{"title":"解决长期含水历史匹配挑战有助于优化钻井方案","authors":"N. Yusuf, P. Andrew, Lynn Silpngarmlers","doi":"10.2118/198851-MS","DOIUrl":null,"url":null,"abstract":"\n Reservoir_B7 is one of the top reservoirs in Adobe field and was considered for further development in a multi-year drilling campaign. The initial opportunity identification and new drill forecasts for this reservoir were done using an old simulation model. Over the years, the challenge with this model had been the prediction water production from existing producers which necessitated the introduction of local permeability barriers in the model. However, to validate this opportunity and ensure reliability of production forecasts, a new simulation study was commissioned.\n A systematic approach was employed during the new study which involved continuous engagement between Earth Modeler and Simulation Engineer. This led to identification of a low-quality facies which had not been properly characterized. Recharacterization of these facies led to an improvement in history match with an overall good pressure and saturation matches on both well-by-well and reservoir levels. The latest history matched model was used to validate the proposed opportunity and indicated a sub-economic incremental recovery. This led to elimination of hitherto top opportunity from the drilling program and preventing a bad investment by the company.","PeriodicalId":11110,"journal":{"name":"Day 2 Tue, August 06, 2019","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Resolution of a Perennial Water-Cut History Match Challenge Helps to Optimize Drilling Program\",\"authors\":\"N. Yusuf, P. Andrew, Lynn Silpngarmlers\",\"doi\":\"10.2118/198851-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Reservoir_B7 is one of the top reservoirs in Adobe field and was considered for further development in a multi-year drilling campaign. The initial opportunity identification and new drill forecasts for this reservoir were done using an old simulation model. Over the years, the challenge with this model had been the prediction water production from existing producers which necessitated the introduction of local permeability barriers in the model. However, to validate this opportunity and ensure reliability of production forecasts, a new simulation study was commissioned.\\n A systematic approach was employed during the new study which involved continuous engagement between Earth Modeler and Simulation Engineer. This led to identification of a low-quality facies which had not been properly characterized. Recharacterization of these facies led to an improvement in history match with an overall good pressure and saturation matches on both well-by-well and reservoir levels. The latest history matched model was used to validate the proposed opportunity and indicated a sub-economic incremental recovery. This led to elimination of hitherto top opportunity from the drilling program and preventing a bad investment by the company.\",\"PeriodicalId\":11110,\"journal\":{\"name\":\"Day 2 Tue, August 06, 2019\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, August 06, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/198851-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, August 06, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198851-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

储层_b7是Adobe油田的顶级储层之一,在多年的钻井活动中考虑进一步开发。利用旧的模拟模型进行了该储层的初始机会识别和新钻次预测。多年来,该模型面临的挑战一直是预测现有生产商的产水量,这就需要在模型中引入局部渗透率障碍。然而,为了验证这一机会并确保生产预测的可靠性,委托进行了一项新的模拟研究。在新的研究中,采用了一种系统的方法,其中包括地球建模师和模拟工程师之间的持续接触。这导致鉴定出一种质量较低的相,而这种相没有得到适当的表征。对这些相的重新描述改善了历史匹配,在井间和油藏水平上都获得了良好的压力和饱和度匹配。最新的历史匹配模型用于验证所提出的机会,并表明亚经济增量复苏。这导致了钻井计划中迄今为止的最佳机会的消除,并防止了公司的不良投资。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Resolution of a Perennial Water-Cut History Match Challenge Helps to Optimize Drilling Program
Reservoir_B7 is one of the top reservoirs in Adobe field and was considered for further development in a multi-year drilling campaign. The initial opportunity identification and new drill forecasts for this reservoir were done using an old simulation model. Over the years, the challenge with this model had been the prediction water production from existing producers which necessitated the introduction of local permeability barriers in the model. However, to validate this opportunity and ensure reliability of production forecasts, a new simulation study was commissioned. A systematic approach was employed during the new study which involved continuous engagement between Earth Modeler and Simulation Engineer. This led to identification of a low-quality facies which had not been properly characterized. Recharacterization of these facies led to an improvement in history match with an overall good pressure and saturation matches on both well-by-well and reservoir levels. The latest history matched model was used to validate the proposed opportunity and indicated a sub-economic incremental recovery. This led to elimination of hitherto top opportunity from the drilling program and preventing a bad investment by the company.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Impact of Well Production Tubing Diameter on Multiphase Flow Regime Profile in Oredo Fields, Niger Delta, Nigeria Cassandra: A Model and Simulator Developed for Critical Drawdown Estimation in Unconsolidated Reservoirs The Use of 4D & Dynamic Synthesis in Brown Field Development: A Case Study of S-P3 Infill Well Maturation, Preparation and Drilling On the Characterisation of the Flow Regimes of Drilling Fluids Performance Evaluation of Cashew Nut Shell Liquid CNSL as Flow Improver for Waxy Crude Oils
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1