{"title":"印度尼西亚Sajingan Besar Sei Bening村公共和行政负荷分布式混合光伏-发电机-电池系统的研究与设计","authors":"Naftalin Winanti, A. Purwadi","doi":"10.1109/ICGEA.2018.8356300","DOIUrl":null,"url":null,"abstract":"Indonesia consist of 16.056 islands and the area is 1905 million. Due to the vast number of island and region, the value of electrification ratio of Indonesia is uneven, some region has a ratio below than 50%. Not only electrification ratio, electricity demand in Indonesia also increase around 5.5% every year. Some obstacles in improving electricity in Indonesia are related to energy infrastructure. Prioritize border and rural area by using renewable energy source is one of the governments attempt to solve the electrification problem. For the last 10 years, the used of renewable energy as an energy source has increased around 4.7% in average, in 2016 has increased 7.1 %, but the used of solar as an energy source only reached 1%. The home distribution pattern in border and rural area is spread around the area. Due to that distribution pattern, the right design of power plant should design well. This study will show that hybrid distributed system is more suitable and applicable for border area, in this case, is Sei Bening, the cost is lower than the centralized system and each module able to backup each other.","PeriodicalId":6536,"journal":{"name":"2018 2nd International Conference on Green Energy and Applications (ICGEA)","volume":"13 1","pages":"129-133"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Study and Design of Distributed Hybrid PV-Generator-Battery System for Communal and Administrative Loadat Sei Bening Village, Sajingan Besar, Indonesia\",\"authors\":\"Naftalin Winanti, A. Purwadi\",\"doi\":\"10.1109/ICGEA.2018.8356300\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Indonesia consist of 16.056 islands and the area is 1905 million. Due to the vast number of island and region, the value of electrification ratio of Indonesia is uneven, some region has a ratio below than 50%. Not only electrification ratio, electricity demand in Indonesia also increase around 5.5% every year. Some obstacles in improving electricity in Indonesia are related to energy infrastructure. Prioritize border and rural area by using renewable energy source is one of the governments attempt to solve the electrification problem. For the last 10 years, the used of renewable energy as an energy source has increased around 4.7% in average, in 2016 has increased 7.1 %, but the used of solar as an energy source only reached 1%. The home distribution pattern in border and rural area is spread around the area. Due to that distribution pattern, the right design of power plant should design well. This study will show that hybrid distributed system is more suitable and applicable for border area, in this case, is Sei Bening, the cost is lower than the centralized system and each module able to backup each other.\",\"PeriodicalId\":6536,\"journal\":{\"name\":\"2018 2nd International Conference on Green Energy and Applications (ICGEA)\",\"volume\":\"13 1\",\"pages\":\"129-133\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 2nd International Conference on Green Energy and Applications (ICGEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICGEA.2018.8356300\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 2nd International Conference on Green Energy and Applications (ICGEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICGEA.2018.8356300","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study and Design of Distributed Hybrid PV-Generator-Battery System for Communal and Administrative Loadat Sei Bening Village, Sajingan Besar, Indonesia
Indonesia consist of 16.056 islands and the area is 1905 million. Due to the vast number of island and region, the value of electrification ratio of Indonesia is uneven, some region has a ratio below than 50%. Not only electrification ratio, electricity demand in Indonesia also increase around 5.5% every year. Some obstacles in improving electricity in Indonesia are related to energy infrastructure. Prioritize border and rural area by using renewable energy source is one of the governments attempt to solve the electrification problem. For the last 10 years, the used of renewable energy as an energy source has increased around 4.7% in average, in 2016 has increased 7.1 %, but the used of solar as an energy source only reached 1%. The home distribution pattern in border and rural area is spread around the area. Due to that distribution pattern, the right design of power plant should design well. This study will show that hybrid distributed system is more suitable and applicable for border area, in this case, is Sei Bening, the cost is lower than the centralized system and each module able to backup each other.