C. Gracios-Marin, Germán Ardul Muñoz Hernández, A. Díaz-Sánchez, H. Vázquez-Leal, E. Portilla-Flores, G. Saldaña-González
{"title":"基于软故障需求的混合发电系统建模智能诊断方案:一种FDI新策略","authors":"C. Gracios-Marin, Germán Ardul Muñoz Hernández, A. Díaz-Sánchez, H. Vázquez-Leal, E. Portilla-Flores, G. Saldaña-González","doi":"10.1109/ICEEE.2014.6978284","DOIUrl":null,"url":null,"abstract":"This article is a preliminary version of several improvements developed in last books and articles published by several authors in the actual theme of Scheduling for Hybrid Electrical Power Generation system. The hybrid system is implement using 1 aero-generator system, 1 stirling motor connected with 1 generator, one solar kit and a battery system bank to transfer the energy conversion a controlled load system. The principal contribution is to obtain the Intelligent Diagnosis Scheme using a Fault Detection and Isolation (F.D.I.) Architecture describe using a Computational Equipment. Matlab Environment where the algorithms were coded and linked using Labview with a N.I. DAQ presents the results obtained by the F.D.I. structure. The models are evaluated in normal function and in presence of faults to determine the relationship between them. The final application of this scheme is developed in the insertion of novel Efficient Energy structure in automotive architectures. The potential final user is to test banks for Audi Laboratory Centre.","PeriodicalId":6661,"journal":{"name":"2014 11th International Conference on Electrical Engineering, Computing Science and Automatic Control (CCE)","volume":"31 1","pages":"1-8"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Intelligent diagnosis scheme applied to model hybrid energy power generation system in presence of soft faults requirements: An FDI novel strategy\",\"authors\":\"C. Gracios-Marin, Germán Ardul Muñoz Hernández, A. Díaz-Sánchez, H. Vázquez-Leal, E. Portilla-Flores, G. Saldaña-González\",\"doi\":\"10.1109/ICEEE.2014.6978284\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article is a preliminary version of several improvements developed in last books and articles published by several authors in the actual theme of Scheduling for Hybrid Electrical Power Generation system. The hybrid system is implement using 1 aero-generator system, 1 stirling motor connected with 1 generator, one solar kit and a battery system bank to transfer the energy conversion a controlled load system. The principal contribution is to obtain the Intelligent Diagnosis Scheme using a Fault Detection and Isolation (F.D.I.) Architecture describe using a Computational Equipment. Matlab Environment where the algorithms were coded and linked using Labview with a N.I. DAQ presents the results obtained by the F.D.I. structure. The models are evaluated in normal function and in presence of faults to determine the relationship between them. The final application of this scheme is developed in the insertion of novel Efficient Energy structure in automotive architectures. The potential final user is to test banks for Audi Laboratory Centre.\",\"PeriodicalId\":6661,\"journal\":{\"name\":\"2014 11th International Conference on Electrical Engineering, Computing Science and Automatic Control (CCE)\",\"volume\":\"31 1\",\"pages\":\"1-8\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 11th International Conference on Electrical Engineering, Computing Science and Automatic Control (CCE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEEE.2014.6978284\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Electrical Engineering, Computing Science and Automatic Control (CCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEEE.2014.6978284","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Intelligent diagnosis scheme applied to model hybrid energy power generation system in presence of soft faults requirements: An FDI novel strategy
This article is a preliminary version of several improvements developed in last books and articles published by several authors in the actual theme of Scheduling for Hybrid Electrical Power Generation system. The hybrid system is implement using 1 aero-generator system, 1 stirling motor connected with 1 generator, one solar kit and a battery system bank to transfer the energy conversion a controlled load system. The principal contribution is to obtain the Intelligent Diagnosis Scheme using a Fault Detection and Isolation (F.D.I.) Architecture describe using a Computational Equipment. Matlab Environment where the algorithms were coded and linked using Labview with a N.I. DAQ presents the results obtained by the F.D.I. structure. The models are evaluated in normal function and in presence of faults to determine the relationship between them. The final application of this scheme is developed in the insertion of novel Efficient Energy structure in automotive architectures. The potential final user is to test banks for Audi Laboratory Centre.