工期估计——关键链调度中的一种新方法

K. Rezaie, B. Manouchehrabadi, S. N. Shirkouhi
{"title":"工期估计——关键链调度中的一种新方法","authors":"K. Rezaie, B. Manouchehrabadi, S. N. Shirkouhi","doi":"10.1109/AMS.2009.67","DOIUrl":null,"url":null,"abstract":"Critical chain project management (CCPM) has been introduced in 1997 by Goldratt which was known for its theory, theory of constraint. Since then CCPM attracted a great attention both in academic world and execution communities. One of the most controversial points of the CCPM which is a subject of critics is the way it suggests for activity duration estimation. This paper proposes a new method for duration estimation of activities by measuring the amount of uncertainty embedded in each activity duration and then taking out of safety times associated with this uncertainty. The validity of the proposed method is tested by conducting a computer simulation on some test problems. Simulation analysis shows that the proposed method yields schedules which are more reliable than the schedules produced by original CCPM method of duration estimation.","PeriodicalId":6461,"journal":{"name":"2009 Third Asia International Conference on Modelling & Simulation","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Duration Estimation, a New Approach in Critical Chain Scheduling\",\"authors\":\"K. Rezaie, B. Manouchehrabadi, S. N. Shirkouhi\",\"doi\":\"10.1109/AMS.2009.67\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Critical chain project management (CCPM) has been introduced in 1997 by Goldratt which was known for its theory, theory of constraint. Since then CCPM attracted a great attention both in academic world and execution communities. One of the most controversial points of the CCPM which is a subject of critics is the way it suggests for activity duration estimation. This paper proposes a new method for duration estimation of activities by measuring the amount of uncertainty embedded in each activity duration and then taking out of safety times associated with this uncertainty. The validity of the proposed method is tested by conducting a computer simulation on some test problems. Simulation analysis shows that the proposed method yields schedules which are more reliable than the schedules produced by original CCPM method of duration estimation.\",\"PeriodicalId\":6461,\"journal\":{\"name\":\"2009 Third Asia International Conference on Modelling & Simulation\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Third Asia International Conference on Modelling & Simulation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AMS.2009.67\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Third Asia International Conference on Modelling & Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AMS.2009.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

摘要

关键链项目管理(CCPM)是由Goldratt于1997年提出的,该理论以约束理论而闻名。从那时起,CCPM受到了学术界和执行界的广泛关注。CCPM最具争议的一点是它对活动持续时间估计的建议方式。本文提出了一种新的活动持续时间估计方法,该方法通过测量每个活动持续时间中嵌入的不确定性的数量,然后取出与该不确定性相关的安全时间。通过对一些测试问题的计算机仿真,验证了所提方法的有效性。仿真分析表明,该方法产生的调度调度比原来的CCPM工期估计方法产生的调度调度更加可靠。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Duration Estimation, a New Approach in Critical Chain Scheduling
Critical chain project management (CCPM) has been introduced in 1997 by Goldratt which was known for its theory, theory of constraint. Since then CCPM attracted a great attention both in academic world and execution communities. One of the most controversial points of the CCPM which is a subject of critics is the way it suggests for activity duration estimation. This paper proposes a new method for duration estimation of activities by measuring the amount of uncertainty embedded in each activity duration and then taking out of safety times associated with this uncertainty. The validity of the proposed method is tested by conducting a computer simulation on some test problems. Simulation analysis shows that the proposed method yields schedules which are more reliable than the schedules produced by original CCPM method of duration estimation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Transparent Classification Model Using a Hybrid Soft Computing Method Study on the Performance of Tag-Tag Collision Avoidance Algorithms in RFID Systems Cross Layer Design of Wireless LAN for Telemedicine Application Jawi Character Speech-to-Text Engine Using Linear Predictive and Neural Network for Effective Reading Advances in Supply Chain Simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1