{"title":"地下评价和油田开发计划的集成可视化-支持发现后资本密集型投资决策的关键输入","authors":"H. Stigliano, I. Yemez, V. Singh","doi":"10.3997/2214-4609.201700481","DOIUrl":null,"url":null,"abstract":"After a field discovery, E&P companies spend billions of dollars every year for subsurface appraisal. Most often, the appraisal decision is difficult and tortuous, lacks transparency and objectivity, and the level of appraisal is less than optimal which affect the full cycle project economics. This paper is an effort to manage uncertainty through appraisal by quantifying its impact on the field development plan and overall project profitability. An integrated approach of selecting appraisal well location and their sequencing using standard discounted cash-flow analysis was adopted to calculate commercial value of a project in terms of an economic indicator considering different uncertain variables, their dependencies and correlation between them. To quantify the specific appraisal activity benefits, in terms of uncertainty reduction and its economic reward to the field development plan for an offshore clastic reservoir discovery, the Value of Information approach along with decision tree analysis was used and a comparison between different evaluated scenarios was made for an optimal appraisal selection. This method has helped prioritizing the appraisal locations including their sequencing, ensuring that appraisal plan adds value and allows management to understand the post discovery risks/opportunities for future investments.","PeriodicalId":14836,"journal":{"name":"Japan Geoscience Union","volume":"13 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Visualization of Subsurface Appraisal and Field Development Plan - A Key Input to Support Post Discovery Capital Intensive Investment Decisions\",\"authors\":\"H. Stigliano, I. Yemez, V. Singh\",\"doi\":\"10.3997/2214-4609.201700481\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After a field discovery, E&P companies spend billions of dollars every year for subsurface appraisal. Most often, the appraisal decision is difficult and tortuous, lacks transparency and objectivity, and the level of appraisal is less than optimal which affect the full cycle project economics. This paper is an effort to manage uncertainty through appraisal by quantifying its impact on the field development plan and overall project profitability. An integrated approach of selecting appraisal well location and their sequencing using standard discounted cash-flow analysis was adopted to calculate commercial value of a project in terms of an economic indicator considering different uncertain variables, their dependencies and correlation between them. To quantify the specific appraisal activity benefits, in terms of uncertainty reduction and its economic reward to the field development plan for an offshore clastic reservoir discovery, the Value of Information approach along with decision tree analysis was used and a comparison between different evaluated scenarios was made for an optimal appraisal selection. This method has helped prioritizing the appraisal locations including their sequencing, ensuring that appraisal plan adds value and allows management to understand the post discovery risks/opportunities for future investments.\",\"PeriodicalId\":14836,\"journal\":{\"name\":\"Japan Geoscience Union\",\"volume\":\"13 1\",\"pages\":\"1-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Japan Geoscience Union\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3997/2214-4609.201700481\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japan Geoscience Union","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201700481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

油田发现后,勘探开发公司每年花费数十亿美元进行地下评估。评价决策困难曲折,缺乏透明度和客观性,评价水平不够理想,影响了项目的全周期经济效益。本文通过量化不确定性对油田开发计划和整体项目盈利能力的影响来管理不确定性。综合考虑不同不确定变量、不确定变量之间的依赖关系和相关性,采用标准折现现金流分析选择评价井位和顺序的综合方法,根据经济指标计算项目的商业价值。为了量化海上碎屑储层发现的具体评价活动的效益,在减少不确定性及其对油田开发计划的经济回报方面,采用了信息价值法和决策树分析法,并对不同的评价方案进行了比较,以获得最优的评价选择。该方法有助于确定评估位置的优先级,包括其顺序,确保评估计划增加价值,并允许管理层了解发现后的风险/未来投资的机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Integrated Visualization of Subsurface Appraisal and Field Development Plan - A Key Input to Support Post Discovery Capital Intensive Investment Decisions
After a field discovery, E&P companies spend billions of dollars every year for subsurface appraisal. Most often, the appraisal decision is difficult and tortuous, lacks transparency and objectivity, and the level of appraisal is less than optimal which affect the full cycle project economics. This paper is an effort to manage uncertainty through appraisal by quantifying its impact on the field development plan and overall project profitability. An integrated approach of selecting appraisal well location and their sequencing using standard discounted cash-flow analysis was adopted to calculate commercial value of a project in terms of an economic indicator considering different uncertain variables, their dependencies and correlation between them. To quantify the specific appraisal activity benefits, in terms of uncertainty reduction and its economic reward to the field development plan for an offshore clastic reservoir discovery, the Value of Information approach along with decision tree analysis was used and a comparison between different evaluated scenarios was made for an optimal appraisal selection. This method has helped prioritizing the appraisal locations including their sequencing, ensuring that appraisal plan adds value and allows management to understand the post discovery risks/opportunities for future investments.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Tectonic Landform and Paleoseismic Activity of the Northernmost Sumatran Fault, Aceh Province, Indonesia Pressure-to-depth conversion models for metamorphic rocks: derivation and applications Standardized Variability Index (SVI): A multiscale index to assess the variability of precipitation Overpressured underthrust sediment in the Nankai Trough forearc inferred from high-frequency receiver function inversion Simple Topographic Parameter for Along-trench Friction Distribution of Shallow Megathrust Fault
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1