{"title":"管理不确定性,交付复杂的开发井","authors":"Peter J. van Ruth, M. Agarwal, Scott Gagen","doi":"10.1080/22020586.2019.12073106","DOIUrl":null,"url":null,"abstract":"Summary Managing seismic depth uncertainty is a key consideration in placing horizontal development wells into thin reservoir targets. Seismic depth uncertainty has the potential to erode project value through missed reservoir (late landing or reservoir exits) and/or the cost of corrective actions (e.g. sidetracks). The placement of Laverda Canyon development wells in 2018 utilised a 30 Hz full waveform inversion velocity model and deep directional resistivity data in combination with a near real-time depth update process to optimise well placement. Utilising these methods resulted in a significant reduction in seismic depth uncertainty which culminated in the final Laverda Canyon development well (LAV04WI) being successfully geosteered for ~ 2,200 m within a 10-15 m thick reservoir with only one reservoir exit.","PeriodicalId":8502,"journal":{"name":"ASEG Extended Abstracts","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Managing uncertainty to deliver complex development wells\",\"authors\":\"Peter J. van Ruth, M. Agarwal, Scott Gagen\",\"doi\":\"10.1080/22020586.2019.12073106\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary Managing seismic depth uncertainty is a key consideration in placing horizontal development wells into thin reservoir targets. Seismic depth uncertainty has the potential to erode project value through missed reservoir (late landing or reservoir exits) and/or the cost of corrective actions (e.g. sidetracks). The placement of Laverda Canyon development wells in 2018 utilised a 30 Hz full waveform inversion velocity model and deep directional resistivity data in combination with a near real-time depth update process to optimise well placement. Utilising these methods resulted in a significant reduction in seismic depth uncertainty which culminated in the final Laverda Canyon development well (LAV04WI) being successfully geosteered for ~ 2,200 m within a 10-15 m thick reservoir with only one reservoir exit.\",\"PeriodicalId\":8502,\"journal\":{\"name\":\"ASEG Extended Abstracts\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASEG Extended Abstracts\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/22020586.2019.12073106\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEG Extended Abstracts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/22020586.2019.12073106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Managing uncertainty to deliver complex development wells
Summary Managing seismic depth uncertainty is a key consideration in placing horizontal development wells into thin reservoir targets. Seismic depth uncertainty has the potential to erode project value through missed reservoir (late landing or reservoir exits) and/or the cost of corrective actions (e.g. sidetracks). The placement of Laverda Canyon development wells in 2018 utilised a 30 Hz full waveform inversion velocity model and deep directional resistivity data in combination with a near real-time depth update process to optimise well placement. Utilising these methods resulted in a significant reduction in seismic depth uncertainty which culminated in the final Laverda Canyon development well (LAV04WI) being successfully geosteered for ~ 2,200 m within a 10-15 m thick reservoir with only one reservoir exit.