成功完成15K裸眼多级压裂完井作业

Rasim Serdar Rodoplu, A. Tiss, Asif Bin Adnan, Ahmed Siham
{"title":"成功完成15K裸眼多级压裂完井作业","authors":"Rasim Serdar Rodoplu, A. Tiss, Asif Bin Adnan, Ahmed Siham","doi":"10.2118/193114-MS","DOIUrl":null,"url":null,"abstract":"\n 15K Open Hole Multi Stage Fracturing (OH MSF) completion was successfully implemented with the goal of hydrocarbon production at sustained rates from tight HPHT gas formation and to diversify technology portfolio to address similar challenges.\n OH MSF completion technology has been globally proven successful in enhancing the well design, stimulation efficiency and production. As more wells are being drilled deeper, longer and in more challenging formations, the OH MSF technology also evolved resulting in introduction of a HPHT – 15K psi working pressure - MSF system. The technology had to overcome many challenges before it could be deployed. Pre-deployment stages of this technology have two main components;Standard tool design including material selection, NACE compatibility, dimensions, API standard compliance, testing, and prototypingCompletion construction design, installation challenges & force analysis\n The candidate well was drilled horizontally to achieve enough formation contact in a tight HPHT formation. Wells with similar poor development have been seen to require upwards of current OH MSF completions reaching to their limits of 10K psi differential pressure downhole to successfully complete with proppant fracturing. Candidate well was planned to be trial tested with 15K OH MSF completion to solve the challenge of high breakdown pressures and to capitalize on the greater productivity of open hole completions across this tight HPHT formation.\n The proppant fracturing operations resulted in the successful completion of five stages of proppant fracturing in this formation. A total of more than 1.2 million lbs of proppant was placed during hydraulic fracturing operations exceeding 10K differential pressure across the MSF completion. The well showed an excellent post frac flowback results exceeding expectations. Previous wellbore completion pressure limitations in many instances acted as a constraint to reach job objectives has been surmounted.\n The implementation of 15K OH MSF completion system has helped pave the way to attend tighter formations in an efficient and cost effective manner. Engineering approach and design to develop this completion system and utilization in the right candidate confirmed the benefit of the completion for field development options. The implementation of this technology will improve and diversify the efforts in exploiting tight HPHT formations.","PeriodicalId":11079,"journal":{"name":"Day 4 Thu, November 15, 2018","volume":"6 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Successful Implementation of 15K Open Hole Multi Stage Fracturing Completion\",\"authors\":\"Rasim Serdar Rodoplu, A. Tiss, Asif Bin Adnan, Ahmed Siham\",\"doi\":\"10.2118/193114-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n 15K Open Hole Multi Stage Fracturing (OH MSF) completion was successfully implemented with the goal of hydrocarbon production at sustained rates from tight HPHT gas formation and to diversify technology portfolio to address similar challenges.\\n OH MSF completion technology has been globally proven successful in enhancing the well design, stimulation efficiency and production. As more wells are being drilled deeper, longer and in more challenging formations, the OH MSF technology also evolved resulting in introduction of a HPHT – 15K psi working pressure - MSF system. The technology had to overcome many challenges before it could be deployed. Pre-deployment stages of this technology have two main components;Standard tool design including material selection, NACE compatibility, dimensions, API standard compliance, testing, and prototypingCompletion construction design, installation challenges & force analysis\\n The candidate well was drilled horizontally to achieve enough formation contact in a tight HPHT formation. Wells with similar poor development have been seen to require upwards of current OH MSF completions reaching to their limits of 10K psi differential pressure downhole to successfully complete with proppant fracturing. Candidate well was planned to be trial tested with 15K OH MSF completion to solve the challenge of high breakdown pressures and to capitalize on the greater productivity of open hole completions across this tight HPHT formation.\\n The proppant fracturing operations resulted in the successful completion of five stages of proppant fracturing in this formation. A total of more than 1.2 million lbs of proppant was placed during hydraulic fracturing operations exceeding 10K differential pressure across the MSF completion. The well showed an excellent post frac flowback results exceeding expectations. Previous wellbore completion pressure limitations in many instances acted as a constraint to reach job objectives has been surmounted.\\n The implementation of 15K OH MSF completion system has helped pave the way to attend tighter formations in an efficient and cost effective manner. Engineering approach and design to develop this completion system and utilization in the right candidate confirmed the benefit of the completion for field development options. The implementation of this technology will improve and diversify the efforts in exploiting tight HPHT formations.\",\"PeriodicalId\":11079,\"journal\":{\"name\":\"Day 4 Thu, November 15, 2018\",\"volume\":\"6 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 15, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193114-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 15, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193114-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

15K裸眼多级压裂(OH MSF)完井成功实施,目标是从致密高温高压气藏中以持续的速度生产油气,并使技术组合多样化,以应对类似的挑战。OH MSF完井技术在提高油井设计、增产效率和产量方面取得了成功。随着越来越多的井被钻得更深、更长、更有挑战性的地层,OH MSF技术也在不断发展,从而引入了HPHT - 15K psi的工作压力- MSF系统。这项技术在投入使用之前必须克服许多挑战。该技术的预部署阶段主要包括两个部分:标准工具设计,包括材料选择、NACE兼容性、尺寸、API标准、测试和原型设计。完井施工设计、安装挑战和受力分析。类似开发状况较差的井需要目前的OH MSF完井,其井下压差达到10K psi的极限,才能成功完成支撑剂压裂。候选井计划进行15K OH MSF完井试验测试,以解决高破裂压力的挑战,并利用裸眼完井在致密高温高压地层中的更高产能。支撑剂压裂作业成功完成了该地层的5段支撑剂压裂。在超过10K压差的MSF完井水力压裂作业中,总共投放了超过120万磅的支撑剂。该井的压裂后返排效果非常好,超出预期。在许多情况下,之前的完井压力限制已经成为实现作业目标的制约因素。15K OH MSF完井系统的实施,为以高效、低成本的方式进入致密地层铺平了道路。开发该完井系统的工程方法和设计,以及在合适的候选者中的应用,证实了完井对油田开发方案的好处。该技术的实施将改善致密高温高压地层的开发工作,并使其多样化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Successful Implementation of 15K Open Hole Multi Stage Fracturing Completion
15K Open Hole Multi Stage Fracturing (OH MSF) completion was successfully implemented with the goal of hydrocarbon production at sustained rates from tight HPHT gas formation and to diversify technology portfolio to address similar challenges. OH MSF completion technology has been globally proven successful in enhancing the well design, stimulation efficiency and production. As more wells are being drilled deeper, longer and in more challenging formations, the OH MSF technology also evolved resulting in introduction of a HPHT – 15K psi working pressure - MSF system. The technology had to overcome many challenges before it could be deployed. Pre-deployment stages of this technology have two main components;Standard tool design including material selection, NACE compatibility, dimensions, API standard compliance, testing, and prototypingCompletion construction design, installation challenges & force analysis The candidate well was drilled horizontally to achieve enough formation contact in a tight HPHT formation. Wells with similar poor development have been seen to require upwards of current OH MSF completions reaching to their limits of 10K psi differential pressure downhole to successfully complete with proppant fracturing. Candidate well was planned to be trial tested with 15K OH MSF completion to solve the challenge of high breakdown pressures and to capitalize on the greater productivity of open hole completions across this tight HPHT formation. The proppant fracturing operations resulted in the successful completion of five stages of proppant fracturing in this formation. A total of more than 1.2 million lbs of proppant was placed during hydraulic fracturing operations exceeding 10K differential pressure across the MSF completion. The well showed an excellent post frac flowback results exceeding expectations. Previous wellbore completion pressure limitations in many instances acted as a constraint to reach job objectives has been surmounted. The implementation of 15K OH MSF completion system has helped pave the way to attend tighter formations in an efficient and cost effective manner. Engineering approach and design to develop this completion system and utilization in the right candidate confirmed the benefit of the completion for field development options. The implementation of this technology will improve and diversify the efforts in exploiting tight HPHT formations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Drilling Optimization in Action - Delivering 125 Field Records in 6 Quarters Tight Reservoir: Characterization, Modeling, and Development Feasibility Production Enhancement in Tight Carbonate Reservoir with Propellant Stimulation Technique: Case Study in the State of Kuwait Field Trial Results for New Sand Control Technology for Water Injectors Impact of Natural Fractures in Reservoir Modelling and Characterization. Case Study in UAE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1