Mahyar Alimian, V. Ghezavati, R. Tavakkoli-Moghaddam, R. Ramezanian
{"title":"用滚动水平法求解具有序列依赖的安装时间/成本和预防性维护的并行生产线容量批量和调度问题","authors":"Mahyar Alimian, V. Ghezavati, R. Tavakkoli-Moghaddam, R. Ramezanian","doi":"10.1016/j.cie.2022.108041","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":10663,"journal":{"name":"Comput. Ind. Eng.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method\",\"authors\":\"Mahyar Alimian, V. Ghezavati, R. Tavakkoli-Moghaddam, R. Ramezanian\",\"doi\":\"10.1016/j.cie.2022.108041\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":10663,\"journal\":{\"name\":\"Comput. Ind. Eng.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Comput. Ind. Eng.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/j.cie.2022.108041\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Comput. Ind. Eng.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/j.cie.2022.108041","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method