{"title":"不完全信息条件下考虑承包商信用水平的供水咨询工程质量保证金确定方法","authors":"Xiangtian Nie, Zihan Chen, Min Li, Bo Wang","doi":"10.5004/dwt.2023.29435","DOIUrl":null,"url":null,"abstract":"This paper studies the quality monitoring decision-making and quality guarantee deposit withhold- ing strategy of the owner in the construction supply chain composed of the owner and the contractor in the engineering construction project under different information environments. Taking the qual- ity monitoring level and quality guarantee deposit retention as the owner’s decision variables and the credit level as the contractor’s decision variables, when the owner’s quality monitoring cost and the contractor’s credit are non-concave and non-convex functions, the optimal solution of the owner’s quality monitoring decision and quality guarantee deposit retention strategy under symmetric information, asymmetric information and incomplete information are deduced by using the maximum principle. Through simulation calculation, the decision results under different information conditions are analyzed. It helps to improve the effectiveness and reliability of the owner’s quality monitoring and realize the expected quality control objectives and quality benefits.","PeriodicalId":11260,"journal":{"name":"Desalination and Water Treatment","volume":"49 1","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A determining method of the water consultancy project quality guarantee deposit considering the contractor's credit level under the incomplete information condition\",\"authors\":\"Xiangtian Nie, Zihan Chen, Min Li, Bo Wang\",\"doi\":\"10.5004/dwt.2023.29435\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies the quality monitoring decision-making and quality guarantee deposit withhold- ing strategy of the owner in the construction supply chain composed of the owner and the contractor in the engineering construction project under different information environments. Taking the qual- ity monitoring level and quality guarantee deposit retention as the owner’s decision variables and the credit level as the contractor’s decision variables, when the owner’s quality monitoring cost and the contractor’s credit are non-concave and non-convex functions, the optimal solution of the owner’s quality monitoring decision and quality guarantee deposit retention strategy under symmetric information, asymmetric information and incomplete information are deduced by using the maximum principle. Through simulation calculation, the decision results under different information conditions are analyzed. It helps to improve the effectiveness and reliability of the owner’s quality monitoring and realize the expected quality control objectives and quality benefits.\",\"PeriodicalId\":11260,\"journal\":{\"name\":\"Desalination and Water Treatment\",\"volume\":\"49 1\",\"pages\":\"\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Desalination and Water Treatment\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5004/dwt.2023.29435\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CHEMICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Desalination and Water Treatment","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5004/dwt.2023.29435","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CHEMICAL","Score":null,"Total":0}
A determining method of the water consultancy project quality guarantee deposit considering the contractor's credit level under the incomplete information condition
This paper studies the quality monitoring decision-making and quality guarantee deposit withhold- ing strategy of the owner in the construction supply chain composed of the owner and the contractor in the engineering construction project under different information environments. Taking the qual- ity monitoring level and quality guarantee deposit retention as the owner’s decision variables and the credit level as the contractor’s decision variables, when the owner’s quality monitoring cost and the contractor’s credit are non-concave and non-convex functions, the optimal solution of the owner’s quality monitoring decision and quality guarantee deposit retention strategy under symmetric information, asymmetric information and incomplete information are deduced by using the maximum principle. Through simulation calculation, the decision results under different information conditions are analyzed. It helps to improve the effectiveness and reliability of the owner’s quality monitoring and realize the expected quality control objectives and quality benefits.
期刊介绍:
The journal is dedicated to research and application of desalination technology, environment and energy considerations, integrated water management, water reuse, wastewater and related topics.