D.G.W. Frost, J.W. Weaver
{"title":"多国施工队","authors":"D.G.W. Frost,&nbsp;J.W. Weaver","doi":"10.1016/0377-841X(79)90011-1","DOIUrl":null,"url":null,"abstract":"<div><p>While U.K. and European based process plant construction contractors still tend to make their initial assessment of the site manpower requirements for a project in terms of the performance of their own nationals, increasingly the actual construction team will be recruited on a multi-national basis.</p><p>The general spread of categories of skills required for a project are suggested and the availability of local labour in areas of high construction activity is examined to show that it rarely can match the requirements without supplementation from outside the work area with essentially “expatriate” labour.</p><p>Areas of recruitment are examined together with mention of some of the problems associated with the host country's entry, exit and work permit requirements. The overall management of the multi-national team on site is suggested as normally no more difficult than one recruited from one country.</p><p>Although the economic justification may be marginal the authors conclude that the stability engendered on a large site by minimising the incidence of major labour disruption and possibly making the whole operation more acceptable to the host country, is increasingly sufficient reason for recruiting large construction teams on a multi-national basis.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1979-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90011-1","citationCount":"0","resultStr":"{\"title\":\"Multi-national construction teams\",\"authors\":\"D.G.W. Frost,&nbsp;J.W. Weaver\",\"doi\":\"10.1016/0377-841X(79)90011-1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>While U.K. and European based process plant construction contractors still tend to make their initial assessment of the site manpower requirements for a project in terms of the performance of their own nationals, increasingly the actual construction team will be recruited on a multi-national basis.</p><p>The general spread of categories of skills required for a project are suggested and the availability of local labour in areas of high construction activity is examined to show that it rarely can match the requirements without supplementation from outside the work area with essentially “expatriate” labour.</p><p>Areas of recruitment are examined together with mention of some of the problems associated with the host country's entry, exit and work permit requirements. The overall management of the multi-national team on site is suggested as normally no more difficult than one recruited from one country.</p><p>Although the economic justification may be marginal the authors conclude that the stability engendered on a large site by minimising the incidence of major labour disruption and possibly making the whole operation more acceptable to the host country, is increasingly sufficient reason for recruiting large construction teams on a multi-national basis.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(79)90011-1\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X79900111\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X79900111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

虽然英国和欧洲的工艺工厂建设承包商仍然倾向于根据本国国民的表现对项目的现场人力需求进行初步评估,但越来越多的实际施工团队将在多国基础上招聘。建议了一个项目所需技能类别的一般分布情况,并审查了建筑活动频繁地区当地劳工的供应情况,结果表明,如果不从工作地区以外补充基本上是“外派”劳工,很少能满足需要。审查征聘领域,同时提到与东道国入境、出境和工作许可证要求有关的一些问题。建议在现场对多国工作队进行全面管理,通常不会比从一个国家征聘的工作队更困难。虽然经济上的理由可能是不充分的,但作者的结论是,通过尽量减少重大劳工中断的发生率和可能使东道国更容易接受整个作业而在大型工地上产生的稳定性日益成为在多国基础上征聘大型建筑队的充分理由。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Multi-national construction teams

While U.K. and European based process plant construction contractors still tend to make their initial assessment of the site manpower requirements for a project in terms of the performance of their own nationals, increasingly the actual construction team will be recruited on a multi-national basis.

The general spread of categories of skills required for a project are suggested and the availability of local labour in areas of high construction activity is examined to show that it rarely can match the requirements without supplementation from outside the work area with essentially “expatriate” labour.

Areas of recruitment are examined together with mention of some of the problems associated with the host country's entry, exit and work permit requirements. The overall management of the multi-national team on site is suggested as normally no more difficult than one recruited from one country.

Although the economic justification may be marginal the authors conclude that the stability engendered on a large site by minimising the incidence of major labour disruption and possibly making the whole operation more acceptable to the host country, is increasingly sufficient reason for recruiting large construction teams on a multi-national basis.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Models for present-worth analysis of selected industrial cash flow patterns Measurement of technology progress and capital cost for nuclear, coal-fired, and gas-fired power plants using the learning curve Modelling capital expenditure Editorial note
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1