滑套与桥塞相结合的复合完井增产技术:鄂尔多斯盆地实例

Zheng Tong, Bing Ma, Ran Wei, Chenglong Liao, Shun Liu, Peng Huang, Xinzhong Wang
{"title":"滑套与桥塞相结合的复合完井增产技术:鄂尔多斯盆地实例","authors":"Zheng Tong, Bing Ma, Ran Wei, Chenglong Liao, Shun Liu, Peng Huang, Xinzhong Wang","doi":"10.2118/191945-MS","DOIUrl":null,"url":null,"abstract":"\n Operator planned to develop the new low-permeable sandstone gas reservoir below the mature gas layer in Ordos basin. In terms of cost reduction the wellbore was designed to pass through the undeveloped resource locating in the upper mature reservoir to obtain dual-zone commingled production. According to the well logging, there was the indication of hole collapse, enlargement and an unforseen water bearing zone found in the deviated section locating in upper zone. Packers could fail in the irregular deviated wellbore.\n Upon the modification of completion solution, the 4 1/2in open-hole packer-sleeve (OHPS) completion and fracturing system was deployed to treat the lower target zone. Top cementing operation using novel stage collar with swellable elements was performed to isolate the upper mature zone. \"Plug and Perf\" (PnP) via compact bridge plugs was carried out to enable efficient fracturing in deviated wellbore. The single-trip OHPS system employed water-swellable packers (WSPs) with corrugated packing element.\n The WSP and compact bridge plug were successfully evaluated by bench test. In one gas well, the operator performed cementing job and the stage collar was opened by wiper plug once the tripping of the OHPS completion with five packers was made successfully. Three bridge plugs were pumped down to the target depth. Hydraulic fracturing operation was sequentially made with all packers and bridge plugs effectively set. It is shown from the field operation that the hybrid completion is able to meet the requirements of completion and stimulation in irregular wellbore with abnormal conditions for tight reservoirs.","PeriodicalId":11182,"journal":{"name":"Day 3 Thu, October 25, 2018","volume":"121 19 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Hybrid Completion and Stimulation Technology Combining Sleeves with Bridge Plugs: A Case History in Ordos Basin, China\",\"authors\":\"Zheng Tong, Bing Ma, Ran Wei, Chenglong Liao, Shun Liu, Peng Huang, Xinzhong Wang\",\"doi\":\"10.2118/191945-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Operator planned to develop the new low-permeable sandstone gas reservoir below the mature gas layer in Ordos basin. In terms of cost reduction the wellbore was designed to pass through the undeveloped resource locating in the upper mature reservoir to obtain dual-zone commingled production. According to the well logging, there was the indication of hole collapse, enlargement and an unforseen water bearing zone found in the deviated section locating in upper zone. Packers could fail in the irregular deviated wellbore.\\n Upon the modification of completion solution, the 4 1/2in open-hole packer-sleeve (OHPS) completion and fracturing system was deployed to treat the lower target zone. Top cementing operation using novel stage collar with swellable elements was performed to isolate the upper mature zone. \\\"Plug and Perf\\\" (PnP) via compact bridge plugs was carried out to enable efficient fracturing in deviated wellbore. The single-trip OHPS system employed water-swellable packers (WSPs) with corrugated packing element.\\n The WSP and compact bridge plug were successfully evaluated by bench test. In one gas well, the operator performed cementing job and the stage collar was opened by wiper plug once the tripping of the OHPS completion with five packers was made successfully. Three bridge plugs were pumped down to the target depth. Hydraulic fracturing operation was sequentially made with all packers and bridge plugs effectively set. It is shown from the field operation that the hybrid completion is able to meet the requirements of completion and stimulation in irregular wellbore with abnormal conditions for tight reservoirs.\",\"PeriodicalId\":11182,\"journal\":{\"name\":\"Day 3 Thu, October 25, 2018\",\"volume\":\"121 19 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, October 25, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191945-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 25, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191945-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

作业者计划在鄂尔多斯盆地成熟气层下方开发新的低渗透砂岩气藏。为了降低成本,井眼被设计为穿过位于上成熟油藏的未开发资源,以获得双层混采。根据测井资料,在上段的斜井段发现了井眼塌陷、扩大的迹象,并发现了未预见的含水带。封隔器可能在不规则斜度井中失效。在对完井方案进行修改后,使用了4 1/2in裸眼封隔器滑套(OHPS)完井和压裂系统来处理下部目标层。采用新型带膨胀元件的分段接箍进行上部固井作业,以隔离上部成熟层。通过紧凑型桥塞进行“桥塞射孔”(PnP),可在斜井中实现高效压裂。单趟OHPS系统采用了带波纹填料元件的遇水膨胀封隔器(WSPs)。通过台架试验,成功地对WSP和紧凑型桥塞进行了评价。在一口气井中,作业者进行了固井作业,在使用5个封隔器的OHPS完井起下钻成功后,通过刮塞打开了一级接箍。将三个桥塞泵入目标深度。随后进行水力压裂作业,所有封隔器和桥塞都有效坐封。现场运行表明,混合完井能够满足致密储层不规则井眼、异常条件下的完井增产要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Hybrid Completion and Stimulation Technology Combining Sleeves with Bridge Plugs: A Case History in Ordos Basin, China
Operator planned to develop the new low-permeable sandstone gas reservoir below the mature gas layer in Ordos basin. In terms of cost reduction the wellbore was designed to pass through the undeveloped resource locating in the upper mature reservoir to obtain dual-zone commingled production. According to the well logging, there was the indication of hole collapse, enlargement and an unforseen water bearing zone found in the deviated section locating in upper zone. Packers could fail in the irregular deviated wellbore. Upon the modification of completion solution, the 4 1/2in open-hole packer-sleeve (OHPS) completion and fracturing system was deployed to treat the lower target zone. Top cementing operation using novel stage collar with swellable elements was performed to isolate the upper mature zone. "Plug and Perf" (PnP) via compact bridge plugs was carried out to enable efficient fracturing in deviated wellbore. The single-trip OHPS system employed water-swellable packers (WSPs) with corrugated packing element. The WSP and compact bridge plug were successfully evaluated by bench test. In one gas well, the operator performed cementing job and the stage collar was opened by wiper plug once the tripping of the OHPS completion with five packers was made successfully. Three bridge plugs were pumped down to the target depth. Hydraulic fracturing operation was sequentially made with all packers and bridge plugs effectively set. It is shown from the field operation that the hybrid completion is able to meet the requirements of completion and stimulation in irregular wellbore with abnormal conditions for tight reservoirs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Discrete Net-to-Gross Truncated Gaussian Simulation: An Alternative Modelling Approach for CSG Unconventional Reservoirs, Bowen Basin, Eastern Australia Where the Laterals Go? A Feasible Way for the Trajectory Measurement of Radial Jet Drilling Wells Embracing Opportunities and Avoiding Pitfalls of Probabilistic Modelling in Field Development Planning Efficient Integration Method of Large-Scale Reservoir Compaction and Small-Scale Casing Stability Models for Oilfield Casing Failure Analysis Monitoring Water Flood Front Movement by Propagating High Frequency Pulses Through Subsurface Transmission Lines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1