{"title":"阻碍加沙灾后住房重建资源的挑战","authors":"Nour Saleh, A. Enshassi, M. Sundermeier","doi":"10.21315/jcdc2021.26.2.9","DOIUrl":null,"url":null,"abstract":"Resourcing post-disaster housing reconstruction (PDHR) entails many drawbacks creating bottlenecks to reconstruction projects. Understanding these vulnerable issues is of utmost to identify the appropriate interventions to mitigate their effects. The devastating aggression in 2014 in Gaza Strip served as a typical example of resources hampers. Based on the quantitative approach, the research employed a self-administrated questionnaire survey to identify the most significant challenges hindering the resourcing for post-2014 aggression housing reconstruction. The questionnaire targeted 55 of the key people in the implementing agencies of post-2014 aggression housing reconstruction. The data collected was analysed using descriptive statistics, through frequency distribution and effect index (EI); and using inferential statistics through one sample Wilcoxon signed rank test. Findings indicated that the challenges related to political issues have the most significant effect on resourcing the PDHR. The main key challenges are: (1) Difficulties to obtain permits from the Israeli side to flow the reconstruction materials into the Gaza Strip, (2) Insufficient funds for reconstruction efforts and (3) Refusal of the international community to contact the local de facto government. This research fills the knowledge gap relating to Gaza and provides the basis for more research on resourcing problems. This research has also extended, updated and confirmed the current knowledge regarding challenges hindering the resourcing for PDHR. The results draw attention of the implementing agencies in Gaza to the factors that creating bottlenecks to resource the reconstruction projects in order to overcome them and to mitigate their negative effects.","PeriodicalId":51876,"journal":{"name":"Journal of Construction in Developing Countries","volume":"30 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2021-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Challenges Hindering the Resourcing for Post-Disaster Housing Reconstruction in Gaza\",\"authors\":\"Nour Saleh, A. Enshassi, M. Sundermeier\",\"doi\":\"10.21315/jcdc2021.26.2.9\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Resourcing post-disaster housing reconstruction (PDHR) entails many drawbacks creating bottlenecks to reconstruction projects. Understanding these vulnerable issues is of utmost to identify the appropriate interventions to mitigate their effects. The devastating aggression in 2014 in Gaza Strip served as a typical example of resources hampers. Based on the quantitative approach, the research employed a self-administrated questionnaire survey to identify the most significant challenges hindering the resourcing for post-2014 aggression housing reconstruction. The questionnaire targeted 55 of the key people in the implementing agencies of post-2014 aggression housing reconstruction. The data collected was analysed using descriptive statistics, through frequency distribution and effect index (EI); and using inferential statistics through one sample Wilcoxon signed rank test. Findings indicated that the challenges related to political issues have the most significant effect on resourcing the PDHR. The main key challenges are: (1) Difficulties to obtain permits from the Israeli side to flow the reconstruction materials into the Gaza Strip, (2) Insufficient funds for reconstruction efforts and (3) Refusal of the international community to contact the local de facto government. This research fills the knowledge gap relating to Gaza and provides the basis for more research on resourcing problems. This research has also extended, updated and confirmed the current knowledge regarding challenges hindering the resourcing for PDHR. The results draw attention of the implementing agencies in Gaza to the factors that creating bottlenecks to resource the reconstruction projects in order to overcome them and to mitigate their negative effects.\",\"PeriodicalId\":51876,\"journal\":{\"name\":\"Journal of Construction in Developing Countries\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2021-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Construction in Developing Countries\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21315/jcdc2021.26.2.9\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction in Developing Countries","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21315/jcdc2021.26.2.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Challenges Hindering the Resourcing for Post-Disaster Housing Reconstruction in Gaza
Resourcing post-disaster housing reconstruction (PDHR) entails many drawbacks creating bottlenecks to reconstruction projects. Understanding these vulnerable issues is of utmost to identify the appropriate interventions to mitigate their effects. The devastating aggression in 2014 in Gaza Strip served as a typical example of resources hampers. Based on the quantitative approach, the research employed a self-administrated questionnaire survey to identify the most significant challenges hindering the resourcing for post-2014 aggression housing reconstruction. The questionnaire targeted 55 of the key people in the implementing agencies of post-2014 aggression housing reconstruction. The data collected was analysed using descriptive statistics, through frequency distribution and effect index (EI); and using inferential statistics through one sample Wilcoxon signed rank test. Findings indicated that the challenges related to political issues have the most significant effect on resourcing the PDHR. The main key challenges are: (1) Difficulties to obtain permits from the Israeli side to flow the reconstruction materials into the Gaza Strip, (2) Insufficient funds for reconstruction efforts and (3) Refusal of the international community to contact the local de facto government. This research fills the knowledge gap relating to Gaza and provides the basis for more research on resourcing problems. This research has also extended, updated and confirmed the current knowledge regarding challenges hindering the resourcing for PDHR. The results draw attention of the implementing agencies in Gaza to the factors that creating bottlenecks to resource the reconstruction projects in order to overcome them and to mitigate their negative effects.
期刊介绍:
The Journal of Construction in Developing Countries seeks to provide a central vehicle for the exchange and dissemination of knowledge on issues relevant to the built environment of developing countries. The journal provides a wide range of original research an application papers on current developments and advances in the built environment as well as the economic, social, cultural and technological contexts of developing countries. It also publishes detailed case studies, as well as short communications and discussions. Topics covered include, but are not restricted to planning, urban economics, rural and regional development, housing, management and resource issues, sustiainability, knowledge and technology transfer, construction procurement, facilities management, information an communication technologies, strategies and policy issues, design issues, conservation and environmental issues.