基于bsamizier曲线平滑和可修复性辨识的定时ECO优化

Hua-Yu Chang, I. Jiang, Yao-Wen Chang
{"title":"基于bsamizier曲线平滑和可修复性辨识的定时ECO优化","authors":"Hua-Yu Chang, I. Jiang, Yao-Wen Chang","doi":"10.1109/ICCAD.2011.6105412","DOIUrl":null,"url":null,"abstract":"Due to the rapidly increasing design complexity in modern IC design, more and more timing failures are detected at late stages. Without deferring time-to-market, metal-only ECO is an economical technique to correct these late-found failures. Typically, a design undergoes many ECO runs in design houses; the usage of spare cells is of significant importance. Hence, in this paper, we aim at timing ECO using the least number of spare cells. We observe that a path with good timing is desired to be geometrically smooth. Different from negative slack and gate delay used in most of prior work, we propose a new metric of timing criticality — fixability — considering the smoothness of critical paths. To measure the smoothness of a path, we use Bézier curve as the golden path. Furthermore, in order to concurrently fix timing violations, we derive the dominance property to divide violated paths into independent segments. Based on Bézier curve smoothing, fixability identification, and the dominance property, we develop an efficient algorithm to fix violations. Compared with the state-of-the-art works, experimental results show that our algorithm not only effectively resolves all timing violations with few spare cells but also achieves 22.8X and 42.6X speedups.","PeriodicalId":6357,"journal":{"name":"2011 IEEE/ACM International Conference on Computer-Aided Design (ICCAD)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2011-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Timing ECO optimization via Bézier curve smoothing and fixability identification\",\"authors\":\"Hua-Yu Chang, I. Jiang, Yao-Wen Chang\",\"doi\":\"10.1109/ICCAD.2011.6105412\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the rapidly increasing design complexity in modern IC design, more and more timing failures are detected at late stages. Without deferring time-to-market, metal-only ECO is an economical technique to correct these late-found failures. Typically, a design undergoes many ECO runs in design houses; the usage of spare cells is of significant importance. Hence, in this paper, we aim at timing ECO using the least number of spare cells. We observe that a path with good timing is desired to be geometrically smooth. Different from negative slack and gate delay used in most of prior work, we propose a new metric of timing criticality — fixability — considering the smoothness of critical paths. To measure the smoothness of a path, we use Bézier curve as the golden path. Furthermore, in order to concurrently fix timing violations, we derive the dominance property to divide violated paths into independent segments. Based on Bézier curve smoothing, fixability identification, and the dominance property, we develop an efficient algorithm to fix violations. Compared with the state-of-the-art works, experimental results show that our algorithm not only effectively resolves all timing violations with few spare cells but also achieves 22.8X and 42.6X speedups.\",\"PeriodicalId\":6357,\"journal\":{\"name\":\"2011 IEEE/ACM International Conference on Computer-Aided Design (ICCAD)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-11-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE/ACM International Conference on Computer-Aided Design (ICCAD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCAD.2011.6105412\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE/ACM International Conference on Computer-Aided Design (ICCAD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCAD.2011.6105412","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在现代集成电路设计中,由于设计复杂性的迅速增加,越来越多的定时故障在后期被检测到。在不延迟上市时间的情况下,纯金属ECO是一种经济的技术,可以纠正这些后期发现的故障。通常情况下,一个设计会在设计公司进行多次ECO运行;备用电池的使用非常重要。因此,在本文中,我们的目标是使用最少数量的备用电池来定时ECO。我们观察到,具有良好时序的路径在几何上是光滑的。与以往工作中使用的负松弛和门延迟不同,我们提出了一种新的时间临界性度量-可修复性-考虑关键路径的平滑性。为了测量路径的平滑度,我们使用bsamizier曲线作为黄金路径。在此基础上,导出了将违规路径划分为独立段的优势性,从而实现了对违规路径的并行修复。基于bsamizier曲线平滑、可修复性识别和优势性,提出了一种有效的违规修复算法。实验结果表明,与现有算法相比,该算法不仅有效地解决了所有的时间违规问题,而且备用单元较少,速度提高了22.8倍和42.6倍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Timing ECO optimization via Bézier curve smoothing and fixability identification
Due to the rapidly increasing design complexity in modern IC design, more and more timing failures are detected at late stages. Without deferring time-to-market, metal-only ECO is an economical technique to correct these late-found failures. Typically, a design undergoes many ECO runs in design houses; the usage of spare cells is of significant importance. Hence, in this paper, we aim at timing ECO using the least number of spare cells. We observe that a path with good timing is desired to be geometrically smooth. Different from negative slack and gate delay used in most of prior work, we propose a new metric of timing criticality — fixability — considering the smoothness of critical paths. To measure the smoothness of a path, we use Bézier curve as the golden path. Furthermore, in order to concurrently fix timing violations, we derive the dominance property to divide violated paths into independent segments. Based on Bézier curve smoothing, fixability identification, and the dominance property, we develop an efficient algorithm to fix violations. Compared with the state-of-the-art works, experimental results show that our algorithm not only effectively resolves all timing violations with few spare cells but also achieves 22.8X and 42.6X speedups.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A framework for accelerating neuromorphic-vision algorithms on FPGAs Alternative design methodologies for the next generation logic switch Property-specific sequential invariant extraction for SAT-based unbounded model checking A corner stitching compliant B∗-tree representation and its applications to analog placement Heterogeneous B∗-trees for analog placement with symmetry and regularity considerations
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1