{"title":"影响巴勒斯坦建筑业投标/不投标决策的关键因素","authors":"I. Mahamid","doi":"10.48084/etasr.4538","DOIUrl":null,"url":null,"abstract":"The purpose of this study is to identify and rank the factors influencing the bid/no-bid decision according to their relative importance from the perspective of the contractors in the West Bank in Palestine. To achieve the study objectives, a questionnaire survey was conducted. The survey covered a randomly selected sample of 64 contractors involved in the construction industry in the West Bank. The questionnaire’s structure is based on the related literature, the pilot study, and the feedback from local experts in the construction industry. A total of 32 factors that might influence the bid/no-bid decision were identified and considered. Then, the targeted population was asked to rank these factors according to their relative importance. The results indicate that the top five factors affecting a contractor’s decision to bid or not include the financial stability of the client, the identity and reputation of the client in the industry, the promptness of the client in the payment process, the expected profitability, and the project’s source of funding. On the other hand, the least affecting factors are the type of the project, client’s requirements, taxes, laws and government regulations, and weather conditions. The paper provides a comprehensive understanding of the factors affecting the bidding decision. Construction parties and researchers could benefit from the results of this study.","PeriodicalId":11826,"journal":{"name":"Engineering, Technology & Applied Science Research","volume":"8 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Critical Factors Influencing the Bid / No-Bid Decision in the Palestinian Construction Industry\",\"authors\":\"I. Mahamid\",\"doi\":\"10.48084/etasr.4538\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this study is to identify and rank the factors influencing the bid/no-bid decision according to their relative importance from the perspective of the contractors in the West Bank in Palestine. To achieve the study objectives, a questionnaire survey was conducted. The survey covered a randomly selected sample of 64 contractors involved in the construction industry in the West Bank. The questionnaire’s structure is based on the related literature, the pilot study, and the feedback from local experts in the construction industry. A total of 32 factors that might influence the bid/no-bid decision were identified and considered. Then, the targeted population was asked to rank these factors according to their relative importance. The results indicate that the top five factors affecting a contractor’s decision to bid or not include the financial stability of the client, the identity and reputation of the client in the industry, the promptness of the client in the payment process, the expected profitability, and the project’s source of funding. On the other hand, the least affecting factors are the type of the project, client’s requirements, taxes, laws and government regulations, and weather conditions. The paper provides a comprehensive understanding of the factors affecting the bidding decision. Construction parties and researchers could benefit from the results of this study.\",\"PeriodicalId\":11826,\"journal\":{\"name\":\"Engineering, Technology & Applied Science Research\",\"volume\":\"8 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2022-02-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering, Technology & Applied Science Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.48084/etasr.4538\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"0\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering, Technology & Applied Science Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.48084/etasr.4538","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是从巴勒斯坦西岸承包商的角度,根据其相对重要性确定影响投标/不投标决策的因素并对其进行排序。为了达到研究目的,我们进行了问卷调查。调查对象是在西岸从事建筑业的64名承包商中随机抽取的样本。问卷的结构是基于相关文献,试点研究和当地建筑行业专家的反馈。确定并考虑了可能影响投标/不投标决定的总共32个因素。然后,要求目标人群根据这些因素的相对重要性对它们进行排序。结果表明,影响承包商投标决策的前五大因素包括:客户的财务稳定性、客户在行业中的身份和声誉、客户在付款过程中的及时性、预期盈利能力和项目的资金来源。另一方面,影响最小的因素是项目的类型、客户的要求、税收、法律和政府法规、天气条件。本文对影响投标决策的因素有了全面的认识。建设方和研究人员可以从这项研究的结果中受益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Critical Factors Influencing the Bid / No-Bid Decision in the Palestinian Construction Industry
The purpose of this study is to identify and rank the factors influencing the bid/no-bid decision according to their relative importance from the perspective of the contractors in the West Bank in Palestine. To achieve the study objectives, a questionnaire survey was conducted. The survey covered a randomly selected sample of 64 contractors involved in the construction industry in the West Bank. The questionnaire’s structure is based on the related literature, the pilot study, and the feedback from local experts in the construction industry. A total of 32 factors that might influence the bid/no-bid decision were identified and considered. Then, the targeted population was asked to rank these factors according to their relative importance. The results indicate that the top five factors affecting a contractor’s decision to bid or not include the financial stability of the client, the identity and reputation of the client in the industry, the promptness of the client in the payment process, the expected profitability, and the project’s source of funding. On the other hand, the least affecting factors are the type of the project, client’s requirements, taxes, laws and government regulations, and weather conditions. The paper provides a comprehensive understanding of the factors affecting the bidding decision. Construction parties and researchers could benefit from the results of this study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering, Technology & Applied Science Research
Engineering, Technology & Applied Science Research ENGINEERING, MULTIDISCIPLINARY-
CiteScore
3.00
自引率
46.70%
发文量
222
审稿时长
11 weeks
期刊最新文献
Malware Attack Detection in Large Scale Networks using the Ensemble Deep Restricted Boltzmann Machine Enhancement of Power System Security by the Intelligent Control of a Static Synchronous Series Compensator Mix Design of Fly Ash and GGBS based Geopolymer Concrete activated with Water Glass A New Approach on the Egyptian Black Sand Ilmenite Alteration Processes Boric Acid as a Safe Insecticide for Controlling the Mediterranean Fruit Fly Ceratitis Capitata Wiedemann (Diptera: Tephritidae)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1