{"title":"从基础工程到升级:巴西调试的新成功执行方法","authors":"Paulino Bruno Santos, Teixeira Junior, Leonardo de Souza Nogueira, V. João, Simas G Milton Torres, Leonardo De Menezes Costa","doi":"10.4043/31089-ms","DOIUrl":null,"url":null,"abstract":"\n In the last three years, COMPANY has started the production of eight Surface Production Systems (Floating, Production, Storage and Offloading Units) in the Búzios and Lula fields of the Brazilian pre-salt that have generated technical knowledge, organizational learning and many opportunities to explore in upcoming projects. The lessons learned as well as the organizational knowledge acquired in this period, resulted in a new approach for the commissioning process to apply in COMPANY's coming FPSO projects.\n During this period, COMPANY identified improvement opportunities and stablished structuring programs focused on adding value to these new assets. The main opportunity identified was to reduce the period required for ramping-up the oil production, considering aggressive target dates for start-up, with high up time on the gas compression systems with minimum flaring.\n In this manuscript, will be described some of the important actions and changes made in commissioning process that allowed COMPANY to achieve better efficiency and safety in ramp up of new FPSOs in Brazilian pre salt fields.","PeriodicalId":11072,"journal":{"name":"Day 1 Mon, August 16, 2021","volume":"70 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"From Basic Engineering to Ramp-Up: The New Successful Execution Approach for Commissioning in Brazil\",\"authors\":\"Paulino Bruno Santos, Teixeira Junior, Leonardo de Souza Nogueira, V. João, Simas G Milton Torres, Leonardo De Menezes Costa\",\"doi\":\"10.4043/31089-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In the last three years, COMPANY has started the production of eight Surface Production Systems (Floating, Production, Storage and Offloading Units) in the Búzios and Lula fields of the Brazilian pre-salt that have generated technical knowledge, organizational learning and many opportunities to explore in upcoming projects. The lessons learned as well as the organizational knowledge acquired in this period, resulted in a new approach for the commissioning process to apply in COMPANY's coming FPSO projects.\\n During this period, COMPANY identified improvement opportunities and stablished structuring programs focused on adding value to these new assets. The main opportunity identified was to reduce the period required for ramping-up the oil production, considering aggressive target dates for start-up, with high up time on the gas compression systems with minimum flaring.\\n In this manuscript, will be described some of the important actions and changes made in commissioning process that allowed COMPANY to achieve better efficiency and safety in ramp up of new FPSOs in Brazilian pre salt fields.\",\"PeriodicalId\":11072,\"journal\":{\"name\":\"Day 1 Mon, August 16, 2021\",\"volume\":\"70 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, August 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31089-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, August 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31089-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在过去的三年中,公司已经在巴西盐下Búzios和Lula油田启动了八个地面生产系统(浮式、生产、储存和卸载装置)的生产,这些系统产生了技术知识、组织学习和许多机会,可以在即将到来的项目中进行探索。在此期间获得的经验教训以及组织知识,为公司未来的FPSO项目提供了一种新的调试过程方法。在此期间,公司确定了改进机会,并建立了专注于增加这些新资产价值的结构计划。考虑到积极的启动目标日期,以及天然气压缩系统的高启动时间和最小的燃除,确定的主要机会是缩短提高石油产量所需的时间。在本文中,将描述在调试过程中所做的一些重要行动和变化,这些行动和变化使公司能够在巴西盐下油田的新fpso增加中实现更高的效率和安全性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
From Basic Engineering to Ramp-Up: The New Successful Execution Approach for Commissioning in Brazil
In the last three years, COMPANY has started the production of eight Surface Production Systems (Floating, Production, Storage and Offloading Units) in the Búzios and Lula fields of the Brazilian pre-salt that have generated technical knowledge, organizational learning and many opportunities to explore in upcoming projects. The lessons learned as well as the organizational knowledge acquired in this period, resulted in a new approach for the commissioning process to apply in COMPANY's coming FPSO projects. During this period, COMPANY identified improvement opportunities and stablished structuring programs focused on adding value to these new assets. The main opportunity identified was to reduce the period required for ramping-up the oil production, considering aggressive target dates for start-up, with high up time on the gas compression systems with minimum flaring. In this manuscript, will be described some of the important actions and changes made in commissioning process that allowed COMPANY to achieve better efficiency and safety in ramp up of new FPSOs in Brazilian pre salt fields.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Drilling Fluids Project Engineering Guidance and Most Common Fluids Related Challenges for Deepwater and HPHT Offshore Wells Empirical Design of Optimum Frequency of Well Testing for Deepwater Operation Sustaining Oil and Gas Fields by Using Multiphase Gas Compression to Increase Production and Reserves, and Lower Operating Costs and Environmental Emissions Footprint Structural Digital Twin of FPSO for Monitoring the Hull and Topsides Based on Inspection Data and Load Measurement Application of LWD Multipole Sonic for Quantitative Cement Evaluation – Well Integrity in the Norwegian Continental Shelf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1