Chun Kit Lo, Y. Chan, M. W. Choi, P. F. Chan, Yuen Yee Chan, Chung Leung Henry Poon, C. Chu
{"title":"当代呼吸病房气管切开术临床管理:持续质量改进方案","authors":"Chun Kit Lo, Y. Chan, M. W. Choi, P. F. Chan, Yuen Yee Chan, Chung Leung Henry Poon, C. Chu","doi":"10.1183/13993003.CONGRESS-2018.PA1503","DOIUrl":null,"url":null,"abstract":"Introduction: Tracheostomy(T) is regarded as a “high-risk, low-incidence” care. Mismanagement leading to airway occlusion could be fatal. In nursing, T is introduced as airway management. More deeply knowledge like T tube or its emergency management are usually not included. The handover communication and observation were also found inadequate. Aims: The aims are to (i)improve handover communication and documentation and (ii)prevent complications and have the preparedness of in the management of tracheostomy emergency. Methods: The T care working process was reengineered in a systematic approach(Fig.1) carried out(1/5 to 31/12/2017) in respiratory wards. It included:(1)T records and observation chart for assessing and assisting the management of patients with complex health conditions;(2)Nursing care report for reminding and recording the intervention of T care provided;(3)Emergency workflow poster and bedside emergency equipment box for better airway emergency preparedness;(4)Regular training in indication and anatomy of T and the standard of care and emergency management. Result: There were 38 admissions of T cases during study period. Staff’s T knowledge and self-efficacy of performing T care were evaluated(N=31). Both of them showed with a great improvement with statistically significant (P Conclusion: The project could achieve the aims (i)&(ii).","PeriodicalId":76252,"journal":{"name":"Nurses Lamp","volume":"17 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Contemporary tracheostomy clinical management in respiratory wards: A continuous quality improvement program\",\"authors\":\"Chun Kit Lo, Y. Chan, M. W. Choi, P. F. Chan, Yuen Yee Chan, Chung Leung Henry Poon, C. Chu\",\"doi\":\"10.1183/13993003.CONGRESS-2018.PA1503\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction: Tracheostomy(T) is regarded as a “high-risk, low-incidence” care. Mismanagement leading to airway occlusion could be fatal. In nursing, T is introduced as airway management. More deeply knowledge like T tube or its emergency management are usually not included. The handover communication and observation were also found inadequate. Aims: The aims are to (i)improve handover communication and documentation and (ii)prevent complications and have the preparedness of in the management of tracheostomy emergency. Methods: The T care working process was reengineered in a systematic approach(Fig.1) carried out(1/5 to 31/12/2017) in respiratory wards. It included:(1)T records and observation chart for assessing and assisting the management of patients with complex health conditions;(2)Nursing care report for reminding and recording the intervention of T care provided;(3)Emergency workflow poster and bedside emergency equipment box for better airway emergency preparedness;(4)Regular training in indication and anatomy of T and the standard of care and emergency management. Result: There were 38 admissions of T cases during study period. Staff’s T knowledge and self-efficacy of performing T care were evaluated(N=31). Both of them showed with a great improvement with statistically significant (P Conclusion: The project could achieve the aims (i)&(ii).\",\"PeriodicalId\":76252,\"journal\":{\"name\":\"Nurses Lamp\",\"volume\":\"17 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nurses Lamp\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1183/13993003.CONGRESS-2018.PA1503\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nurses Lamp","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1183/13993003.CONGRESS-2018.PA1503","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Contemporary tracheostomy clinical management in respiratory wards: A continuous quality improvement program
Introduction: Tracheostomy(T) is regarded as a “high-risk, low-incidence” care. Mismanagement leading to airway occlusion could be fatal. In nursing, T is introduced as airway management. More deeply knowledge like T tube or its emergency management are usually not included. The handover communication and observation were also found inadequate. Aims: The aims are to (i)improve handover communication and documentation and (ii)prevent complications and have the preparedness of in the management of tracheostomy emergency. Methods: The T care working process was reengineered in a systematic approach(Fig.1) carried out(1/5 to 31/12/2017) in respiratory wards. It included:(1)T records and observation chart for assessing and assisting the management of patients with complex health conditions;(2)Nursing care report for reminding and recording the intervention of T care provided;(3)Emergency workflow poster and bedside emergency equipment box for better airway emergency preparedness;(4)Regular training in indication and anatomy of T and the standard of care and emergency management. Result: There were 38 admissions of T cases during study period. Staff’s T knowledge and self-efficacy of performing T care were evaluated(N=31). Both of them showed with a great improvement with statistically significant (P Conclusion: The project could achieve the aims (i)&(ii).