System Proposals for Rehabilitation of Operated Combined Insulated Rolled Roofs Formation of Logistics Approach to Economic Development of Road Sector of the Republic of Belarus
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1