JBCC主要建筑协议延期索赔的决策支持框架

IF 0.6 Q4 MANAGEMENT Acta Structilia Pub Date : 2017-02-02 DOI:10.18820/24150487/AS23I2.5
T. Maritz, H. Prinsloo
{"title":"JBCC主要建筑协议延期索赔的决策支持框架","authors":"T. Maritz, H. Prinsloo","doi":"10.18820/24150487/AS23I2.5","DOIUrl":null,"url":null,"abstract":"Delays to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. The assessment of extension of time (EOT) claims as part of a construction project can have far-reaching consequences for the financial success of the project. The proper and transparent assessment of EOT claims is, therefore, an essential component in the success of any project. In this article, an action-research approach, a very specific qualitative approach, was followed to develop a user-friendly guideline to help practitioners navigate this potential minefield of complexities in the process of the assessment of EOT claims. Focus groups, consisting of industry practitioners, with specialist knowledge in construction contracts, contributed to the development of the decision-support frameworks, and ultimately to the findings. The iterative process followed assisted in producing a tool that can be used in practice as a guideline for the analysis of EOT claims when using the Principal Building Agreement of the Joint Building Contracts Committee (JBCC).Die vertraging van die aannemer se vordering het dikwels ‘n negatiewe impak op tyd en koste en is ‘n groot bron van eise en geskille in die konstruksiebedryf. Die evaluering van eise vir die verlenging van tyd (VVT) kan tot verreikende nagevolge lei in verband met die finansiele sukses van ‘n projek. Die behoorlike en deursigtige evaluering van VVT-eise is dus ‘n noodsaaklike komponent in die sukses van enige projek. ‘n Aksie-navorsing benadering, ‘n baie spesifieke kwalitatiewe benadering, word gevolg in die artikel om ‘n gebruiker-vriendelike riglyn te ontwikkel om praktisyns te help om hierdie potensiele mynveld van kompleksiteit te navigeer in die proses van die evaluering van VVT-eise. Fokusgroepe, bestaande uit industriepraktisyns wat oor spesialiskennis in konstruksiekontrakte beskik, het bygedra tot die ontwikkeling van die besluit-ondersteuningsraamwerke en die bevindings. Die iteratiewe proses wat gevolg is het bygedra tot die ontwikkeling van ‘n instrument wat in die praktyk gebruik kan word om VVT-eise te ontleed wanneer gebruik gemaak word van die Hoofbouooreenkoms van die Gesamentlike Boukontraktekomitee (GBK).","PeriodicalId":42571,"journal":{"name":"Acta Structilia","volume":"9 1","pages":"109-146"},"PeriodicalIF":0.6000,"publicationDate":"2017-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"A decision support framework for extension of time claims for the JBCC Principal Building Agreement\",\"authors\":\"T. Maritz, H. Prinsloo\",\"doi\":\"10.18820/24150487/AS23I2.5\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Delays to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. The assessment of extension of time (EOT) claims as part of a construction project can have far-reaching consequences for the financial success of the project. The proper and transparent assessment of EOT claims is, therefore, an essential component in the success of any project. In this article, an action-research approach, a very specific qualitative approach, was followed to develop a user-friendly guideline to help practitioners navigate this potential minefield of complexities in the process of the assessment of EOT claims. Focus groups, consisting of industry practitioners, with specialist knowledge in construction contracts, contributed to the development of the decision-support frameworks, and ultimately to the findings. The iterative process followed assisted in producing a tool that can be used in practice as a guideline for the analysis of EOT claims when using the Principal Building Agreement of the Joint Building Contracts Committee (JBCC).Die vertraging van die aannemer se vordering het dikwels ‘n negatiewe impak op tyd en koste en is ‘n groot bron van eise en geskille in die konstruksiebedryf. Die evaluering van eise vir die verlenging van tyd (VVT) kan tot verreikende nagevolge lei in verband met die finansiele sukses van ‘n projek. Die behoorlike en deursigtige evaluering van VVT-eise is dus ‘n noodsaaklike komponent in die sukses van enige projek. ‘n Aksie-navorsing benadering, ‘n baie spesifieke kwalitatiewe benadering, word gevolg in die artikel om ‘n gebruiker-vriendelike riglyn te ontwikkel om praktisyns te help om hierdie potensiele mynveld van kompleksiteit te navigeer in die proses van die evaluering van VVT-eise. Fokusgroepe, bestaande uit industriepraktisyns wat oor spesialiskennis in konstruksiekontrakte beskik, het bygedra tot die ontwikkeling van die besluit-ondersteuningsraamwerke en die bevindings. Die iteratiewe proses wat gevolg is het bygedra tot die ontwikkeling van ‘n instrument wat in die praktyk gebruik kan word om VVT-eise te ontleed wanneer gebruik gemaak word van die Hoofbouooreenkoms van die Gesamentlike Boukontraktekomitee (GBK).\",\"PeriodicalId\":42571,\"journal\":{\"name\":\"Acta Structilia\",\"volume\":\"9 1\",\"pages\":\"109-146\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2017-02-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Acta Structilia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18820/24150487/AS23I2.5\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Structilia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18820/24150487/AS23I2.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 5

摘要

承包商进度的延误往往导致时间和成本超支,这是建筑行业索赔和纠纷的主要来源。作为建设项目的一部分,对延期索赔的评估对项目的财务成功具有深远的影响。因此,对EOT索赔进行适当和透明的评估是任何项目成功的重要组成部分。在本文中,我们采用了一种行动研究方法,一种非常具体的定性方法,开发了一种用户友好的指南,以帮助从业者在评估EOT索赔过程中导航这个潜在的复杂雷区。由具有建筑合同专业知识的行业从业人员组成的焦点小组为决策支持框架的发展做出了贡献,并最终促成了研究结果。随后的迭代过程有助于产生一种工具,该工具可以在实践中用作使用联合建筑合同委员会(JBCC)的主要建筑协议时分析EOT索赔的指导方针。在模具制造过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中,模具生产过程中。模具评估和模具挑战模型(VVT)在模具财务评估和模具项目中都是非常重要的。模具性能在模具设计中是一种评价模具性能的方法,在模具设计中是一种类似面条的部件。“在搜索搜索中”,我们有一些具体的例子,比如“知识搜索”、“文章搜索”中的“单词搜索”、“通用汽车搜索”中的“搜索”、“潜在搜索”中的“搜索”、“搜索”中的“搜索”、“搜索”中的“搜索”、“搜索”。Fokusgroepe,以工业实践为标准,在工业实践中具有丰富的经验,在工业实践中具有丰富的经验,在工业实践中具有丰富的经验和丰富的经验。模具迭代处理是由模具迭代处理的,模具迭代处理是由模具迭代处理的,模具迭代处理是由模具迭代处理的,模具迭代处理是由模具迭代处理的,模具迭代处理是由模具迭代处理的,模具迭代处理是由模具迭代处理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A decision support framework for extension of time claims for the JBCC Principal Building Agreement
Delays to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. The assessment of extension of time (EOT) claims as part of a construction project can have far-reaching consequences for the financial success of the project. The proper and transparent assessment of EOT claims is, therefore, an essential component in the success of any project. In this article, an action-research approach, a very specific qualitative approach, was followed to develop a user-friendly guideline to help practitioners navigate this potential minefield of complexities in the process of the assessment of EOT claims. Focus groups, consisting of industry practitioners, with specialist knowledge in construction contracts, contributed to the development of the decision-support frameworks, and ultimately to the findings. The iterative process followed assisted in producing a tool that can be used in practice as a guideline for the analysis of EOT claims when using the Principal Building Agreement of the Joint Building Contracts Committee (JBCC).Die vertraging van die aannemer se vordering het dikwels ‘n negatiewe impak op tyd en koste en is ‘n groot bron van eise en geskille in die konstruksiebedryf. Die evaluering van eise vir die verlenging van tyd (VVT) kan tot verreikende nagevolge lei in verband met die finansiele sukses van ‘n projek. Die behoorlike en deursigtige evaluering van VVT-eise is dus ‘n noodsaaklike komponent in die sukses van enige projek. ‘n Aksie-navorsing benadering, ‘n baie spesifieke kwalitatiewe benadering, word gevolg in die artikel om ‘n gebruiker-vriendelike riglyn te ontwikkel om praktisyns te help om hierdie potensiele mynveld van kompleksiteit te navigeer in die proses van die evaluering van VVT-eise. Fokusgroepe, bestaande uit industriepraktisyns wat oor spesialiskennis in konstruksiekontrakte beskik, het bygedra tot die ontwikkeling van die besluit-ondersteuningsraamwerke en die bevindings. Die iteratiewe proses wat gevolg is het bygedra tot die ontwikkeling van ‘n instrument wat in die praktyk gebruik kan word om VVT-eise te ontleed wanneer gebruik gemaak word van die Hoofbouooreenkoms van die Gesamentlike Boukontraktekomitee (GBK).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Acta Structilia
Acta Structilia MANAGEMENT-
自引率
14.30%
发文量
0
审稿时长
18 weeks
期刊最新文献
Optimisation of labour-intensive productivity for construction projects in Ghana Labour productivity in construction SMEs: Perspectives from South Africa Predictors of corruption among town planners: A Nigerian case study Impact of urban renewal changes on urban landscape identity: Case study of Kisumu City, Kenya A conceptual quality improvement protocol for Free State public works projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1